Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

C172 ASTM Questions with 100% Verified Correct Answers

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

C172 ASTM Questions with 100% Verified Correct Answers

Vista previa del contenido

C172 ASTM Questions with 100% Verified
Correct Answers
What is ASTM C 172

Is the standard of obtaining & preparing concrete samples to be tested.

What is a composite sample?

Two or one portions combined in one sample & represents the entire batch

Where should concrete be sample?

From middle portion of the batch

When should testing begin?

Within Required ASTM time limit

What is the order procedure of ASTM C172?

Wait → Middle → Two → Collect → Composite → 15 → 1 → 5 → 15 → Protect."

Name the five equipment sources from which concrete samples may be obtained.

* Stationary mixers

* Paving mixers

* Revolving drum mixers

* Continuous mixers

* Open-top containers

What is the purpose of proper sampling?

To obtain a representative sample of the concrete for testing.

What if additional water or admixtures are added after the sample is taken?

, Discard the sample and obtain a new sample after the additions have been mixed into the

concrete.

Why must a sample be discarded if water or admixtures are added afterward?

The sample no longer represents the actual concrete being delivered.

What must occur before concrete can be sampled?

Ensure all water and admixtures have been added and mixed into the concrete.

What type of container is preferred for collecting and combining concrete samples

A wheelbarrow is the preferred container for sampling and mixing concrete samples.

What can be used if a wheelbarrow is not available?

Multiple 5-gallon buckets or feed buckets may be used.

Why is a concrete tub useful at the testing location?

It provides a place to combine and remix the sample before testing.

Where in the discharge should a concrete sample be taken from a truck mixer?

From the middle portion of the load, after the first 10% and before the last 10% of discharge.

How is concrete sampled behind a paver or paving mixer?

Allow concrete to discharge onto the ground and obtain portions from at least 5 different

locations representing the entire batch.

What is the minimum sample size when strength specimens are required?

At least 1 cubic foot (1 ft³) of concrete.

When determining sample size, what should be considered?

Información del documento

Subido en
8 de agosto de 2026
Número de páginas
5
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KenAli
2.6
(18)
Vendido
114
Seguidores
5
Artículos
23785
Última venta
22 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes