What is the purpose of a life cycle?

Systematic and organised way to undertake project based work

What are the 3 major life cycles?

Linear, Iterative, Hybrid

What are the features of a Linear project approach?

- Sequential with clearly defined outputs

- Stable

- Low-risk

- Greater structure

- Expectations of each phase known

What are the benefits of a Linear Project Life Cycle?

- Clear framework for team to follow

- Early definition requirements

- Maximum control and governance

- Control and information passed on to the next phase at predefined milestones (Decision

gates)

Strengths of a Linear Life Cycle?

- Suitable for Low-risk taking projects

- Provides Clear framework to follow

What are the phases of a Linear Life Cycle?

,Concept, Definition, Deployment, Transiiton

What is the Concept Phase of a project?

The concept phase is the stage where project goals, feasibility and initial ideas are defined

and evaluated

What is the Definition phase of the project?

Involves refining project requirements, objectives and scope to create a clear Project

Management Plan

What are the features of an Iterative Life Cycle?

Repeats one or more phases



Project Scope might be vague or solutions unclear requiring more flexibility in governance

procedures.

What are the benefits of the Iterative Life Cycle?

- Beneficial for evolving objectives or solutions

- Project manager and team can observe the benefits the staged functionality delivers and

adjust for the next iteration

What are the strengths of an Iterative Life Cycle?

- Beneficial when scope is unclear

- Suitable for evolving objectives or solutions

- Allows iterative feedback and accommodates change more easily

What are the weaknesses of an iterative life cycle?

,- Lack of certainty in terms of overall DURATION and COST

- Can lead to complexities in the management of resources

What are the parts of an Iterative Life Cycle?

Pre-Project



Feasibility

Foundations



Evolutionary Development (Product Owner)



Assemble Review Deploy



Deployment



Post Project

What is a Hybrid Life Cycle?

Add iteration to a linear life cycle enabling mixed approaches

What is a weakness of the Hybrid Life Cycle?

It requires great skill and clarity to be successful when using the multiple systems of work

Why are projects structured in phases in a linear life cycle?

- Clear identification of priorities and appropriate focus of current work

- Achieves understanding of requirements through adequate time developing the initial idea

and plan

, - Delivers more stakeholder communication, regular project review including frequent

consultation and transparency

- Achieves transparency though assessment of achievements at the end of each phase.

- Allows maximum control and governance of the project.

What are the additional phases in an Extended Project Life Cycle?

Adoption and Benefit Realisation

What is the Adoption phase of an extended life cycle?

It is when the end-users begin actively using the project deliverables, integrating them into

regular operations and providing feedback

What is the Benefit Realisation phase of an Extended Life Cycle?

It is when the project outcomes are MEASURED to confirm they deliver the expected value,

aligning with the project goals and justifying the investment.

What is an Extended Life Cycle?

- Goes beyond transition phase.

- Suitable when the project is expected to incorporate management of change and benefit

realisation.

- Suitable for project funded within the organisation.

- Project team supports the bedding in of the project.

- The team can determine the immediate benefits realised as the project goes operational and

feedback.

- Prevents knowledge boundaries post transition phase.

Why would an organisation favour a linear life cycle?

Información del documento

Subido en
21 de julio de 2026
Número de páginas
36
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KenAli
2.6
(18)
Vendido
103
Seguidores
5
Artículos
21939
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes