1. A hydroelectric plant operator notices a gradual decrease in power
output while water flow rates remain constant. What is the most likely
cause?
A) Reduced reservoir water temperature
B) Turbine blade erosion or reduced head
C) Generator overspeed due to grid frequency increase
D) Increased tailrace water temperature
Answer: B
Explanation: Power output is directly proportional to the product of
head and flow. If flow is constant, a decrease in output indicates a
reduction in effective head or a loss in turbine efficiency. Turbine blade
erosion, often caused by cavitation or debris, reduces the blade's ability
to extract energy from the water, leading to lower mechanical power
conversion. Similarly, a drop in the forebay elevation reduces the head
pressure available to drive the turbines.
2. What is the primary function of a penstock in a hydroelectric power
plant?
,2|Page
A) Store water for peak demand
B) Convert mechanical energy to electrical energy
C) Channel water to the turbine under pressure
D) Measure water flow velocity
Answer: C
Explanation: The penstock is a large-diameter pipe or conduit that
conveys water from the forebay or reservoir to the turbine. Its design
allows it to withstand high internal pressures, directing the water flow
efficiently to the turbine's runner or nozzle to generate mechanical
power.
3. Which type of turbine is most suitable for a high-head, low-flow
application?
A) Kaplan turbine
B) Francis turbine
C) Pelton wheel
D) Propeller turbine
Answer: C
Explanation: Pelton wheels are impulse turbines that operate by
directing a high-velocity jet of water onto a series of buckets or cups
mounted on a runner. This design is highly efficient for sites with high
head (often over 300 meters) and relatively low flow rates, making
them a standard choice for such conditions.
,3|Page
4. A generator loses synchronism with the power grid. What is the
immediate operational concern?
A) Reduced water flow
B) Frequency instability and potential equipment damage
C) Increased reservoir level
D) Decreased transformer efficiency
Answer: B
Explanation: Synchronism requires the generator's frequency, voltage,
phase angle, and phase sequence to match the grid's parameters. If a
generator falls out of sync, it can cause severe mechanical stress on the
turbine-generator shaft, damage to the generator itself, and create
frequency and voltage instability that could affect the entire
interconnected grid.
5. What is the purpose of the governor in a hydroelectric turbine?
A) Adjusts field current to control voltage
B) Regulates water flow through wicket gates to control turbine
speed
C) Monitors transformer oil levels
D) Controls the spillway gates
Answer: B
, 4|Page
Explanation: The primary function of a turbine governor is to
maintain a constant rotational speed (RPM) by adjusting the flow of
water entering the turbine. It does this by modulating the position of
wicket gates (in reaction turbines like Francis and Kaplan) or needle
valves (in impulse turbines like Pelton). This ensures the generator
produces electricity at the required frequency (e.g., 60 Hz in North
America) as electrical load changes.
6. What is cavitation in a turbine system?
A) Loss of generator field excitation
B) Formation and collapse of vapor bubbles in liquid
C) Overheating of stator windings
D) Blockage of the penstock by debris
Answer: B
Explanation: Cavitation is a hydraulic phenomenon that occurs when
the local pressure in a liquid drops below its vapor pressure. This causes
the formation of vapor-filled bubbles or cavities. As the fluid moves to
an area of higher pressure, these bubbles collapse violently, creating
shock waves that can cause pitting and erosion on nearby metal
surfaces, particularly turbine blades, leading to decreased efficiency and
eventual mechanical failure.
7. Which component converts mechanical energy from the turbine into
electrical energy?
A) Exciter