• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 12 páginas
Examen

COSC 153 FINAL.pdf 1. Document information

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

COSC 153 FINAL.pdf 1. Document information

Vista previa del contenido

COSC 153 FINAL EXAM 2026/2027 QUESTIONS AND
SOLUTIONS RATED A+
✔✔Partition - ✔✔A wall that subdivides spaces within a room

✔✔Permit - ✔✔A governmental municipal authorization to perform a building process as
in zoning/use, demolition, grading, septic, building, electrical, plumbing

✔✔Pipes - ✔✔Carry different types of liquids for various purposes: water, storm, waste
water, hydronic

✔✔Pier - ✔✔A column of masonry/concrete/wood, used to support other structural
members, caisson

✔✔Plan View - ✔✔Drawing of a structure with the view from overhead, looking down

✔✔Portland Cement - ✔✔Cement made by heating clay and crushed limestone into a
brick and then grinding to a pulverized powder state

✔✔Post and Beam - ✔✔A basic building method that uses just a few hefty posts and
beams to support an entire structure

✔✔Punch List, Punch Out - ✔✔A list of discrepancies that need to be corrected by the
contractor - punch out is the inspection that creates the list

✔✔Rafter - ✔✔Lumber used to support the roof sheeting and roof loads, generally
2x10's and 2x12's are used - rafters of a flat roof are sometimes called roof joists

✔✔Rebar - ✔✔reinforcing bar-ribbed steel bars installed in foundation concrete walls,
footers, and poured in place concrete structures designed to strengthen concrete

✔✔Redline Drawings - ✔✔red-lined blueprints that reflect changes marked in red pencil

✔✔Roughing-In - ✔✔The initial stage of plumbing, electrical, heating, carpentry, etc.
when all components that won't be seen after the finishing phase are assembled

✔✔Specifications, Specs - ✔✔A narrative list of materials, methods, model numbers,
colors, allowances, and other details that supplement the info contained in
blueprints/drawings

✔✔Submittal - ✔✔Shop drawings, material data, samples, and product data; required
primarily for architect and engineer to verify that the correct products will be installed on
the project

, ✔✔Stud, Stud Framing - ✔✔a vertical wood or metal framing member, attached to the
horizontal sole plate below and the top plate above
a building method that distributes structural loads to each of a series of relatively
lightweight studs

✔✔Take Off - ✔✔The material necessary to complete a job

✔✔Truss - ✔✔An engineered and manufactured roof support member with "zigzag"
framing members - does the same job as a rafter but is designed to have a longer span
than a rafter

✔✔Utility Easement - ✔✔The area of the earth that has electric, gas, or telephone lines;
these areas may be owned by the homeowner but the utility company has the legal right
to enter the area as necessary to repair/service the lines

✔✔Vapor Barrier - ✔✔A building product installed on exterior walls, floors and ceilings
under the drywall and on the warm side of the insulation - used to stop/slow the
movement of water vapor into the walls and prevent condensation within them

✔✔Water Board - ✔✔Water resistant drywall to be used in tub and shower locations,
normally blue or green

✔✔Water Closet - ✔✔another name for toilet

✔✔Weep Holes - ✔✔Small hoes in storm window frames, masonry walls, or other
systems that allow moisture to escape

✔✔Yard of Concrete - ✔✔One cubic yard of concrete is 3'x3'x3', or 27 cubic feet, ine
truck typically carries 8 yards of concrete

✔✔Prehistoric Homes - ✔✔made with branches, bones, stones, & animal fur

✔✔Prehistoric Construction - ✔✔Major projects were always religious

✔✔Bronze Age Homes - ✔✔more advanced, precision cut wood members such as
columns and beams

✔✔Construction in Egypt - ✔✔stone, mortar, & gravity - pyramids were tombs

✔✔Egyptians used.... - ✔✔calcined gypsum

✔✔Romans used... - ✔✔lime** (made by heating limestone) + sand to make mortar;
used coarser stones to made concrete

Información del documento

Subido en
20 de julio de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MAINGRADES
3.6
(45)
Vendido
305
Seguidores
11
Artículos
38140
Última venta
14 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes