Which statement about AIA C103, Standard Form of Agreement Between Owner and
Consultant without a Predefined Scope of Consultant's Services is correct? AIA C103
(A) makes the architect a party to the agreement between the owner and the
consultant
(B) includes the scope of work that the consultant is responsible for providing
(C) is used to contract for geotechnical and land surveying services
(D) is used to form the agreement between the owner and the architect instead of AIA
B101
Give this one a try later!
, (C) is used to contract for geotechnical and land surveying services
C103 is used to allow the owner to contract directly with consultants. The
document establishes the general terms of the agreement such as
ownership of copyright and licenses, requirements for compensation and
schedule, dispute resolution, and termination of the contract. This
document does not make the architect a party to the agreement between
the owner and the consultant. C103 also does not include the scope of
work that the consultant will perform. C201, standard Form of Consultant's
Services: Land Sruvey, or C202, Standard Form of Consultant's Services:
Geotechnical Engineering, may be attached as an exhibit to C103 to define
the responsibilities of these professionals.
The owner can also use C103 to contract directly with another engineering
consultant, such as mechanical or structural engineer, but the owner and
engineer must develop a scope of work specific to the project.
The contract between the architect and owner should be formed using one
of the sample agreements designed specifically for this purpose such as
B101 or a similar document describing the unique relationship between
architect and owner
An architecture firm is designing a university's safety and security headquarters. The
form teams with a security consultant to design the emergency response center and
prepare specifications for specialty equipment such as dispatch communications,
closed-circuit cameras and monitors, and campus emergency telephones. The
architect determines that this consultant's services will be necessary in the design
phase only and that the consultant firm will not be involved with construction
administration. The AIA publishes multiple sample agreements that an architect can
use to team with a consultant. Which AIA document is most appropriate for use in this
case?
(A) C727, Standard Form of Agreement Between Architect and Consultant for Special
Services
(B) C401, Standard Form of Agreement Between Architect and Consultant
(C) B142, Standard Form of Agreement Between Owner and Consultant where the
,Owner contemplates using the design-build method of project delivery
(D) B206, Standard Form of Architect's Services: Security Evaluation and Planning
Give this one a try later!
(A) C727, Standard Form of Agreement Between Architect and Consultant
for Special Services
C401 incorporates the prime agreement between the architect and owner
into the architect consultant agreement, which is advantageous when the
consultant will be involved with the entire project
B142 may be used when the consultant -- usually an owner's representative
-- is directly hired by the owner in a design-build project. This document
can be used in a case where the owner chooses not to hire and architect to
serve in this capacity
B206 is an owner-architect agreement to be used when an architecture firm
provides security evaluation and design services that are classified as
additional services. This form is intended ro be used with B101 or with G802,
Amendment to the Professional Services Agreement.
C727 allows the architect and consultant to define a limited scope of
services but does not pass through the responsibilities assigned in the
prime agreement between the owner and the architect
An architect and owner decide to use design-assist contracting for a project that
involves restoring and casting replacement parts for an intricately detailed cast-iron
facade. Which statement about design-assist contracting is correct?
(A) Design-assist contracting allows the architect to seek guidance from a
manufacturer or specialty craftsman for a unique or innovative design
(B) Design-assist contracting is most appropriately used with the design-bid-build
method of project delivery
(C) The design-assist contracting process has four phases
, (D) The vendor working with the architect in design-assist contracting arrangement
provides design services with no compensation for design-phase efforts. In
exchange, that vendor will be awarded the construction contract for the work
Give this one a try later!
(A) Design-assist contracting allows the architect to seek guidance from a
manufacturer or specialty craftsman for a unique or innovative design
Which of the following are considered reimbursable expenses that can be charged to
the owner by the architect, assuming that their agreement is based upon AIA B101,
Standard Form of Agreement Between Owner and Architect? (Choose the four that
apply.)
(A) plan review and fees paid to the local code enforcement office
(B) overtime work
(C) a $1 million increase to the architect's normal limits of professional liability
coverage, requested by the owner
(D) upgrading from an earlier version of CAD software to the most current release
(E) expenses incurred by the architect to prepare a response to the owner's original
request for proposal
(F) state or local taxes on professional services
Give this one a try later!
Consultant without a Predefined Scope of Consultant's Services is correct? AIA C103
(A) makes the architect a party to the agreement between the owner and the
consultant
(B) includes the scope of work that the consultant is responsible for providing
(C) is used to contract for geotechnical and land surveying services
(D) is used to form the agreement between the owner and the architect instead of AIA
B101
Give this one a try later!
, (C) is used to contract for geotechnical and land surveying services
C103 is used to allow the owner to contract directly with consultants. The
document establishes the general terms of the agreement such as
ownership of copyright and licenses, requirements for compensation and
schedule, dispute resolution, and termination of the contract. This
document does not make the architect a party to the agreement between
the owner and the consultant. C103 also does not include the scope of
work that the consultant will perform. C201, standard Form of Consultant's
Services: Land Sruvey, or C202, Standard Form of Consultant's Services:
Geotechnical Engineering, may be attached as an exhibit to C103 to define
the responsibilities of these professionals.
The owner can also use C103 to contract directly with another engineering
consultant, such as mechanical or structural engineer, but the owner and
engineer must develop a scope of work specific to the project.
The contract between the architect and owner should be formed using one
of the sample agreements designed specifically for this purpose such as
B101 or a similar document describing the unique relationship between
architect and owner
An architecture firm is designing a university's safety and security headquarters. The
form teams with a security consultant to design the emergency response center and
prepare specifications for specialty equipment such as dispatch communications,
closed-circuit cameras and monitors, and campus emergency telephones. The
architect determines that this consultant's services will be necessary in the design
phase only and that the consultant firm will not be involved with construction
administration. The AIA publishes multiple sample agreements that an architect can
use to team with a consultant. Which AIA document is most appropriate for use in this
case?
(A) C727, Standard Form of Agreement Between Architect and Consultant for Special
Services
(B) C401, Standard Form of Agreement Between Architect and Consultant
(C) B142, Standard Form of Agreement Between Owner and Consultant where the
,Owner contemplates using the design-build method of project delivery
(D) B206, Standard Form of Architect's Services: Security Evaluation and Planning
Give this one a try later!
(A) C727, Standard Form of Agreement Between Architect and Consultant
for Special Services
C401 incorporates the prime agreement between the architect and owner
into the architect consultant agreement, which is advantageous when the
consultant will be involved with the entire project
B142 may be used when the consultant -- usually an owner's representative
-- is directly hired by the owner in a design-build project. This document
can be used in a case where the owner chooses not to hire and architect to
serve in this capacity
B206 is an owner-architect agreement to be used when an architecture firm
provides security evaluation and design services that are classified as
additional services. This form is intended ro be used with B101 or with G802,
Amendment to the Professional Services Agreement.
C727 allows the architect and consultant to define a limited scope of
services but does not pass through the responsibilities assigned in the
prime agreement between the owner and the architect
An architect and owner decide to use design-assist contracting for a project that
involves restoring and casting replacement parts for an intricately detailed cast-iron
facade. Which statement about design-assist contracting is correct?
(A) Design-assist contracting allows the architect to seek guidance from a
manufacturer or specialty craftsman for a unique or innovative design
(B) Design-assist contracting is most appropriately used with the design-bid-build
method of project delivery
(C) The design-assist contracting process has four phases
, (D) The vendor working with the architect in design-assist contracting arrangement
provides design services with no compensation for design-phase efforts. In
exchange, that vendor will be awarded the construction contract for the work
Give this one a try later!
(A) Design-assist contracting allows the architect to seek guidance from a
manufacturer or specialty craftsman for a unique or innovative design
Which of the following are considered reimbursable expenses that can be charged to
the owner by the architect, assuming that their agreement is based upon AIA B101,
Standard Form of Agreement Between Owner and Architect? (Choose the four that
apply.)
(A) plan review and fees paid to the local code enforcement office
(B) overtime work
(C) a $1 million increase to the architect's normal limits of professional liability
coverage, requested by the owner
(D) upgrading from an earlier version of CAD software to the most current release
(E) expenses incurred by the architect to prepare a response to the owner's original
request for proposal
(F) state or local taxes on professional services
Give this one a try later!