API 1169 PRACTICE EXAM 2026/2027 QUESTIONS AND
SOLUTIONS RATED A+
✔✔ASME B31.4 - ✔✔Standard Pipeline Transportation Systems for Liquids and
Slurries

✔✔ASME B31.8 - ✔✔Standard Gas Transmission and Distribution Piping Systems

✔✔29 CFR Part 1910 - ✔✔Regulation Occupational Safety and Health Standards

✔✔29 CFR Part 1926 - ✔✔Regulation Safety and Health Regulations for Construction

✔✔49 CFR Part 192 - ✔✔Regulation Transportation of Natural and Other Gas by
Pipeline

✔✔49 CFR Part 195 - ✔✔Regulation Transportation of Hazardous Liquids by Pipeline

✔✔White - ✔✔Proposed Excavation

✔✔Pink - ✔✔Temporary Survey Markings

✔✔Red - ✔✔Electrical

✔✔Yellow - ✔✔Gas, Oil, Steam, Petroleum or Gaseous Materials

✔✔Orange - ✔✔Communication, Alarm or Signal Lines

✔✔Blue - ✔✔Potable Water

✔✔Purple - ✔✔Reclaimed Water

✔✔Green - ✔✔Sewers and drain lines

✔✔Trenches _____ depth or Confined Spaces must be monitored before entry. Safe
oxygen levels are ________ - ✔✔4' 19.5% - 23.5%

✔✔Trenches _____ deep or greater require a protective system which can be sloping,
benching, trench boxes - ✔✔5'

✔✔Trenches _____ deep or greater require a protective system designed by a PE -
✔✔20'

, ✔✔4 soil types and sloping - ✔✔1. Rock=90 deg. or vertical 2. Type A=3/4:1 or 53 deg.
3. Type B=1.1 or 45 de. 4. Type C= 1 1/2:1 or 34 deg.

✔✔Trench Boxes must extend ____above outside soil level - ✔✔18"

✔✔In 29 CFR 1910 subpart ___ covers excavations - ✔✔P

✔✔Encroachment Area - ✔✔Area where the ground disturbance occurs within 50' of
centerline of ROW, facility or easement

✔✔Active Excavation Area - ✔✔Area where the edge of the disturbance is within 25' of
centerline of existing facilities

✔✔Excavation Tolerance Zone - ✔✔Area within 24" of facilities or the distance
mandated by state law, whichever is greater. NOTE: CGA & INGAA says 18".

✔✔When an excavation is within _____ of a pipeline facility an OQ qualified
representative shall be continuously present during all excavation and backfilling
activities to ensure that criteria is being met. - ✔✔10'

✔✔INGAA states that crossing company shall not permit soil disturbance within ____ of
the centerline of existing pipeline facilities without an owners rep being present. - ✔✔25'

✔✔Crossing angle - ✔✔As close to perpendicular as possible

✔✔ROW is established thru a written document known as the - ✔✔Easement

✔✔Plan devised between the Owner and crossing party to specify the details and
provisions under which the crossing construction shall occur - ✔✔Crossing plan

✔✔Hearing protection required in areas ____________ - ✔✔Noise level exceeds 85
dba over an 8 hour period. INGAA states during pressure testing to keep under 80 dba's

✔✔Flammable Liquids - ✔✔Class 1 liquids having a flash point below 100 deg F.
Gasoline.

✔✔Combustible Liquids - ✔✔Class 2 liquids having a flash point above 100 deg F.
Diesel, jet fuel motor oil

✔✔Hydro test parameters per 49 CFR 195 - ✔✔4 hrs @ 125% Max Operating Pressure
for above ground pipe. 8 hrs @ 110% MOP.

✔✔Remain _______ from any pipe being hydro-tested - ✔✔100'

Información del documento

Subido en
19 de julio de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK
3.5
(41)
Vendido
287
Seguidores
11
Artículos
36004
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes