Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 28 páginas
Examen

New Mexico General Building Contractor License (GB-98): Study Guide & Practice Exam with Verified Q&A |

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

This comprehensive study guide and practice exam is designed for construction professionals preparing for the New Mexico General Building Contractor (GB-98) Exam. This license, issued by the New Mexico Regulation & Licensing Department (RLD) through the Construction Industries Division (CID), is the highest tier of general building licensure in the state and authorizes contractors to bid and contract for residential and commercial buildings, structures, and projects . The GB-98 license requires candidates to have four years of foreman-level experience, including at least two years of commercial experience . Candidates must pass the GB-98 trade exam and the Business and Law Exam, administered by PSI . The New Mexico GB-98 exam consists of 100 questions with a 310-minute time limit, and a score of 75% is required to pass. The exam is open-book, allowing candidates to bring and use approved reference materials . The Business and Law exam has 50 questions with a 130-minute time limit and a required score of 75% . The GB-98 exam covers a broad range of construction-related topics , including: Key Topics Covered: Project Management and Administration: Contract documents, change orders, shop drawings, scheduling, quality control, safety (OSHA compliance, scaffold/ladder safety, trenching [5ft or deeper requires protective systems]), record-keeping, and project closeout (punch lists, substantial completion) . Construction Law and Compliance: Licensing requirements (NMSA §60-13), business and law regulations, lien rights (mechanic's liens must be filed within 45 days), prevailing wage requirements, and contract enforcement (written change orders are essential for enforceability) . Financial Responsibility and Estimating: Quantity takeoffs, construction budgeting, and the importance of maintaining a $10,000 surety bond . Building Codes and Construction Methods: Compliance with the 2015 International Building Code (IBC) for commercial construction, New Mexico building codes, and the International Residential Code (IRC), as well as best practices for concrete, masonry, framing, and site work . Licensing Requirements: The GB-98 license requires four years of experience and the submission of a completed application, proof of financial responsibility (a $10,000 surety bond), a tax registration number, and proof of insurance, including workers' compensation, to PSI . Sample Questions (from the exam): What is the main building code adopted for commercial construction in New Mexico? A. IRC B. UBC C. IBC D. BOCA Answer: C. IBC — The International Building Code (IBC) governs commercial buildings under the New Mexico Construction Industries Division . A Qualifying Party (QP) must demonstrate which of the following to obtain a GB-98 license? A. Ownership of a construction equipment fleet B. Minimum of four years of verifiable construction experience C. Completion of a four-year engineering degree D. Residency in New Mexico for at least two years Answer: B. Minimum of four years of verifiable construction experience. — The QP must provide documented experience (4 years for GB-98) in the relevant trade to qualify . Who is responsible for verifying jobsite safety compliance? A. Building officials B. The contractor C. Property owner D. Architect Answer: B. The contractor. — Contractors are responsible for ensuring OSHA compliance and safety on-site .

Vista previa del contenido

New Mexico General Building Contractor
(GB-98) Practice Exam 100 Questions And
Correct Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant Download
Pdf



1. What is the main building code adopted for commercial construction
in New Mexico?
A. IRC
B. UBC
C. IBC
D. BOCA
IBC governs commercial buildings under NM Construction Industries
Division.

2. Which trade requires a GB-98 contractor to subcontract with licensed
specialists?
A. Painting
B. Insulation

, C. Electrical
D. Drywall
Electrical work must be performed by a properly licensed EE98
contractor.

3. Who is responsible for verifying jobsite safety compliance?
A. Building officials
B. The contractor
C. Property owner
D. Architect
Contractors must ensure OSHA compliance on-site.

4. A contractor must notify the owner of material substitution that
affects:
A. Paint color
B. Cost or performance
C. Delivery timing only
D. Warranty paperwork only
Material changes impacting cost/functionality must be disclosed.

5. The minimum footing depth in New Mexico must extend below:
A. 6 inches
B. Frost line only
C. Frost line and to stable soil
D. Surface slab
Footings must bear on undisturbed soil below frost depth.

, 6. A change order becomes valid when:
A. Verbal approval from worker
B. Owner receives invoice
C. Both parties sign the change order
D. Contractor completes the work
Written and signed change orders are legally binding.

7. Workers must be trained in fall protection at heights above:
A. 10 ft
B. 6 ft
C. 4 ft
D. 20 ft
OSHA fall protection starts at 6 ft for construction.

8. A building permit is required for:
A. Painting
B. Flooring replacement
C. Structural modifications
D. Minor repairs
Structural changes require permitted review.

9. Which document sets quality standards and installation procedures?
A. Insurance policy
B. Specifications
C. Bid tab

Información del documento

Subido en
21 de julio de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.79

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ApexStudyVault
5.0
(3)
Vendido
8
Seguidores
0
Artículos
693
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes