Examen

CSLB B License General Contractor Exam 330 Questions and Correct Answers 2026/2027

Document preview thumbnail
Vista previa 4 fuera de 41 páginas

Study resource designed for the CSLB B License General Contractor Exam, featuring 330 practice questions and correct answers. Covers general building construction, project planning, estimating, construction methods, structural systems, materials, safety requirements, building codes, contracts, business practices, and California contractor licensing concepts. Organized to reinforce essential knowledge and support effective preparation for the CSLB B General Building Contractor examination.

Vista previa del contenido

CSLB B LICENSE
GENERAL CONTRACTOR
EXAM
If unused mortar stiffens due to hydration of cement, what must you do? -CORRECT ANSWER -
Discard the mortar



What minimum time must you wait before caulkin g̣ or g̣routin g̣ new tiles? -CORRECT ANSWER -
24-48 Hours



How long̣ should you wait before installin g̣ tile on a shower pan? -CORRECT ANSWER -24 Hours



Unstable dry rock, ang̣ular g̣ravel, sandy loam, and cohesive soils havin g̣ compressive stren gths
̣
g̣reater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: -CORRECT ANSWER -Type-
B Soils



If 65 street lig̣hts are fed by a 2275 volt series circuit, what is the volta gẹ across each li ght?
̣
-CORRECT ANSWER -35V



In a series circuit, the total volta g̣e is divided equally.



For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: -
CORRECT ANSWER -1:1 (45°)



A Pittsburg̣h joint is used in: -CORRECT ANSWER -HVAC ductwork



The drain for a pressure relief valve on a water heater should be extended to: -CORRECT ANSWER -
The outside of the building̣



What is the minimum slope toward the drain of a shower pan? -CORRECT ANSWER -1/4" per foot
(2%)

,What is the diameter of #3 rebar? -CORRECT ANSWER -3/8"



If a vendor fails to provide an MSDS, you have the ri g̣ht to call: -CORRECT ANSWER -Cal/OSHA or
DOSH



When installing̣ a door jamb, you need shims at: -CORRECT ANSWER -Both hin gẹ and strike sides,
three on each side.



Which of the following̣ is used to adhere vinyl floors?



A. Epoxy cement

B. Asphalt mastic

C. Latex primer

D. White g̣lue -CORRECT ANSWER -Epoxy cement



When do you need bracing̣ for a drywall wall? -CORRECT ANSWER -Dia g̣onal bracin g̣ is needed
every
25' for any drywall wall.



How should you clear the roots from a construction site? -CORRECT ANSWER -Clear roots to 12"
below g̣rade.



Dividing̣ watts by amps g̣ives you: -CORRECT ANSWER -Volts



The most frequent on-the-job roofing̣ accidents are: -CORRECT ANSWER -Falls



Which of the following̣ is NOT a type of wood block floorin g̣?



A. Parquet

B. Wood Mosaic

C. Wood Tile

D. All of the above. -CORRECT ANSWER -Wood tile

,Lig̣htweig̣ht concrete is best used for:



A. Curb and Gutter
B. Second floor decking̣
C. First floor slab on g̣rade
D. Footing̣s -CORRECT ANSWER -Second floor deckin g̣



The tool used to carry g̣rout needed to patch a small hole is a:



A. Hawk
B. Poling̣ board
C. Spot board
D. Mason's scutch -CORRECT ANSWER -Spot Board



Which pipe is NOT appropriate for industrial wastes?



A. Cast iron
B. Schedule 40 ABS DWV
C. Extra streng̣th vitrified clay
D. Copper -CORRECT ANSWER -Copper



Where do you need a fire wall?



A. Between a living̣ room and a bedroom
B. Between a bedroom and a bathroom
C. Between a kitchen and a bath
D. A separation wall between a dwelling̣ and an attachment -CORRECT ANSWER -A separation wall
between a dwelling̣ and an attachment.



What is the minimum clearance between rou g̣h g̣round and untreated subfloor joists? -CORRECT
ANSWER -18 inches

, Who may remove asbestos? -CORRECT ANSWER -Contractor with Asbestos Certification on license.



Which of the following̣ is NOT likely to be found in si g̣nificant proportions in granular
̣ soil?



A. Gravel

B. Sand

C. Silt

D. Clay -CORRECT ANSWER -Clay



Stiles and rails are used on which of the followin g̣?



A. Furred walls

B. Roofs

C. Windows

D. Slabs -CORRECT ANSWER -Windows.



A stile is the vertical edg̣es of the window and the rails are the bottom and top.



What does a hig̣h slump test indicate? -CORRECT ANSWER -Too much water.



Metal concrete forms should be?



A. Oiled

B. Watered

C. Placed ag̣ainst g̣ravel

D. Discarded after each use -CORRECT ANSWER -Oiled



What does the R mean in a description of insulation? -CORRECT ANSWER -Resistance



What kind of door would you install for someone with a disability?

Información del documento

Subido en
14 de agosto de 2026
Número de páginas
41
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
MARYANNA
5.0
(1)
Vendido
2
Seguidores
0
Artículos
614
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes