Activity A task or process to be accomplished in a set period
of time as part of working toward a larger project
goal. An *** can be assigned to a resource(s) and
have an associated cost. *** are ordered with logic
links.
Actual Cost The real amount paid of incurred for labor or
materials.
https://quizlet.com/1196355932/cosc-475-final-exam-frequently-most-tested-questions-and-verified-solutions-2026-2027-actual-exam-questions-with-… 1/11
, 7/25/26, 9:28 AM COSC 475 FINAL EXAM| FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS @ 2026 || 2027 (Actual Exa…
Bar Chart A chart on which activities are represented by Bars.
The Bars length is represented by the activity
Duration, and is lined-up on a X-axis time scale.
Base Line A set of dates and costs frozen at the start of the
project and used as a basis for performance
evaluation as the project progresses.
Budgeted Cost The amount planned ahead and placed aside to
execute an activity or an entire project from start to
finish.
Cost Breakdown Structure (CBS) A breakdown of the project into cost elements for
cost control planning. A **** will deconstruct a project
into various cost elements or types such as area,
phase, discipline, or materials.
Critical Activity An activity that is on the project's critical path.
Critical Path The sequence of network activities which add up to
the longest overall duration. This determines the
shortest time possible to complete the project.
https://quizlet.com/1196355932/cosc-475-final-exam-frequently-most-tested-questions-and-verified-solutions-2026-2027-actual-exam-questions-with-… 2/11
COSC 475 FINAL EXAM| FREQUENTLY MOST
TESTED QUESTIONS AND VERIFIED SOLUTIONS @
2026 || 2027 (Actual Exam) Questions with verified
Answers
Add to calendar
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (73)
Activity A task or process to be accomplished in a set period
of time as part of working toward a larger project
goal. An *** can be assigned to a resource(s) and
have an associated cost. *** are ordered with logic
links.
Actual Cost The real amount paid of incurred for labor or
materials.
https://quizlet.com/1196355932/cosc-475-final-exam-frequently-most-tested-questions-and-verified-solutions-2026-2027-actual-exam-questions-with-… 1/11
, 7/25/26, 9:28 AM COSC 475 FINAL EXAM| FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOLUTIONS @ 2026 || 2027 (Actual Exa…
Bar Chart A chart on which activities are represented by Bars.
The Bars length is represented by the activity
Duration, and is lined-up on a X-axis time scale.
Base Line A set of dates and costs frozen at the start of the
project and used as a basis for performance
evaluation as the project progresses.
Budgeted Cost The amount planned ahead and placed aside to
execute an activity or an entire project from start to
finish.
Cost Breakdown Structure (CBS) A breakdown of the project into cost elements for
cost control planning. A **** will deconstruct a project
into various cost elements or types such as area,
phase, discipline, or materials.
Critical Activity An activity that is on the project's critical path.
Critical Path The sequence of network activities which add up to
the longest overall duration. This determines the
shortest time possible to complete the project.