• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Otro

Mgt 301-Final Exam Accurate Study Guide

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

MGT 301-FINAL EXAM ACCURATE STUDY GUIDE

Vista previa del contenido

MGT 301-FINAL EXAM ACCURATE STUDY GUIDE


Forecasting - Answers - Provides an estimate of future demand
*GOAL*: minimize forecast error and match supply and demand

Goals of forecasting - Answers - Identify factors that influence demand
Improved forecasts benefits all trading partners with: lower inventories, reduced stock
outs, smoother production plans, reduced costs, improved customer service

Deciding what to forecast - Answers - Level of aggregation
Units of measure

Choosing the type of forecasting technique - Answers - Qualitative (judgment methods)
Time-series analysis
Trend projecting using regression
Multiplicative seasonal method
Causual methods

Time-Series Analysis - Answers - Trend variations: either increasing or decreasing
Cyclical variations: wavelike movements that are longer than a year
Seasonal variations: show peaks and valleys that repeat over a consistent interval such
as hours, days, weeks, months, or seasons
Irregular variations: Outliers
Random variations: due to unexpected or unpredictable events

Qualitative methods - Answers - Used when data are limited, unavailable, or not
currently relevant. this forecast depends on skill of forecaster and available information
Four models: Jury of executive opinion, delphi method, sales force composite,
consumer survey

Quantitative Methods - Answers - Time series forecasting: historical data is used to
predict future demand, assumes that the future is an extension of the past
Trend projection (using regression analysis)
Associative forecasting (cause and effect)-->regression analysis, one or more factors
predict future demand

Naive Forecasting Model - Answers - Last period's actual demand is used as this
period's forecast
F(t+1)-At
F5=A4
If Actual 4=8000, forecast 5=8000

Simple moving average forecasting model - Answers - uses historical data to generate a
forecast; works well when demand is fairly stable

, Period of moving average will be given
F5=(A1+A2+A3+A4)/n
F5= (1600+2200+2000+1600)/4
F5=1850
F9=(A5+A6+A7+A8)/n

Weighted Moving Average forecasting model - Answers - Based on an n-period
weighted moving average
Weight Assignments will be given
F5=A1Weight1+A2W2+A3W3+A4W4
F5= .1(1600)+.2(2200)+.3(2000)+.4(1600)=1840F9= A5W5-->A8W8

Exponential smoothing forecasting model - Answers - a weighted moving average in
which the forecast for the next period's demand is the current period's forecast adjusted
by a fraction of the difference wetween the current period's actual demand and its
forecast. *Only two data points are needed.*
Smoothing factor (a) is given: could be .3
F3=F2+a(A2-F2)

Collaborative planning, forecasting and replenishment (CPFR) - Answers - A nine-step
process for SC integration that allows a supplier and customers to collaborate on
forecasting by using the internet
Combines intelligence of multiple trading partners in planning & fulfillment of customer
demands

Benefits of CPFR - Answers - Real value from sharing forecasts among firms rather
than algorithms from single
Eliminates inventory shifting among partners
Provides SC with abundant benefits but requires fundamental change in buyer & seller
collaboration

Theory of Constraints

Capacity - Answers - The rate of output from an operations management system
A variable in the long term
A constraint in the short term
Must be managed because it is a major determinant of cost and customer service
*Maximum average rate of output of a process or system*

Constraint - Answers - any factor that limits process or system performance and
restricts its output

Bottleneck - Answers - constrained resource where demand on it exceeds capacity.
Typically the bottleneck will determine the system capacity (characterized by long lines
or lots of inventory ahead of bottleneck)

Información del documento

Subido en
1 de agosto de 2026
Número de páginas
5
Escrito en
2026/2027
Tipo
Otro
Personaje
Desconocido
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUEENSEXAMS
4.1
(61)
Vendido
230
Seguidores
180
Artículos
4957
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes