Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

Final Exam for Construction Project Management Questions and Correct Answers.

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

What include in team structure - Answer Project Manager / Superintendent Project Engineer BIM Coordinator Scheduler Estimator Safety Manager what is responsibilities of PX - Answer Promising to the owner to deliver what is committed to proposal and in the presentation, and to provide the right resources for the project's success What is responsibilities for PM - Answer day to day contact for the owner. The PM oversees the project; including both design and construction what is responsibilities for Superintendent - Answer understand the owner's performance criteria and incorporate it into the program and design what is responsibilities for Estimator - Answer provide the owner with timely updates to the budget and keep the design manager in check, so the designer doesn't design elements that the budget cannot accomodate what is responsibilities for scheduler - Answer work with the superintendent to provide the baseline schedule and contractual update what are City and Agency Requirements - Answer Cal OSHA AQMD Allowable work hour (noise) Security Fence ( Green Screening) Roadways permanent paving, temporary base Subcontractor and Vendor job site access Emergency vehicle access Stormwater pollution prevention program SWPPP year-round Jurisdiction Approved traffic and haul route plan

Vista previa del contenido

Final Exam for Construction Project
Management Questions and Correct
Answers.
What include in team structure - Answer Project Manager / Superintendent

Project Engineer

BIM Coordinator

Scheduler

Estimator

Safety Manager



what is responsibilities of PX - Answer Promising to the owner to deliver what is committed to
proposal and in the presentation, and to provide the right resources for the project's success



What is responsibilities for PM - Answer day to day contact for the owner. The PM oversees
the project; including both design and construction



what is responsibilities for Superintendent - Answer understand the owner's performance
criteria and incorporate it into the program and design



what is responsibilities for Estimator - Answer provide the owner with timely updates to the
budget and keep the design manager in check, so the designer doesn't design elements that the
budget cannot accomodate



what is responsibilities for scheduler - Answer work with the superintendent to provide the
baseline schedule and contractual update



what are City and Agency Requirements - Answer Cal OSHA

AQMD

Allowable work hour (noise)

Security Fence ( Green Screening)

Roadways permanent paving, temporary base

Subcontractor and Vendor job site access

Emergency vehicle access

Stormwater pollution prevention program SWPPP year-round

Jurisdiction Approved traffic and haul route plan

, City permits



Building Requirements - Answer Jobsite safety

Job office, trailer occupants, office size

temporary power

communication ( phone / data)

toilets (Men/women)

Temporary Utilities (power, water, etc)

Dumpster and recycling/segregating trash materials

LEED - requirements and best management practices (BMP's mechanical, electrical, indoor air
quality)

Lay down area ( material strorage)

Concrete washout

subcontractor offices

sequencing of construction workers

security - city and police and university requirement

cranes / man lift

job signage

monitoring visitors, public and workers looking for work

two gate system, union issues

quality plan

comminity/ neighbor, outreach



what are 5 adverse repercussion ( negative consequences) of poor risk management practices -
Answer Safety

reputation

employee retention/loss of morale

legal

financial (short term and/or long term)



Project Overview and Life Cycle - Answer Concept

RFQ and RFP Design

Award Design

Program

RFQ and RFP Build

Información del documento

Subido en
16 de agosto de 2026
Número de páginas
8
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
COCOSOLUTIONS
4.2
(37)
Vendido
220
Seguidores
16
Artículos
9281
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes