WGU E028 Task 1 Hybrid Cloud Strategic Plan | Nutanix NC2 & Microsoft Azure Architecture, Migration, Security, Governance & KPIs | 2026 Update Complete.

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

WGU E028 Task 1 Hybrid Cloud Strategic Plan | Nutanix NC2 & Microsoft Azure Architecture, Migration, Security, Governance & KPIs | 2026 Update Complete.

Vista previa del contenido

HYBRID CLOUD
STRATEGIC PLAN

A secure, governed, and measurable modernization roadmap




Prepared for
NorthStar Services, Inc. [Replace with official scenario company]



Prepared by
[Your Name] | External IT/Cloud Consultant



Course
Hybrid Cloud Infrastructure and Orchestration - E028



Date
August 6, 2026




This model is based on the information supplied in the request, not the complete
SUBMISSION
WGU scenario or rubric. Replace every bracketed item and validate all assumptions
NOTE
before submission. Original analysis and personalization are required.

,WGU E028 | Hybrid Cloud Strategic Plan




Document Control and Planning Basis
Purpose. This strategic plan recommends a controlled transition from a capacity-constrained, legacy
on-premises data center to a Nutanix Cloud Clusters (NC2) hybrid architecture integrated with Microsoft
Azure. It connects business outcomes to architecture, sequencing, governance, performance measures, and
decision gates.

Scope boundary. The plan defines strategy and target-state direction. It does not constitute a final bill of
materials, low-level design, production change record, regulatory opinion, or vendor contract. Those artifacts
follow discovery and architecture validation.

Planning assumptions
ID Assumption used in this model Required validation

A1 NorthStar operates one primary on-premises data center with aging Replace with exact asset inventory, hypervisor,
x86 servers, shared storage, and a virtualized application estate. age, utilization, warranties, and sites.

A2 Demand is variable and existing capacity procurement is too slow Insert scenario growth forecasts, utilization
for business growth. ceilings, and procurement lead time.

A3 Regulated or sensitive records require data-location, privacy, Name the exact laws, contracts, classifications,
retention, and access controls. and approved Azure regions.

A4 Existing workloads can run on Nutanix AHV or can be migrated after Confirm OS, application, database, license, and
compatibility testing. vendor support matrices.

A5 A 12-month program is feasible, with executive sponsorship and a Replace with the rubric timeline, budget, staffing,
cross-functional cloud adoption team. and dependencies.

A6 Targets below are proposed baselines and require approval after Recalculate KPI baselines using finance,
discovery. operations, and monitoring data.



Decision statement
Approve a discovery-and-pilot program for NC2 on Azure, governed through Azure Arc and Microsoft Entra ID,
with production expansion allowed only after security, resilience, cost, performance, and rollback criteria are
met.




NorthStar Services, Inc. | Planning assumptions require validation against the official scenario Page 2

, WGU E028 | Hybrid Cloud Strategic Plan




Executive Summary
NorthStar's legacy data center has become a constraint on growth. Capacity is purchased in large
increments, infrastructure refreshes consume capital, recovery depends on a limited physical footprint, and
fragmented administration makes consistent security and evidence collection difficult. Maintaining the status
quo increases the probability that demand will exceed capacity, aging equipment will fail, or recovery
objectives will not be met.

The recommended strategy is a deliberately hybrid operating model. Systems whose latency, data-residency,
dependency, or business requirements favor local execution remain in the private cloud. Elastic,
customer-facing, development/test, analytics, backup, and disaster-recovery workloads use Microsoft Azure.
NC2 on Azure supplies a consistent Nutanix infrastructure layer in both locations, reducing the amount of
replatforming required for initial migrations. Azure Arc provides a unified resource representation for eligible
non-Azure servers so policy, inventory, monitoring, and security controls can be applied centrally (Microsoft,
2026a; Nutanix, n.d.-a).

The plan is organized around four strategic pillars: secure-by-design governance; resilient and scalable
service delivery; financially accountable consumption; and workforce/operating-model readiness. Migration
occurs in five gated phases: discovery, foundation and pilot, noncritical workloads, production waves, and
validation/optimization. Each phase has entry criteria, technical actions, acceptance evidence, ownership,
and rollback provisions.

Within 12 months, the proposed outcomes are: migrate at least 60% of eligible development/test and low-risk
workloads; reduce avoidable infrastructure capital expenditure by 30% against the approved baseline;
sustain at least 99.95% availability for tier-1 services after stabilization; achieve recovery point and recovery
time objectives through tested failover; attain at least 95% policy compliance; and ensure 100% of in-scope
resources are tagged, inventoried, monitored, and assigned to accountable owners. These targets are
approved only after baseline validation.

The recommended immediate decision is to fund Phase 1 and Phase 2, appoint an executive sponsor and
cloud governance board, and authorize a limited pilot. Production migration remains contingent on signed
acceptance of architecture, security, performance, cost, and recoverability evidence.

Business outcomes and enabling capabilities
Business outcome Enabling capability Success evidence

Scale without long hardware lead Azure capacity plus NC2 workload mobility Approved scale test; time-to-provision
times reduced to <=4 hours

Protect sensitive data and Classification, Entra ID, RBAC, Policy, >=95% policy compliance; no critical
demonstrate control encryption, logging unresolved findings

Improve continuity Second-site cloud capacity, replication, Tier-1 failover test meets approved
immutable backup, runbooks RTO/RPO

Shift spending toward accountable Tagging, budgets, showback, reservations Unit-cost dashboard; variance <=10%
consumption after stabilization after month 3

Reduce operational fragmentation Nutanix Prism plus Azure Arc/Azure Monitor 100% in-scope inventory and telemetry
coverage




NorthStar Services, Inc. | Planning assumptions require validation against the official scenario Page 3

Información del documento

Subido en
6 de agosto de 2026
Número de páginas
16
Escrito en
2026/2027
Tipo
Otro
Personaje
Desconocido
$17.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Wiseman
3.9
(1649)
Vendido
8245
Seguidores
3899
Artículos
30698
Última venta
7 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes