During certain emergency conditions, a Capacity Performance generation resource
that fails to generate the required amount of energy may be charged:
A. a peak period maintenance penalty
B. a non=performance assessment charge
C. an additional credit requirement
D. the synchronized reserve market clearing price for the past 19 days
Give this one a try later!
B. a non=performance assessment charge
PJM sends what signals to Market Operation Centers?
Give this one a try later!
, ACE, Regulation, and Dispatch
PJM calls and instructs you to increase MVAR output for voltage support 50MVAR.
What do you do?
Give this one a try later!
Look at "D" curve and decrease your MW output to a level that will increase
reactive power output by 50 MVAR
How does PJM define a black start resource?
Give this one a try later!
can start w/o outside electrical supply
What type of outage may be deferred to beyond the next weekend or can be
postponed to the following Monday morning at 0800?
Give this one a try later!
Maintenance outage
Operating reserves consists of what?
Give this one a try later!
, Synchronized reserves, non-synchronized reserves(quick start), and
supplemental reserves(secondary)
How often are black start units tested?
Give this one a try later!
Yearly/Annually
What does PJM put the most emphasis on during a terrorist/sabotage event?
Give this one a try later!
Operations and Communications
What part of the SSR is the Fuel Limited Resources accounted for?
Give this one a try later!
Part G Resource Limited Units which are units that are not able to run at
max capacity for more than 72 hours
What is the Emergency Reducible Generation (ERG) if the Eco Min is 100 and the
Emergency Min is 75?
Give this one a try later!
that fails to generate the required amount of energy may be charged:
A. a peak period maintenance penalty
B. a non=performance assessment charge
C. an additional credit requirement
D. the synchronized reserve market clearing price for the past 19 days
Give this one a try later!
B. a non=performance assessment charge
PJM sends what signals to Market Operation Centers?
Give this one a try later!
, ACE, Regulation, and Dispatch
PJM calls and instructs you to increase MVAR output for voltage support 50MVAR.
What do you do?
Give this one a try later!
Look at "D" curve and decrease your MW output to a level that will increase
reactive power output by 50 MVAR
How does PJM define a black start resource?
Give this one a try later!
can start w/o outside electrical supply
What type of outage may be deferred to beyond the next weekend or can be
postponed to the following Monday morning at 0800?
Give this one a try later!
Maintenance outage
Operating reserves consists of what?
Give this one a try later!
, Synchronized reserves, non-synchronized reserves(quick start), and
supplemental reserves(secondary)
How often are black start units tested?
Give this one a try later!
Yearly/Annually
What does PJM put the most emphasis on during a terrorist/sabotage event?
Give this one a try later!
Operations and Communications
What part of the SSR is the Fuel Limited Resources accounted for?
Give this one a try later!
Part G Resource Limited Units which are units that are not able to run at
max capacity for more than 72 hours
What is the Emergency Reducible Generation (ERG) if the Eco Min is 100 and the
Emergency Min is 75?
Give this one a try later!