Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

Dates & Time Lengths UST Exam Questions | Study Guide & Practice Test

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

Dates & Time Lengths UST Exam study resource featuring practice questions and answers focused on key dates, time periods, deadlines, testing requirements, and regulatory concepts related to UST certification and underground storage tank operations.

Vista previa del contenido

Dates & Time Lengths - UST Exam
47.) Within _____ calendar days of receiving an inspection report from either the local agency or
the special inspector, the permit holder shall implement the corrections specified in the
inspection report.
a.) 30
b.) 45
c.) 60
d.) 15 - ANS-a.) 30
CCR Title 23, Sec 2712(f)

A service technician has performed calibration and maintenance on an ATG probe; this
maintenance record must be kept on file for ______________.
a.) 6.5 years
b.) 3 years
c.) 5 years
d.) Life of the UST system - ANS-c.) 5 years
CCR Title 23, Sec 2712(b)

A tank integrity test is required every _____ when statistical inventory reconciliation is used.
a.) 2 years
b.) Year
c.) 3 years
d.) Never - ANS-a.) 2 years
CCR Title 23, Sec 2643(b)(3)

A UST Owner or operator shall maintain a copy of the designated operator's monthly inspection
record and all attachments for the previous
a. 1 Month
b. 12 months
c. 36 month
d. 60 months - ANS-b. 12 months
CCR; 2715 (e)

According to California Law, UST systems installed after July 1, 2003, require a one-time ELD
test to ensure that the tank is product tight...
a.) If the tank is located within one (1) mile of a public drinking water well
b.) If the tank is located within 1000 feet of a public drinking water well
c.) Unless the tank is equipped with secondary containment
d.) In all cases - ANS-For ALL tanks before use (H&SC 25290.2 (I))d.) In all casesH&SC, Sec
25290.2(i)

, According to Title 23, CCR, UST Regulations, results of the tank tightness testing used to
monitor the tank must be retained for what period of time?
a. For a period of 3 years
b. For the life of the facility
c. Until the next tightness test is conducted
d. Until you are sure a release has not occurred - ANS-a. For a period of 3 years
CCR; 2712

Additional pressurized piping monitoring options become effective November 9, 2004. Which of
the following will not be a monitoring requirement for non-emergency generator, double wall,
pressurized product piping after November 9, 2004?
a. Continuous monitoring system that either activates an audible and visual alarm or stops the
flow of product at the dispenser when it detects a leak for all secondary containment, including
under-dispenser containment.
b. A 3.0-gph automatic line leak detector must be installed.
c. An annual 0.1 piping test or positive pump shut-down and fail safe for all secondary
containment, except for the UDC monitoring.
d. An annual 0.1 piping test or a monthly 0.2 gph pipe must be conducted. - ANS-d. An annual
0.1 piping test or a monthly 0.2 gph pipe must be conducted.
CCR; 2626 (f) (monthly 0.2 gph is not authorized)

All of the following are conditions of an UST operating permit, EXCEPT
a. UST owner or operator must comply with release reporting & recording requirements in 23
CCR, Article 5
b. Results of local agency inspections must be maintained for three years.
c. Written performance claims must be maintained for 5 years.
d. Monitoring & maintenance records must be maintained for at least three years.
e. Records of repairs, lining and upgrades must be maintained for the life of the tank - ANS-b.
Results of local agency inspections must be maintained for three years.
CCR; 2712 (a) &(b)

All of the following are correct for single wall, pressurized, gasoline piping after December 22,
1998, EXCEPT?
a. It must be monitored by an annual 0.1 gph test or monthly 0.2 gph test
b. It must be also be monitored by an hourly 3.0 gph test
c. The 3.0 gph monitoring shall restrict fuel flow or initiate an alarm if an unauthorized release
occurs.
d. The 3.0 gph monitoring shall shut down the pump if it fails or is disconnected. - ANS-c. The
3.0 gph monitoring shall restrict fuel flow or initiate an alarm if an unauthorized release occurs.
CCR; 2643 (c) & 2666

All of the following are correct regarding when secondary containment must be tested,
EXCEPT?
a. Secondary containment systems must be tested every 36 months.

Información del documento

Subido en
19 de agosto de 2026
Número de páginas
13
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
nurshingschools
3.0
(3)
Vendido
1247
Seguidores
1
Artículos
553
Última venta
20 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes