Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 161 páginas
Examen

ICC CALIFORNIA UST INSPECTOR REAL EXAM TEST QUESTIONS WITH CORRECT ANSWERS 2025/2026 LATEST BEST QUALITY GRADED EXAM

Document preview thumbnail
Vista previa 4 fuera de 161 páginas

This study material contains practice questions and verified answers designed to help candidates prepare for the ICC California Underground Storage Tank (UST) Inspector certification exam. It covers essential topics including UST system components, California Title 23 regulations, leak detection, spill and overfill prevention, secondary containment, inspection procedures, environmental compliance, and reporting requirements. The content is organized in an exam-style format for efficient revision and reflects the structure and knowledge areas outlined for the ICC UST Inspector (UI) certification.

Vista previa del contenido

1



ICC CALIFORNIA UST INSPECTOR REAL
EXAM TEST QUESTIONS WITH CORRECT
ANSWERS 2025/2026 LATEST BEST
QUALITY GRADED EXAM

Which of the following would not require secondary containment testing?

a.) Interstitial space hydrostatically monitored

b.) Under-dispenser containment

c.) Turbine piping sump

d.) Secondary piping -- ANSWER--a.) Interstitial space hydrostatically monitored

CCR Title 23, Sec 2637(g)



Fiberglass tanks shall be repaired by the following, except:

a.) Small fractures and fissures may be repaired with epoxy

b.) Fiberglass cloth with a minimum dimension 12 x 12 inches centered over the area to be
repaired.

c.) A second layer of fiberglass cloth shall be installed directly over the primary cloth layer
and shall be cut to overlap the primary patch by 5 inches on all sides.

d.) The repaired tank shall be tested for tightness within 30 calendar days following the date
of the completion of the repair. -- ANSWER--c.) A second layer of fiberglass cloth shall be
installed directly over the primary cloth layer and shall be cut to overlap the primary patch by
5 inches on all sides.

CCR Title 23, Sec 2661(d)(4)

, 2


Automatic line leak detectors shall be installed on underground pressurized piping and shall
be capable of detecting a 3-gallon per hour leak rate at 10 psi within 1 hour with a probability
of detection of at least % and a probability of false alarm no greater than %.

a.) 95, 5

b.) 98, 2

c.) 5, 95

d.) 2, 98 -- ANSWER--a.) 95, 5

CCR Title 23, Sec 2636(f)(2) & 2643(c)(1)



An emergency impact valve (shear valve) is found in the following location on an UST
System.

a.) At the turbine piping termination

b.) Base of the dispenser

c.) Under the extractor tee

d.) Spill container -- ANSWER--b.) Base of the dispenser



Notification to perform a secondary containment test must be given to the local agency by:

a.) A service technician or a licensed tank tester.

b.) Cathodic protection tester.

c.) Owner/operator of UST.

d.) State Water Resources Control Board. -- ANSWER--c.) Owner/operator of UST

CCR Title 23, Sec 2637(f)



An owner or operator of an underground storage tank or any part thereof that is destined for a
specific reuse shall advise the local agency, within the time frame specified by that agency, of
all of the following, except:

, 3


a.) The nature of intended use

b.) The name of the new owner and new operator of the UST

c.) The location of intended use

d.) The State Water Resources Control Board must be advised not the local agency --
ANSWER--d.) The State Water Resources Control Board must be advised not the local
agency

CCR Title 23, Sec 2672(b)(4)



Any person(s) installing underground storage tank systems or components shall be certified
or licensed by:

a.) The Contractors State License Board

b.) The local agency

c.) The State Water Resources Control Board

d.) The Regional Water Quality Board -- ANSWER--a.) The Contractors State License Board

CCR Title 23, Sec 2715(g)



The designated UST operator(s) shall perform monthly visual inspections of all UST's for
which they are designated. The monthly visual inspection shall include all of the following,
except:

a.) Inspecting for the presence of hazardous substances, water, or debris in spill containers.

b.) By July 1, 2005, verify that all facility employees have been trained.

c.) Reviewing the alarm history report or log for the previous month.

d.) Inspecting for the presence of hazardous substances, water, or debris in containment
sumps regardless of documentation showing each alarm for the previous month has been
responded to appropriately. -- ANSWER--d.) Inspecting for the presence of hazardous
substances, water, or debris in containment sumps regardless of documentation showing each
alarm for the previous month has been responded to appropriately.

, 4


CCR Title 23, Sec 2715(c)



Which agency approves a site-specific variance which allows for an alternative method of
construction or monitoring:

a.) The Regional Water Quality Board

b.) The State Water Resources Control Board

c.) The Department of Toxic Substance Control

d.) The local agency -- ANSWER--a.) The Regional Water Quality Board

CCR Title 23, Sec 2681(a)



The regulations to enforce compliance of underground storage tank systems in the state are
found in?

a.) Code of Federal Regulations, 40 CFR Part 281

b.) California Code of Regulations, Title 23, Chapter 16

c.) Code of Federal Regulations, 40 CFR Part 280

d.) California Code of Regulations, Title 23, Chapter 17 -- ANSWER--b.) California Code of
Regulations; Title 23, Chapter 16



By definition an "underground storage tank system" includes

a.) The tank, all connected piping and dispensers

b.) The tank, all connected piping, ancillary equipment and containment system

c.) Only the tank

d.) Only tanks totally beneath the surface of the ground -- ANSWER--b.) The tank, all
connected piping, ancillary equipment and containment system

Información del documento

Subido en
24 de julio de 2026
Número de páginas
161
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Nursescholars
1.5
(2)
Vendido
8
Seguidores
0
Artículos
530
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes