• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 53 páginas
Examen

Leed Ga Exam Questions With 100% Correct Answers

Document preview thumbnail
Vista previa 4 fuera de 53 páginas

LEED GA EXAM QUESTIONS WITH 100% CORRECT ANSWERS

Vista previa del contenido

Which of the following sites qualify as a High Priority Site for LEED? (Select 3):


a. Infill location in a historic district
b. Federal Environmental Community
c. Difficult development area as defined by US Housing and Urban Development
d. Site where reduced costs allow for additional investment into energy efficiency
e. Federal Empowerment Zone


Give this one a try later!


Infill location in a historic district

Federal Environmental Community


Difficult development area as defined by US Housing and Urban
Development

,Select two of the following that are strategies to reduce light trespass;


a. Install uplighting in parking lots to reduce the spillage of light across the project
boundary
b. Schedule cleaning crews to work during the night to eliminate unnecessary lighting
use during the day
c. Schedule cleaning crews to work during the day to eliminate unnecessary lighting
use at night
d. Install downlighting in parking lots to reduce the spillage of light across the project
boundary
e. Install motion sensors or timers to reduce the amount of time exterior lights stay on
when they are not needed


Give this one a try later!


Install downlighting in parking lots to reduce the spillage of light across the
project boundary

Install motion sensors or timers to reduce the amount of time exterior lights
stay on when they are not needed




A project is an in-fill location in the downtown of a large city on a previously
developed site. The design team should consider which of the following? (select 2)


a. Use a combination of strategies (green roof, open-grid paving, and vegetated
strips) to improve stormwater quality
b. Work with existing flow patterns of the site to control the rate of stormwater run-off
c. Provide native/adaptive vegetation in accordance with Restore Habitat
d. Limit areas of disturbance in accordance with Protect Habitat
Feedback


Give this one a try later!

, Use a combination of strategies (green roof, open-grid paving, and
vegetated strips) to improve stormwater quality


Provide native/adaptive vegetation in accordance with Restore Habitat




What type of water cannot be used to reduce a building's usage of potable water?


a. Captured rainwater
b. Groundwater
c. Non-potable water
d. Graywater


Give this one a try later!


Groundwater




Graywater is often used for:


a. Dishwashers
b. Drinking
c. Swimming pools
d. Irrigation


Give this one a try later!


Irrigation




What is the definition of a Full Time Equivalent (FTE)?


a. The maximum number of employees in a building during any 24 hour period

, b. The ratio of female and male employees
c. The average number of customers during throughout an 8 hour day
d. A regular building occupant who spends a 40 hour workweek in a building


Give this one a try later!


A regular building occupant who spends a 40 hour workweek in a building




Which of the following strategies would be considered on-site renewable energy
sources?
(select 3)


a. an on-site electric generator powered by geothermal energy
b. a wind farm located within 50 miles of the project and owned and operated by the
local utility provider
c. a heat pump that extracts heat from the ground in the winter and uses it as a heat
sink in the summer
d. active solar-thermal collectors as a means of heating service hot water
e. building-integrated photovoltaic solar panels that provide electricity to the building
f. passive solar design features that capture measurable winter heating energy from
the sun


Give this one a try later!


an on-site electric generator powered by geothermal energy


active solar-thermal collectors as a means of heating service hot water

building-integrated photovoltaic solar panels that provide electricity to the
building




A LEED-CI project team wants to achieve the credit for having a LEED AP. Which of
the following is true?

Información del documento

Subido en
14 de julio de 2026
Número de páginas
53
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestITandFixIT
3.7
(13)
Vendido
57
Seguidores
0
Artículos
7306
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes