• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 58 páginas
Examen

CDT 2 HIGH ACTUAL EXAM SOLVED QUESTIONS COMPLETE PREPARATION RESOURCE

Document preview thumbnail
Vista previa 4 fuera de 58 páginas

CDT 2 HIGH ACTUAL EXAM SOLVED QUESTIONS COMPLETE PREPARATION RESOURCE

Vista previa del contenido

CDT 2 HIGH-YIELD DENTAL ASSISTING SKILLS
AND CLINICAL PRACTICE SUMMARY 2026

◉ How long does a contractor required to execute corrections in the
Work after Substantial Completion.
Answer: one year


◉ "Which of the following would be included in Available
Information?


a. Bid security requirements
b. Environmental Impact Statement
c. Time of completion to construct the project
d. Description of the Work


Review: PDPG 11.4.5".
Answer: "b. Environmental Impact Statement


Available Information is the place to provide reference information
such as this that doesn't belong in the contract. Bid security info? In
the Instructions for Procurement. Time of Completion? It's
contractual - where would you put it? Description of Work? Name
the Division 01 section where that belongs."

,◉ "Instructions for Procurement:


a. Are used only on private projects
b. Frequently are standard industry forms
c. May include the geotechnical report as an attachment
d. Are binding upon the Contractor


Review: PDPG 11.4.4
".
Answer: "b. Frequently are standard industry forms


Both AIA and EJCDC offer standard printed Instructions to Bidders
forms. If necessary, a Supplementary Instructions to Bidders can
customize the Instructions to suit special project conditions.


Did you notice? The PDPG uses the term ""Instructions for
Procurement"" as an umbrella term for both bid and negotiated
projects. MasterFormat lists both terms: Instructions for
Procurement, and the more specific documents Instructions to
Bidders or Instructions to Proposers."


◉ "Marked-up or corrected contract drawings that indicate changes
incorporated in the Work are:

,a. Contract forms
b. Closeout submittals
c. Record drawings
d. As-builts
e. Not required for private work


Review: PDPG 11.2.3.5".
Answer: "c. Record drawings


These drawings incorporate all issued modifications and significant
field changes in scope. The term ""as-builts"" is discouraged, as we
are often unable to certify the accuracy of actual installations and
field-recorded information."


◉ "Contractual clauses in the Conditions of the Contract:


a. Have priority over Division 01
b. Are superseded by Division 01
c. Are expanded upon by the provisions of Division 01
d. Are independent, and Division 01 provisions have no effect

, Review: PDPG 11.2.9".
Answer: "c. Are expanded upon by the provisions of Division 01


The key word is ""expanded."" Division 01 General Requirements are
detailed. They address administrative and procedural level issues.
The Conditions of the Contract say: ""Do this."" The General
Requirements say: ""Do it like this."" And don't forget the concept of
""complementary documents."" No provisions have priority over, are
superseded by, or are independent of, other provisions in the
contract documents - they are ""complementary."""


◉ "In the specifications, the stated requirements address:


a. The owner's responsibilities
b. The contractor's responsibilities
c. The subcontractor's responsibilities
d. The architect's responsibilities
e. All of the above


Review: PDPG 11.3.4.3".
Answer: "b. The contractor's responsibilities


The owner and the contractor are the sole parties to the contract.
The requirements of the specifications address the contractor. Other

Información del documento

Subido en
16 de agosto de 2026
Número de páginas
58
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$17.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TopGradeInsider
4.2
(13)
Vendido
178
Seguidores
2
Artículos
57769
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes