Ohio Demolition Contractor Exam Study Guide 2026–2027 | 100 OSHA Q&A

Document preview thumbnail
Vista previa 4 fuera de 38 páginas

Prepare for the Ohio Demolition Contractor Exam with 100 verified practice questions covering OSHA 29 CFR 1926 Subpart T, asbestos abatement, lead-safe work practices, structural shoring, debris handling, fall protection, explosive demolition permits, and site restoration. Each question includes a correct answer and detailed rationale. Instant PDF download for 2026–2027 exam prep.

Vista previa del contenido

Ohio Demolition Contractor Exam Practice
b b b b




Questions And Correct Answers (Verified
b b b b b




Answers) Plus Rationales 2026|2027 Q&A
b b b b b




| Instant Download Pdf
b b b b




1. Which of the following is the first step before starting a
b b b b b b b b b b b




demolition project?
b b




A. Begin removing walls immediately
b b b




B. Shut down nearby streets
b b b




C. Conduct a site survey and structural assessment
b b b b b b




D. Remove all debris from site
b b b b




Rationale: A site survey identifies structural stability, utilities,
b b b b b b b




b hazardous materials, and potential risks before demolition starts.
b b b b b b b




2. Before demolition, which type of utility must be verified as
b b b b b b b b b




b disconnected?
A. Telephone only b

, B. Cable TV only b b




C. Electric, gas, water, and sewer
b b b b




D. Air conditioning
b




Rationale: All utilities must be safely shut off to prevent explosions,
b b b b b b b b b b




b electrocution, or flooding. b b




3. OSHA requires a competent person to inspect the demolition site for
b b b b b b b b b b




b hazards:
A. Monthly
B. Daily
C. Weekly
D. Once per project
b b




Rationale: Daily inspections ensure ongoing safety as site conditions
b b b b b b b b




b change during demolition.
b b




4. What document is necessary to begin demolition in Ohio?
b b b b b b b b




A. OSHA report b




B. Demolition permit from the local authority
b b b b b




C. EPA emission summary
b b




D. Contractor’s insurance policy b b




Rationale: Local building departments issue demolition permits after
b b b b b b b




b verifying compliance with regulations.
b b b

,5. Which of the following is required when asbestos is present?
b b b b b b b b b




A. Regular dust suppression b b




B. Certified asbestos abatement prior to demolition
b b b b b




C. Continue work with respirators b b b




D. Notify neighbors b




Rationale: Federal and Ohio EPA laws mandate asbestos removal by
b b b b b b b b b




b certified professionals before demolition.
b b b




6. What is the primary purpose of a demolition plan?
b b b b b b b b




A. Estimate project costs b b




B. Outline safe methods and sequences of demolition
b b b b b b




C. Determine disposal fees b b




D. Identify subcontractors b




Rationale: The demolition plan ensures safety and efficiency by
b b b b b b b b




b detailing step-by-step procedures.
b b




7. What PPE must be worn during mechanical demolition?
b b b b b b b




A. Hard hat, steel-toed boots, gloves, eye and ear protection
b b b b b b b b




B. Safety vest only b b




C. Face mask and shorts
b b b




D. Regular clothing b

, Rationale: Full protective gear is essential to protect workers from
b b b b b b b b b




b falling debris and dust.
b b b




8. In Ohio, who enforces workplace safety during demolition?
b b b b b b b




A. State EPA b




B. OSHA
C. Local building department
b b




D. Department of Transportation b b




Rationale: OSHA governs worker safety standards for all demolition
b b b b b b b b




b operations.



9. What should be done before demolishing load-bearing walls?
b b b b b b b




A. Remove them immediately
b b




B. Install temporary supports or shoring
b b b b




C. Wet the area
b b




D. Place caution tape
b b




Rationale: Shoring maintains structural stability and prevents collapse.
b b b b b b b




10. Dust control during demolition is typically achieved by:
b b b b b b b




A. Water spraying or misting systems
b b b b




B. Air blowers
b




C. Fans

Información del documento

Subido en
7 de julio de 2026
Número de páginas
38
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectgrayson
3.9
(18)
Vendido
124
Seguidores
5
Artículos
2400
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes