NACE CIP 1 CBT EXAM PRACTICE QUESTIONS
Dew point is the temperature at which condensation occurs.
You are the NACE Inspector on a tank lining project Document the problem and advise the Contractor and Owner's representative.
where a 50% solids epoxy tank lining is being applied.
After application of the 19 coat you notice small blisters
in some areas of the applied lining. Your FIRST
preferred course of action is to:
If a contractor is using a poorly maintained compressor blotter test for the presence of oil and water.
to supply air for abrasive blast cleaning and
conventional airspray, the coating inspector should
perform a
Upon arrival of coating materials, the inspector should observe and document the amount of material and batch numbers.
Relative humidity is a measure of the amount of moisture in the air compared to saturation level.
Galvanic corrosion occurs on which of the following Metal
substrates?
When applying Thermal Spray Coatings the SSPC-CS 23.00/AWS C2.23/NACE No. 12
specification is most likely to reference:
What is the minimum recommended distance away from 2.5 cm (1 inch)
an edge that an inspector should take a measurement
with a dial type magnetic pull off Dry Film
Thickness(DFT) gauge?
Polymerization is the process of? Monomers joining together.
An exposed area of the substrate or previous coat of a Holiday
conductive material, often caused by poor application
technique is called:
Checking is: a fine crack in the surface of a coating that rarely reaches the substrate.
Inspection documentation is important because: Owners use the documentation for a variety of purposes.
, NACE CIP 1 CBT EXAM PRACTICE QUESTIONS
An Inspectors personal log book should contain: No comments regarding the application team.
You have just received your NACE CIP Level 1 Review the NACE Attestation prior to making a decision.
certification when you are asked to supervise a team of
uncertified field pipeline inspectors. Your FIRST
preferred course of action is to:
Good record can provide maintenance departments How the item was coated.
with detailed information about ALL of the following
EXCEPT:
Non Conformance Reports are completed by the When the Inspector and Contractor deem it to be significant non conforming
Inspector: item.
The initial steel condition is important to the NACE The Inspector may have to reject the steel.
Inspector because:
The form of corrosion that has the largest potential for Galvanic Corrosion
unexpected catastrophic failure is:
What is used to determine compressed air cleanliness? Profilometer
Osmotic blistering is most likely to occur as a result of: Airless spray application.
When performing tests for oil and grease using an ultra Synthetic oil or grease may not be identified.
violet light, the NACE Inspector should be aware that:
To achieve consistently accurate results with ALL alt test wash your hands before sampling.
equipment:
When holiday testing is required the Inspector is always NACE SP 0188
required to enforce what standard?
If the specifier does not identify a restriction level in Level 3
accordance with SSPC PA 2, the default restriction level
is:
Fine cracks in the surface of a coating that rarely reach Checking
the substrate are called:
It is good practice for the NACE Inspector to have At all times.
instrument calibration certificates available:
Dew point is the temperature at which condensation occurs.
You are the NACE Inspector on a tank lining project Document the problem and advise the Contractor and Owner's representative.
where a 50% solids epoxy tank lining is being applied.
After application of the 19 coat you notice small blisters
in some areas of the applied lining. Your FIRST
preferred course of action is to:
If a contractor is using a poorly maintained compressor blotter test for the presence of oil and water.
to supply air for abrasive blast cleaning and
conventional airspray, the coating inspector should
perform a
Upon arrival of coating materials, the inspector should observe and document the amount of material and batch numbers.
Relative humidity is a measure of the amount of moisture in the air compared to saturation level.
Galvanic corrosion occurs on which of the following Metal
substrates?
When applying Thermal Spray Coatings the SSPC-CS 23.00/AWS C2.23/NACE No. 12
specification is most likely to reference:
What is the minimum recommended distance away from 2.5 cm (1 inch)
an edge that an inspector should take a measurement
with a dial type magnetic pull off Dry Film
Thickness(DFT) gauge?
Polymerization is the process of? Monomers joining together.
An exposed area of the substrate or previous coat of a Holiday
conductive material, often caused by poor application
technique is called:
Checking is: a fine crack in the surface of a coating that rarely reaches the substrate.
Inspection documentation is important because: Owners use the documentation for a variety of purposes.
, NACE CIP 1 CBT EXAM PRACTICE QUESTIONS
An Inspectors personal log book should contain: No comments regarding the application team.
You have just received your NACE CIP Level 1 Review the NACE Attestation prior to making a decision.
certification when you are asked to supervise a team of
uncertified field pipeline inspectors. Your FIRST
preferred course of action is to:
Good record can provide maintenance departments How the item was coated.
with detailed information about ALL of the following
EXCEPT:
Non Conformance Reports are completed by the When the Inspector and Contractor deem it to be significant non conforming
Inspector: item.
The initial steel condition is important to the NACE The Inspector may have to reject the steel.
Inspector because:
The form of corrosion that has the largest potential for Galvanic Corrosion
unexpected catastrophic failure is:
What is used to determine compressed air cleanliness? Profilometer
Osmotic blistering is most likely to occur as a result of: Airless spray application.
When performing tests for oil and grease using an ultra Synthetic oil or grease may not be identified.
violet light, the NACE Inspector should be aware that:
To achieve consistently accurate results with ALL alt test wash your hands before sampling.
equipment:
When holiday testing is required the Inspector is always NACE SP 0188
required to enforce what standard?
If the specifier does not identify a restriction level in Level 3
accordance with SSPC PA 2, the default restriction level
is:
Fine cracks in the surface of a coating that rarely reach Checking
the substrate are called:
It is good practice for the NACE Inspector to have At all times.
instrument calibration certificates available: