• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 41 páginas
Examen

G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH COMPLETE SOLUTIONS 100% VERIFIED !!

Document preview thumbnail
Vista previa 4 fuera de 41 páginas

G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH COMPLETE SOLUTIONS 100% VERIFIED !!

Vista previa del contenido

G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH
COMPLETE SOLUTIONS 100% VERIFIED!!! ALREADY GRADED A+



G-60 - (answer)Use of oxygen and flammable gasses, or LPG or CNG for any hot work



COF exception - (answer)Torch operations for jewelry



FDNY permit - (answer)Storing using or handling



oxygen and flammable gas



in excess of 400scf (LPG, CNG or scetylene)



oxidizing gass in excess of 504scf



Portable LPG must not be stored when the capacity of the container is greater than? - (answer)16.4 oz



Portable CNG containers must not be stored then the capacity is greater than? - (answer)8.7 SCF



Single standard portable LPG containers must not exceed? - (answer)100LBs in weight



Single CNG containers must not exceed? - (answer)381 SCF



LPG

400 SCF is approximately - (answer)47 lbs



Types of FDNY permits - (answer)Site specific permits



City wide permits

,G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH
COMPLETE SOLUTIONS 100% VERIFIED!!! ALREADY GRADED A+




Transportation permits



Site specific permit can be? - (answer)Can be permenant or temperary



Permanent permits are valid for how long? - (answer)12 months only.



Permits and renewals require inspection and will expire adter twelve months.



Temporary permits may be valid from? - (answer)One day to 12 months depending on the construction
or operations needed.



City wise permit duration? - (answer)30 days



Hazards out end of day



Quantity of hazardous material being stored(maximum)? - (answer)5 gals gasoline

250 gals of flammable

300 gals combustible liquid



Transportation permit - (answer)FDNY approved inspected displayed on vehicle



Hot work authorization. - (answer)Required for any project with hot work operation but not issued by
the FDNY



Responsible person - (answer)Must be available for inspection by any representative of fire department
during and 48 hours after the work is complete.

,G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH
COMPLETE SOLUTIONS 100% VERIFIED!!! ALREADY GRADED A+



Fire guard - (answer)Cof holder who is trained in and responsible for maintaijjng a fire watch.



Fire watch - (answer)Survailance of an area

Detect signs of early fire

Raise alarms

Notify department



Pre hot work check must be conducted by the responsible person before hot work is authorized at least?
- (answer)Once per day



Pre hot work check daily and must very the following - (answer)Equipment working in order



Hot work is clear of combistibles and flammable solids



Combustible and non combustible are protected



Fire watch personel are assigned



Fire extinguisher available



Fire watch - (answer)A fire watch must be maintained during any hot work operation.



The person conducting a fire watch shall - (answer)Not have other duties



Fire watch

, G-60, G60, F-60 FIRE GUARD, F-60 STUDY MATERIAL WITH
COMPLETE SOLUTIONS 100% VERIFIED!!! ALREADY GRADED A+



At least one portable fire extinguisher with a - (answer)Minimum 2-A:20-B:C rating shall be accessible
within 30ft from hot work



Fire watch



Exception roofing operating fire extinguisher - (answer)3-A 40-B:C



Fire watch for torch operations conducted at following locations by a F-60 fire guard: -
(answer)Construction sites



Buildings and structures



Rooftops



Fire watch must continue for - (answer)30 minutes after the conclusing of the work.



Time and record keeping requirements



CNG or LPG torch operations inspections - (answer)First shall be conducted 30minute after completion



Second inspection 1 hour after completion



The inspection report must be available - (answer)48 hours after work is complete for fire department
representative to look over.



Oxygen cylinder is made of - (answer)Steel and contains 100% oxygen



Oxy propane degrees - (answer)1,500 degrees

Información del documento

Subido en
20 de agosto de 2026
Número de páginas
41
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
AugStudier
5.0
(502)
Vendido
3200
Seguidores
2
Artículos
529
Última venta
11 horas hace

Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes