PM: - Answer Project manager PO: - Answer Purchase order PPP: - Answer Public-private partnership QA: - Answer Quality assurance QC: - Answer Quality control RFI: - Answer Request for information RFP: - Answer Request for proposal RFQ: - Answer Request for qualifications ROM: - Answer Rough order of magnitude SWPPP: - Answer Storm water pollution prevention plans WBS: - Answer Work breakdown structure BIM: - Answer Building information model CAD: - Answer Computer-aided design CD: - Answer Construction document CM: - Answer Construction manager CSI: - Answer Construction Specification Institute

Vista previa del contenido

Final Construction Management Jump
Start Questions and Answers.
PM: - Answer Project manager



PO: - Answer Purchase order



PPP: - Answer Public-private partnership



QA: - Answer Quality assurance



QC: - Answer Quality control



RFI: - Answer Request for information



RFP: - Answer Request for proposal



RFQ: - Answer Request for qualifications



ROM: - Answer Rough order of magnitude



SWPPP: - Answer Storm water pollution prevention plans



WBS: - Answer Work breakdown structure



BIM: - Answer Building information model



CAD: - Answer Computer-aided design



CD: - Answer Construction document



CM: - Answer Construction manager



CSI: - Answer Construction Specification Institute

, DB - Answer Design-build



DD: - Answer Design development



FOR: - Answer Field observation report



GC: - Answer General contractor



GMP: - Answer Guaranteed maximum price



IPD: - Answer Integrated project delivery



LEED: - Answer Leadership in Energy and Environmental Design



What are the five primary sectors of the construction industry? - Answer residential,
commercial, heavy civil, industrial, and environmental construction.



What is the role of the owner on a construction project? - Answer develop the program for the
building, define the scope of the project, create the budget, and provide the funding for the
project.



What does LEED stand for, and what is its purpose? - Answer Leadership in Energy and
Environmental Design. A rating system that evaluates a building's environmental performance
over its life cycle.



What is lean construction, and from what industry does its concepts stem? - Answer Lean
construction is a philosophy that focuses on adding value with less work and the elimination of
waste in the building process. It stems from the manufacturing industry, particularly the Toyota
Production System.



Distinguish between construction management as a function and construction management as
a project delivery method. - Answer The construction management function is estimating,
scheduling, cost control, and contract administration in order to monitor, manage, and control
the work of the contract for which the contractor is obligated. Construction management as a
project delivery method is a contractual arrangement.



Identify at least three characteristics that make the construction project unique from other
industry sector projects. - Answer Each construction project is built as a one-of-a-kind
structure or facility. Every construction project is built on a different and unique building site.
The building process takes place outside. Much of the work is performed by the human hand.

Información del documento

Subido en
16 de agosto de 2026
Número de páginas
13
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
COCOSOLUTIONS
4.2
(37)
Vendido
220
Seguidores
16
Artículos
9281
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes