Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 39 páginas
Examen

APM PMQ Exam 1 Questions with Correct Answers

Document preview thumbnail
Vista previa 4 fuera de 39 páginas

APM PMQ Exam 1 Questions with Correct Answers

Vista previa del contenido

APM PMQ Exam 1 Questions with Correct
Answers
What are the stages of a linear life cycle?

Concept, Definition, Deployment, Transition

What is the best type of life cycle to use for a stable low-risk project?

Linear life cycle

State the three types of life cycle.

Linear, Iterative, Hybrid

What is the main characteristic of an iterative life cycle?

It repeats one of more phases

When is an iterative life cycle beneficial?

If the project scope is vague, or if the solutions are unclear

What are the three stages of Evolutionary Development in an Iterative lifecycle?

Assemble, Review, Deploy

What is the definition of a hybrid life cycle?

It adds iteration to a linear life cycle to enable a mix of approaches

Give one difference between a Project Life Cycle and an Extended Life Cycle?

A project life cycle contains the phases up to transition and closure, whereas an extended life

cycle goes beyond the transition and closure phase to include the benefits realisation phase

and adoption of outputs.

,What are the two extra phases of an Extended life cycle?

Adoption, Benefits Realisation

What are the different Documentation Requirements for a Project lifecycle vs. an

Extended lifecycle?

A project lifecycle focuses on documentation required for project execution and closure, such

as project plans, progress reports, and final reviews.

An extended lifecycle requires comprehensive documentation that extends into operational

manuals, long-term maintenance schedules, and end user support materials.

How are Changes Managed for a Project lifecycle vs. an Extended lifecycle?

Project Lifecycle - Changes are managed within the confines of the project's timeline and aim

to minimise disruptions to the initial plan.

Extended lifecycle - Incorporates continuous change management to adapt to evolving

technologies, user requirements, and operational challenges over time.

How is Quality Assurance carried out in Project lifecycle vs. Extended Lifecycle?

Project lifecycle - Quality assurance processes are designed to ensure that the project meets

defined standards and specifications at closure.

Extended lifecycle - Ongoing quality assurance is crucial to maintain the integrity,

performance, and safety of the project outcomes throughout their lifecycle.

How are Resources Allocated in a Project lifecycle vs. an Extended lifecycle?

Project lifecycle - Resources are allocated and managed with the goal of project completion,

and resource engagement typically concludes with the project

Extended lifecycle - Resource allocation is dynamic and may increase or decrease based on

the phase of the lifecycle, such as during major upgrades or routine maintenance.

,How do skills and expertise differ across a Project lifecycle vs. an Extended Lifecycle?

Project lifecycle - Requires skills relevant to project management and technical execution

specific to the project's requirements.

Extended lifecycle - Demands a broader range of skills, including operational management,

technical support, and lifecycle management expertise.

How do Feedback Mechanisms differ in a Project Lifecycle vs an Extended Lifecycle?

Project lifecycle - Feedback is often project-focused and gathered during the project to refine

processes and outputs.

Extended lifecycle - Continuous feedback loops are essential for adapting to user

experiences, technological advancements, and market changes

How do Sustainability Considerations differ in a Project Lifecycle vs an Extended

Lifecycle?

Project lifecycle - Sustainability may be considered in terms of project deliverables and

immediate environmental impacts.

Extended lifecycle - Includes long-term sustainability planning, focusing on environmental

impact, resource use, and economic viability over the entire lifecycle.

How is Legal and Compliance handled in a Project lifecycle vs. Extended lifecycle?

Project lifecycle - Compliance is targeted at meeting the legal requirements up to the project's

delivery

Extended lifecycle - Extends compliance to include regulatory requirements that affect the

ongoing use, updates, and eventual decommissioning of the project deliverables

Why might an organisation favour a linear project lifecycle? (5 reasons)

, Where a highly structured, predictable and stable process is needed which offers transparency

and maximum control and governance.

Where there is availability of relatively perfect knowledge upfront.

Which might be resistant to change and inflexible in terms of corrections and rework.

Where knowledge / teams are divided into distinct phases, creating silos and knowledge

barriers between the phases, particularly when different delivery agents will deliver different

phases.

Lower appetite for risk

Why might an organisation favour an iterative lifecycle? (5)

Where development projects are agile.

Where departments are flexible, adaptable and open to change.

They favour the idea of concurrency, or simultaneous engineering, where different

development steps are allowed to be performed in parallel.

They can manage uncertainty regarding the scope by allowing the objectives to evolve

throughout the life cycle as learning and discovery take place.

Prototypes, timeboxes or parallel activities are utilised to acquire new insights, obtain

feedback or explore high-risk options.

What Organisational Context and Culture would define the influence on life cycle

choice for an organisation? (3)

Risk Tolerance, Decision making style, Change Readiness

What Project-Specific Needs would define the influence on life cycle choice for an

organisation? (3)

Project complexity, Requirement stability, Stakeholder engagement, Resource Availability

Información del documento

Subido en
21 de julio de 2026
Número de páginas
39
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KenAli
2.6
(18)
Vendido
103
Seguidores
5
Artículos
21939
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes