MEDICAL GAS 6010 INSTALLERS EXAM | COMPLETE QUESTIONS WITH EXPERT
SOLUTION | 2026 LATEST UPDATED GET A+
1. Which of the following would NOT be deemed as breach of a medical-sur-
gical vacuum system?: Testing a piping system component with a leak-detectant that does not contain ammonia
2. system is an assembly of equipment such as storage containers, pressure regulators, pressure relief devices,
vaporizers, manifolds, and interconnecting piping that has a storage capacity of more than 20,000 cubic feet of normal
temperature and pressure, including unconnected reserves as held at the site.: Bulk Oxygen
3. Which of the following is a TRUE statement of Category 1 medical support gases?: Primarily used in powering
equipment used in patient care procedures
4. Prior to the production welding of stainless-steel tube, the NFPA 99 requires
welders shall be qualifir welding performance in compliance with which stan-
dard?: American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code, Section IX
5. Performance qualification of brazers shall remain in effect indefinitely unless the brazer does NOT braze with
the qualified procedure for a period exceeding _____ month or there is a specific reason to question the ability of the
brazer: Six
6. All positive pressure Category 1 medical gas supply systems shall be provided with means to control the final
line pressure at the source and include: Protection against overpressure
7. What does it mean when equipment, materials, or services are shown as
'listed"?: They are included in a list published by an organization that is acceptable to the authority having jurisdiction
8. Compressed gas cylinders must meet all EXCEPT which of the following criteria in order to be acceptable f i n a
Category 1 health care facility?: Identified with black marker
9. The installer-performed initial pressure test requires that testing shall be
, conducted: Prior to the instalation of components of the distribution piping systen that woula e danaged by ef pesure
10. According to the NFPA99, an oxygen-enriched atmosphere is one where the concentration of oxygen exceeds
_______ percent per volume.: 23.5
11 Regarding the nitrogen purge for brazing, the final brazed connection of new piping to an existing pipeline
containing the system gas shall be permitted to be made without the use of a nitrogen purge. For pressure gases,
immediately after the final brazed connection is made and leak tested, an outlet in the new piping and an outlet in the
existing piping that are immediately downstream from the point or area of intrusion shall be purged in accordance with
the applicable requirements of the — in order to remove any traces of particulate matter deposited in the pipeline.:
piping purge test
12. Who is the individual responsible for reviewing all inspection and testing
reports prior to the use of new additional, renovated, or temporary medical gas and vacuum installations?: Responsible
facility authority
13. All Master, area, and local alarm systems used for medical gas and vacuum systems shall include _________
indication that communication with an alarm-initiating device is disconnected.: Audible and Visual
14. An assembly of equipment that has a capacity of oxygen greater than ______ is defined as s bulk oxygen system:
20,000 Ft3
15. The locations for medical gas central supply systems and the storage of positive pressure gases, excluding
cryogenic fluid central supply systems, requiring heating to maintain compliant enclosure temperatures, shall meet
which of the following requirements?: in room heating element maximum allowable temperature of 266 degrees F
16. Which of the following would describe an assembly of equipment for supplying compressed gas that terminates
where the gas, at service pressure, first enters the main line? The source gas is stored as a compressed gas or cryogenic
fluid in storage containers that are either stationary or movable and include unconnected reserves on hand at the site.:
Bulk Oxygen
SOLUTION | 2026 LATEST UPDATED GET A+
1. Which of the following would NOT be deemed as breach of a medical-sur-
gical vacuum system?: Testing a piping system component with a leak-detectant that does not contain ammonia
2. system is an assembly of equipment such as storage containers, pressure regulators, pressure relief devices,
vaporizers, manifolds, and interconnecting piping that has a storage capacity of more than 20,000 cubic feet of normal
temperature and pressure, including unconnected reserves as held at the site.: Bulk Oxygen
3. Which of the following is a TRUE statement of Category 1 medical support gases?: Primarily used in powering
equipment used in patient care procedures
4. Prior to the production welding of stainless-steel tube, the NFPA 99 requires
welders shall be qualifir welding performance in compliance with which stan-
dard?: American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code, Section IX
5. Performance qualification of brazers shall remain in effect indefinitely unless the brazer does NOT braze with
the qualified procedure for a period exceeding _____ month or there is a specific reason to question the ability of the
brazer: Six
6. All positive pressure Category 1 medical gas supply systems shall be provided with means to control the final
line pressure at the source and include: Protection against overpressure
7. What does it mean when equipment, materials, or services are shown as
'listed"?: They are included in a list published by an organization that is acceptable to the authority having jurisdiction
8. Compressed gas cylinders must meet all EXCEPT which of the following criteria in order to be acceptable f i n a
Category 1 health care facility?: Identified with black marker
9. The installer-performed initial pressure test requires that testing shall be
, conducted: Prior to the instalation of components of the distribution piping systen that woula e danaged by ef pesure
10. According to the NFPA99, an oxygen-enriched atmosphere is one where the concentration of oxygen exceeds
_______ percent per volume.: 23.5
11 Regarding the nitrogen purge for brazing, the final brazed connection of new piping to an existing pipeline
containing the system gas shall be permitted to be made without the use of a nitrogen purge. For pressure gases,
immediately after the final brazed connection is made and leak tested, an outlet in the new piping and an outlet in the
existing piping that are immediately downstream from the point or area of intrusion shall be purged in accordance with
the applicable requirements of the — in order to remove any traces of particulate matter deposited in the pipeline.:
piping purge test
12. Who is the individual responsible for reviewing all inspection and testing
reports prior to the use of new additional, renovated, or temporary medical gas and vacuum installations?: Responsible
facility authority
13. All Master, area, and local alarm systems used for medical gas and vacuum systems shall include _________
indication that communication with an alarm-initiating device is disconnected.: Audible and Visual
14. An assembly of equipment that has a capacity of oxygen greater than ______ is defined as s bulk oxygen system:
20,000 Ft3
15. The locations for medical gas central supply systems and the storage of positive pressure gases, excluding
cryogenic fluid central supply systems, requiring heating to maintain compliant enclosure temperatures, shall meet
which of the following requirements?: in room heating element maximum allowable temperature of 266 degrees F
16. Which of the following would describe an assembly of equipment for supplying compressed gas that terminates
where the gas, at service pressure, first enters the main line? The source gas is stored as a compressed gas or cryogenic
fluid in storage containers that are either stationary or movable and include unconnected reserves on hand at the site.:
Bulk Oxygen