What is NYC Chapter 33? What is Section 3301 and 3302? - Answer Ch 33 = Safeguards During Construction or Demolition 3301 = General 3302 = Definitions What do you do when code does not specifically state inspection is needed on an equipment? - Answer [3301.4.1] Any equipment (except hand tools) that affects safety of public or property shall be inspected by a COMPETENT PERSON designated by the contractor using the equipment This inspection shall be documented in an inspection checklist signed and dated by the CP Who is responsible for maintaining construction/demo signs? - Answer [3301.9] The permit holder for the construction/demo work If no active permits, then the building owner Name the (8) items that need to be listed on a Project Information Panel - Answer [3301.9.1] 1. Rendering, elevation drawing, or zoning diagram 2. "Work in Progress" Title and specifying zoning use 3. Anticipated project completion date 4. Property owner's corporate name, address, phone # 5. Website address or phone # to contact 6. GC name and phone # 7. "To anonymously report unsafe conditions..call 311" in English and Spanish 8. Primary project permit (laminated) Where should the Project Information Panel be posted? How high up? - Answer [3301.9.1.2] On the fence on each perimeter -if the perimeter is greater than 150ft, post at each corner - posted 4ft high from the ground to the bottom edge of the panel

Vista previa del contenido

Final-SSM-Examination with All Accurate
Solutions 2026 Updated.
What is NYC Chapter 33?

What is Section 3301 and 3302? - Answer Ch 33 = Safeguards During Construction or
Demolition

3301 = General

3302 = Definitions



What do you do when code does not specifically state inspection is needed on an equipment? -
Answer [3301.4.1]

Any equipment (except hand tools) that affects safety of public or property shall be inspected by
a COMPETENT PERSON designated by the contractor using the equipment



This inspection shall be documented in an inspection checklist signed and dated by the CP



Who is responsible for maintaining construction/demo signs? - Answer [3301.9]

The permit holder for the construction/demo work

If no active permits, then the building owner



Name the (8) items that need to be listed on a Project Information Panel - Answer [3301.9.1]

1. Rendering, elevation drawing, or zoning diagram

2. "Work in Progress" Title and specifying zoning use

3. Anticipated project completion date

4. Property owner's corporate name, address, phone #

5. Website address or phone # to contact

6. GC name and phone #

7. "To anonymously report unsafe conditions..call 311" in English and Spanish

8. Primary project permit (laminated)



Where should the Project Information Panel be posted?

How high up? - Answer [3301.9.1.2]

On the fence on each perimeter

-if the perimeter is greater than 150ft, post at each corner

- posted 4ft high from the ground to the bottom edge of the panel

,Name the specs of the Project Information Panel and the (2) exceptions - Answer [3301.9.1.4]

6 ft wide x 4 ft high

Exceptions:

1) for demo project = 2'-4" wide x 4ft high

2) Sites that have street frontage less than 60 ft = 55" wide x 36.5" high



What contents should be on the SWS parapet info panel? (3) - Answer [3301.9.2.1]

1) Street address of the site

2) Name of contractor responsible for site...if not, then the owner

3) The statement "For more info, visit NYC.GOV/BUILDINGS"



Name the (4) requirements of posting SWS parapet info panel - Answer [3301.9.2.2]

1) Posted along the long axis of the SWS

2) Shall not be posted above/below parapet

3) Between 3-6 feet from the left edge SWS or property line

4) Centered above project info panel on Fence



What dimension shall the SWS parapet info panel be? - Answer [3301.9.2.4]

3 ft high x 6 ft wide



When do you need site safety orientation and refresher? - Answer [3301.11]

- Orientation needed for each worker at any site that requires SSM/SSC/superintendent

- Refresher is needed after (1) year for each worker still working at the same site



Who can conduct the site safety orientation and refresher? - Answer [3301.11.3]

A qualified person designated by the permit holder

This qualified person shall have ability to communicate with each worker



What contents should be included in site safety orientation and refresher? - Answer
[3301.11.4]

1) A review of safety procedures and any hazardous activities to be performed at the site

2) Information pertaining to site safety training SST as required in Section 3321



Describe how the site safety orientation and refresher is recorded - Answer [3301.11.5]

, Records shall be maintained by permit holder and kept at the jobsite

1) Date and time of orientation/refresher

2) Name, title, and company of each worker

3) Name, title, company, and signature of the qualified person who conducted the orientation



What are the contents of a pre-shift meeting? Who can conduct them? - Answer [3301.12]

- Shall include review of activities and tasks to be performed during the workshift, including
specific safety concerns or risks

- A competent person of the permit holder or subcontractor



When is a primary construction superintendent required? (3 conditions) - Answer [3301.13.3]

1) Construction of a new building

2) Full demo of an existing building

3) Alteration of existing building that involves one or more of the following:

- Vertical enlargement

- Horizontal enlargement

- Alteration or demo of more than 50% of the GFA of the building

- Removal of one or more floors

- Work that requires special inspection for underpinning

- Work that requires special inspection for protection of sides of excavation



When is a construction superintendent not required? - Answer [3301.13.3]

For work on 1,2,3 family building provided the permit holder for the work is registered as a GC



Name the limitations on the # of designations that superintendent can hold - Answer
[3301.13.6]

1) If site is a major building, individual can only be signed onto that job

2) Starting Jan 2022, cannot be designated on more than 5 jobs

3) Starting Jan 2024, 3 jobs

4) Starting Jan 2026, 1 job and must be on jobsite permanently



Name the (8) exceptions that construction superintendent is not required to be on the jobsite -
Answer [3301.13.7]

1) Surveying work

2) Use of hoist exterior to building to transport personnel only

3) Use of hoist enclosed within perimeter of building to transport personnel or materials

Información del documento

Subido en
16 de agosto de 2026
Número de páginas
21
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
COCOSOLUTIONS
4.2
(37)
Vendido
220
Seguidores
16
Artículos
9281
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes