Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 192 páginas
Examen

Electrical Wiring Commercial 18th Edition Solution Manual by Phil Simmons – Complete Answer Guide

Document preview thumbnail
Vista previa 4 fuera de 192 páginas

Comprehensive solution manual covering Electrical Wiring Commercial, 18th Edition by Phil Simmons, with detailed answers and explanations for review questions across major commercial electrical wiring topics. This document includes branch circuits, switches and receptacles, wiring methods, motor and appliance circuits, NEC requirements, conductor sizing, raceways, box calculations, grounding, and electrical load calculations. Ideal for students preparing for coursework, assignments, quizzes, and exams in commercial electrical wiring.

Vista previa del contenido

Solution Manual for Electrical Wiring Commercial, 18th
Edition by Phil Simmons
All Chapters Covered 1-22| Verified Questions & accurate Solutions
for Exam Preparations| A+ GRADED




1|Page

,Solution and Answer Guide

CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS

Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where appropriate,
with answers that are complete sentences.


REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.

1. What section of a commercial building’s specification contains a list of contract
documents?

Answer: A list of the contract documents is contained in General Clauses and
Conditions. A listing of the Commercial Building contract documents is presented in
this chapter under the heading —Commercial Building Plans.‖ The instructor may wish to
have the students check over this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?

Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the
responsibility of the general contractor; in other contracts, it is the electrical contractor’s
responsibility to install and maintain the temporary electrical system. The instructor may
wish to refer the student to NEC Article 590 and discuss the requirements in detail.




2|Page

,3. The electrician uses the Schedule of Working Drawings for what purpose?

Answer: The electrician uses the Schedule of Working Drawings to determine whether
all of the drawings are at hand. The information on —the other sheets‖ may be very
important, especially in coordinating with other contractors.

4. Complete the following items by indicating the letter(s) designating the correct
source(s) of information:


No. Answer Item Information

4. Sections Ceiling height Sections, Sheet A6

5. Electrical Electrical receptacle Electrical symbol schedule, Chapter 2,
symbol style Figure 2–6
schedule

6. Electrical Electrical outlet Electrical layout drawings, Sheets El,
layout location E2, and E3
drawings

7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5

8. Site plan Grading elevations Site plan, Sheet A4

9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4
layout
drawings

10. Architectural Room width Architectural floor plan, Sheets Al, A2,
floor plan and A3

11. Architectural Swing of door Architectural floor plan, Sheets Al, A2,
floor plan and A3

12. Sections View of interior wall Sections, Sheet A6

Match the items on the left with those on the right by writing the letter designation of the
appropriate organization from the list on the right.


13. NEC Electrical Code National Electrical Code (NEC)

14. IAEI Electrical inspectors International Association of Electrical
Inspectors (IAEI)

3|Page

, 15. NFPA Fire codes National Fire Protection Association
(NFPA)

16. IESNA Lighting information Illuminating Engineering Society of
North America (IESNA)

17. UL Listing service Underwriters Laboratories, Inc. (UL)

18. NEMA Manufacturers’ National Electrical Manufacturers
standards Association (NEMA)

19. PE Seal Professional Engineer (PE)


Match the items on the left with those on the right by writing the letter designation of the
proper level of NEC interpretation from the list on the right.

20. with special Allowed by the Code Shall be permitted, or Shall not be
permission required, NEC

21. with special May be done Shall be permitted, or Shall not be
permission required, NEC

22. shall Must be done Shall, National Electrical Code

23. shall Required by the Code Shall, National Electrical Code

24. never Up to the electrician Shall be permitted, or Shall not be
required, NEC

25. Find NEC 250.52(A)(5) and record the first four words.

Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.
Show required conversion calculations for problem 26 and problem 27.

26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is

Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be
discussed later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in
metric terms. This question assumes that the luminaire is exactly 4 ft long.
27. The gross area of the drugstore basement is 1395 square feet. The area in square
meters is
Answer: The area in SI units is 129.7 sq. m; 1395 sq. ft × 0.093 sq. m/sq. ft = 129.7 sq. m.

4|Page

Libro relacionado
 image
Phil Simmons, Ray C. Mullin, Mark Ode Electrical Wiring Commercial
Editorial: 2023 ISBN: 9780357767108 Edición: Desconocido

Información del documento

Subido en
13 de agosto de 2026
Número de páginas
192
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
441
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes