UA FOREMAN TEST 1 AND 2
PROFESSIONAL TRADE QUALIFICATION
TEST PAPER 2026 FULL 110 QUESTIONS
WITH ACCURATE WELL EXPLAINED
ANSWERS EXPERT REVIEWED STUDY
SHEET GRADED A+
⩥ A blueprint is drawn to 1/8" equals 1 foot scale. You measure 5 inches
on your ruler for vertical pipe and 6-3/8" for your horizontal pipe. How
much pipe will you need? Answer: D. 91 feet 0 inches
⩥ A 45 degree offset is one of the most widely use formulas in layout.
What is the formula for figuring this offset. Answer: B 1.414 x (run-rise)
⩥ You and your crew of three journeymen started a job on thursday and
finished the job on the following tuesday. No work on Sunday. The first
the they worked 10 hours. On all other days you worked 8 hours. What
is the total number of hours paid? Answer: D. 188 hours
⩥ Assume you are working with a 40 foot run of pipe with 1/8" of pitch
per foot. What is the overall amount of pitch over the course of the run?
Answer: A. 5 inches
, ⩥ If a straight run travels through 5 rooms and each room is 80 feet
long, how many feet of pipe would be needed to span the distance?
Answer: C. 400 feet
⩥ A blueprint is written with a scale of 1/4" equals 1 foot. A room scales
out to 15-1/4". How many feet would the room be? Answer: D. 61 feet
⩥ What size sleeve is needed for a 6" sch. 10 pipe with 2" of insulation?
Answer: D. 12 inches
⩥ A pipe has a 9 foot above finished floor center line elevation and a
benchmark that is 2 feet above finished floor. What is the center line of
the pipe above benchmark? Answer: B. 7 feet.
⩥ What standard is applied with the respect to the abuse of substances
on the job site? Answer: D. Zero tolerance policy has been established
by the UA and it applied to all locals.
⩥ According to the United Associations Standard for Excellence, how
should an employer handle an infective employee? Answer: D. Return
them to the union hall with an explanation of why they are being
discharged.
PROFESSIONAL TRADE QUALIFICATION
TEST PAPER 2026 FULL 110 QUESTIONS
WITH ACCURATE WELL EXPLAINED
ANSWERS EXPERT REVIEWED STUDY
SHEET GRADED A+
⩥ A blueprint is drawn to 1/8" equals 1 foot scale. You measure 5 inches
on your ruler for vertical pipe and 6-3/8" for your horizontal pipe. How
much pipe will you need? Answer: D. 91 feet 0 inches
⩥ A 45 degree offset is one of the most widely use formulas in layout.
What is the formula for figuring this offset. Answer: B 1.414 x (run-rise)
⩥ You and your crew of three journeymen started a job on thursday and
finished the job on the following tuesday. No work on Sunday. The first
the they worked 10 hours. On all other days you worked 8 hours. What
is the total number of hours paid? Answer: D. 188 hours
⩥ Assume you are working with a 40 foot run of pipe with 1/8" of pitch
per foot. What is the overall amount of pitch over the course of the run?
Answer: A. 5 inches
, ⩥ If a straight run travels through 5 rooms and each room is 80 feet
long, how many feet of pipe would be needed to span the distance?
Answer: C. 400 feet
⩥ A blueprint is written with a scale of 1/4" equals 1 foot. A room scales
out to 15-1/4". How many feet would the room be? Answer: D. 61 feet
⩥ What size sleeve is needed for a 6" sch. 10 pipe with 2" of insulation?
Answer: D. 12 inches
⩥ A pipe has a 9 foot above finished floor center line elevation and a
benchmark that is 2 feet above finished floor. What is the center line of
the pipe above benchmark? Answer: B. 7 feet.
⩥ What standard is applied with the respect to the abuse of substances
on the job site? Answer: D. Zero tolerance policy has been established
by the UA and it applied to all locals.
⩥ According to the United Associations Standard for Excellence, how
should an employer handle an infective employee? Answer: D. Return
them to the union hall with an explanation of why they are being
discharged.