Examen

PJM System Operations, Reliability, Markets, and Restoration Practice Questions with Answers..

Document preview thumbnail
Vista previa 4 fuera de 62 páginas

This document contains comprehensive PJM practice questions and answers covering power system operations, energy markets, system restoration, reserve requirements, voltage control, generator dispatch, transmission operations, emergency procedures, and reliability standards. It includes Quizlet-style review material focused on PJM operating procedures, NERC reliability concepts, black start operations, market rules, regulation services, and contingency management, making it an excellent resource for PJM operator certification and exam preparation.

Vista previa del contenido

PJM performs a Reliability Assessment Commitment starting with the results of the DA
market.


What philosophy does PJM use when performing this RAC?


Give this one a try later!


Minimize start ups and no loads




When PJM experiences problems with their primary digital control signal, it sometimes
becomes necessary for companies with the capability, to switch to the back-up signal.


This backup signal is known as:


Give this one a try later!

, Analog control




a 300 MW generator is capable of providing 60 MVAR at full energy output and be
within the limits of its generator operating curve.


The generator is currently operating at its max MW & MVAR output, when due to
voltage problems PJM requests and additional 50 MVAR support from the generator.


What action will have to be taken in order to accommodate PJM's request?


Give this one a try later!


The energy output will have to be reduced in order to increase the MVAR
output.




What is the most critical communication path when restoring large load blocks early
in a system restoration?


Give this one a try later!


between the generating unit and the transmission owner




Which of the following actions is a violation of PJM two settlement market rules?


1. bidding a unit DA on a price-based schedule


2. not bidding demand (load) into the DA market


3. not bidding an available PJM capacity resource into the DA market

,4. making the Eco high limit and the emergency high limit the same


Give this one a try later!


not bidding an available PJM capacity resource into the DA market




Which are the following is/are requirements for Black Start Generation?


a. must be tested every 3 years
b. must be able to run for 12 hours, or as defined by the TO restoration plan
c. have the ability to maintain frequency and voltage under varying load
d. must have and maintain procedures for the unit


Give this one a try later!


have the ability to maintain frequency and voltage under varying load and
must have and maintain procedures for the unit


a - 1 year
b - 16 hrs




LMPs will change:


Give this one a try later!


when marginal generator output changes




During restoration, ______ ______ are placed in service when initially restoring the system
to help reduce system voltages.

, Give this one a try later!


shunt reactors




All of the following elements must be reported to PJM when an IRC is requested
EXCEPT:


1. operating reserves


2. synchronized reserve


3. Generator MVAR reserves


4. Non-synchronized reserves


Give this one a try later!


generator MVAR reserves




All of the following is data that is sent from the PJM Control Center to market
Operation Centers EXCEPT:


1. Regulation capability


2. Dispatch Cost


3. Area Control Error


4. Regulation Signal


Give this one a try later!

Información del documento

Subido en
7 de julio de 2026
Número de páginas
62
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
scholarmotivator
4.0
(14)
Vendido
156
Seguidores
48
Artículos
6587
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes