CRRN EXAM REVIEW SOLVED QUESTIONS COMPLETE ANSWERS GRADED A PLUS
Question:
A particular hazard that OSSF installers face that most construction workers do not is _______.?
Answer:
infectious waterborne diseases
Question:
List the equipment and procedures to protect a work site.?
Answer:
signs, regulated speed, cones, barricade, high level flags
Question:
Who can legally install a septic tank followed by a low-pressure dosing drain field at a rental
house??
Answer:
Installer II
Question:
Planning materials for an OSSF utilizing secondary treatment must be prepared by a/an?
Answer:
PE (professional engineer) or RS (registered sanitarian)
Question:
,Penalties for violating the laws, rules, or regulations covering OSSF can be imposed under what
headings?
Answer:
criminal, injunction, administrative
Question:
List the 9 steps of the permitting process?
Answer:
1) Site Evaluations 2) Selection of an OSSF 3) System must be planned 4) Professional designer (PE
or RS) submits planning materials 5) Permit application and planning materials must be prepared
and submitted 6) The application and planning materials are reviewed by permitting authority 7)
Authorization or permit to construct (ATC) must be granted by permitting authority BEFORE
construction can begin 8) Construction begins after ATC recieved. 9) System must be inspected by
permitting agency. 10) Notice of approval (NOA) and permit or license to operate will be issued by
the permitting agency when completed System has passed all inspections.
Question:
New OSSF licenses are issued for a term of ______. An individual must complete _______ of
TCEQ-approved continuing education courses in order to renew license.?
Answer:
3 years, 24 hours
Question:
What is needed to pre-qualify for an exam??
Answer:
submitting an application and notarized experience statements, paying class and application fees,
and successfully completing the appropriate training course
Question:
,Individuals working as a __________ or in any capacity for an OSSF ___________ cannot work as
an Installer, Designer for a fee, or private Site Evaluator within the jurisdiction of the permitting
authority.?
Answer:
Designated representative (DR), permitting authority
Question:
List the OSSF licenses that require previous experience?
Answer:
installer II, Site evaluator (SE), and Maintenance Provider (MP)
Question:
An individual who visits a site and conducts soil evaluations and a site survey is a(n) __________.?
Answer:
site evaulator
Question:
An individual who holds a valid license from the TCEQ and who is compensated by another
individual to construct, install, alter, or repair an OSSF is a(n) _________.?
Answer:
installer
Question:
The _______ is responsible for reviewing permit applications, site evaluations, planning materials,
and conducting inspections of OSSFs?
Answer:
DR (designated representative)
, Question:
_______ adopted the current OSSF Rules in 1997 and revised them several times?
Answer:
TCEQ
Question:
Class II soils include the USDA classes of _________ and __________.?
Answer:
sandy loam, loam
Question:
The _________ is a tool to graphically delineate soil textural classes.?
Answer:
USDA soil textural triangle
Question:
List the two unsuitable types of soil structure or structural condition.?
Answer:
Platy (like a stack of plates) Massive ( can't break it up, huge pieces)
Question:
A soil color pattern of orange and brown on a background of gray or bluish color is called?
Answer:
mottling
Question:
Question:
A particular hazard that OSSF installers face that most construction workers do not is _______.?
Answer:
infectious waterborne diseases
Question:
List the equipment and procedures to protect a work site.?
Answer:
signs, regulated speed, cones, barricade, high level flags
Question:
Who can legally install a septic tank followed by a low-pressure dosing drain field at a rental
house??
Answer:
Installer II
Question:
Planning materials for an OSSF utilizing secondary treatment must be prepared by a/an?
Answer:
PE (professional engineer) or RS (registered sanitarian)
Question:
,Penalties for violating the laws, rules, or regulations covering OSSF can be imposed under what
headings?
Answer:
criminal, injunction, administrative
Question:
List the 9 steps of the permitting process?
Answer:
1) Site Evaluations 2) Selection of an OSSF 3) System must be planned 4) Professional designer (PE
or RS) submits planning materials 5) Permit application and planning materials must be prepared
and submitted 6) The application and planning materials are reviewed by permitting authority 7)
Authorization or permit to construct (ATC) must be granted by permitting authority BEFORE
construction can begin 8) Construction begins after ATC recieved. 9) System must be inspected by
permitting agency. 10) Notice of approval (NOA) and permit or license to operate will be issued by
the permitting agency when completed System has passed all inspections.
Question:
New OSSF licenses are issued for a term of ______. An individual must complete _______ of
TCEQ-approved continuing education courses in order to renew license.?
Answer:
3 years, 24 hours
Question:
What is needed to pre-qualify for an exam??
Answer:
submitting an application and notarized experience statements, paying class and application fees,
and successfully completing the appropriate training course
Question:
,Individuals working as a __________ or in any capacity for an OSSF ___________ cannot work as
an Installer, Designer for a fee, or private Site Evaluator within the jurisdiction of the permitting
authority.?
Answer:
Designated representative (DR), permitting authority
Question:
List the OSSF licenses that require previous experience?
Answer:
installer II, Site evaluator (SE), and Maintenance Provider (MP)
Question:
An individual who visits a site and conducts soil evaluations and a site survey is a(n) __________.?
Answer:
site evaulator
Question:
An individual who holds a valid license from the TCEQ and who is compensated by another
individual to construct, install, alter, or repair an OSSF is a(n) _________.?
Answer:
installer
Question:
The _______ is responsible for reviewing permit applications, site evaluations, planning materials,
and conducting inspections of OSSFs?
Answer:
DR (designated representative)
, Question:
_______ adopted the current OSSF Rules in 1997 and revised them several times?
Answer:
TCEQ
Question:
Class II soils include the USDA classes of _________ and __________.?
Answer:
sandy loam, loam
Question:
The _________ is a tool to graphically delineate soil textural classes.?
Answer:
USDA soil textural triangle
Question:
List the two unsuitable types of soil structure or structural condition.?
Answer:
Platy (like a stack of plates) Massive ( can't break it up, huge pieces)
Question:
A soil color pattern of orange and brown on a background of gray or bluish color is called?
Answer:
mottling
Question: