Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 159 páginas
Examen

BNSF Conductor Final Exam (New Update) Questions & Answers -Grade A- 100- Correct (Verified Solutions)

Document preview thumbnail
Vista previa 4 fuera de 159 páginas

BNSF Conductor Final Exam (New Update) Questions & Answers -Grade A- 100- Correct (Verified Solutions)

Vista previa del contenido

BNSF Conductor Final Exam (New
2026/ 2027 Update) Questions &
Answers {Grade A} 100% Correct
(Verified Solutions)

7.1 Switching Safely and Efficiently 3 - Correct answer Equipment may be left on a:


• Main track, fouling a siding switch, when the switch is lined for the main track.


• Siding, fouling a main track switch, when the switch is lined for the siding.


• Yard switching lead, fouling a yard track switch when the switch is lined for the yard


switching lead.


or


• Industry track beyond the clearance point of the switch leading to the industry.




8.3 Main Track Switches 1 - Correct answer The normal position of a main track switch


is for main track movement, and it must be lined and locked in that position. At points


where double track begins, the normal position of a spring switch is for movement


with the current of traffic.

,8.3 Main Track Switches 2 - Correct answer However, the main track switch may be


left open:


• In CTC territory within track and time limits.


• When attended by a crew member or switch tender.


• During switching operations when it is certain that no other train or engine will pass


over the switch.


• For another train or engine when the switch is attended by a member of that crew.


• Within ABS limits when instructed by the train dispatcher at:


- The entering switch of a siding in Rule 9.14 (Movement with the Current of Traffic)


territory.


- Either switch of a siding in Rule 16.1 (Authority to Enter DTC Limits) territory.


• Within TWC territory when authorized by track warrant. Track warrant protection


must be provided for this condition. The switch must not be considered restored to

normal position until the train dispatcher is notified by an employee or train at that


location.




8.3 Main Track Switches 3 - Correct answer or

,• Within ABS-TWC, ABS-DTC, or Rule 9.14 (Movement with the Current of Traffic)


territory at the entering switch of a siding after the following has been done:


1. Communication has been established between crews of trains meeting or passing.


2. An understanding has been reached that the train on the main track will stop and


restore the switch to the normal position. A crew member must not report clear of the


limits until it is known the switch is lined and locked in the normal position.




8.3 Main Track Switches 4 - Correct answer On main track switches (if equipped), the


target will be red if the switch is lined in other than its normal position.


Before leaving the location where a hand-operated main track switch was operated:


• Crew members must confirm the position of the switch with each other.


• Engineering Department employees granted authority to enter working limits must


confirm the position of the switch with the employee in charge or a designated

employee who will notify the employee in


charge.

, 8.7 Clear of Main Track Switches 1 - Correct answer Except in switching movements,


when a train or engine is approaching or passing on a main track, employees must not


go nearer than 20 feet to any main track switch.




8.7 Clear of Main Track Switches 2 - Correct answer When a train or engine that will


be met or passed is on a siding or other track, the employee attending the switch must


be in a safe location. The employee must not be nearer than 150 feet, if possible, from


the switch when the train is closely approaching and passing.




8.9.1 Testing Spring Switch 1 - Correct answer A crew member tests the switch by


lining the switch over and back by hand and examining the switch points to see that


they fit properly.


Before a train or engine makes a facing point movement over a spring switch, the

switch must be tested when any of the following conditions exist:


1. A block signal governing movement over the switch indicates:


• Stop.


• Stop and Proceed.

or

Información del documento

Subido en
12 de agosto de 2026
Número de páginas
159
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
examvaulthub
2.0
(2)
Vendido
14
Seguidores
0
Artículos
1340
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes