Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 33 páginas
Examen

CSLB B General Contractor License Exam Review

Document preview thumbnail
Vista previa 4 fuera de 33 páginas

This study material is designed to support individuals preparing for the California Contractors State License Board (CSLB) B General Building Contractor License examination. It provides review materials, practice questions, and assessment-focused content to help learners strengthen their understanding of general building construction, business practices, safety requirements, and California licensing regulations. The material covers key topics including California contractor licensing laws, construction planning, blueprint reading, building materials, project management, estimating and bidding, contracts, scheduling, OSHA safety standards, risk management, building codes, quality control, financial management, insurance and bonding, permit requirements, ethics, and legal responsibilities of general building contractors. Emphasis is placed on applying industry best practices, maintaining regulatory compliance, and developing the knowledge required to successfully manage residential and commercial construction projects. This material is suitable for general contractor license candidates, construction professionals, project managers, apprenticeship programs, competency assessments, continuing education, and professional development in the construction industry.

Vista previa del contenido

CSLB B LICENSE GENERAL CONTRACTOR EXAM |
330 Questions with 100% Correct Answers If
unused mortar stiffens due to hydration of cement, what must you do? -
Correct Answer -Discard the mortar
What minimum time must you wait before caulking or grouting new tiles? -
Correct Answer -24-48 Hours
How long should you wait before installing tile on a shower pan? - Correct
Answer -24 Hours
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having
compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are
typical examples of: - Correct Answer -Type-B Soils
If 65 street lights are fed by a 2275 volt series circuit, what is the voltage
across each light? - Correct Answer -35V
In a series circuit, the total voltage is divided equally.

For safety reasons, the maximum simple slope of an excavation, up to 20 ft
deep, in Type-B soil is: - Correct Answer -1:1 (45°)
A Pittsburgh joint is used in: - Correct Answer -HVAC ductwork
The drain for a pressure relief valve on a water heater should be extended
to: - Correct Answer -The outside of the building
What is the minimum slope toward the drain of a shower pan? - Correct
Answer -1/4" per foot (2%)
What is the diameter of #3 rebar? - Correct Answer -3/8"
If a vendor fails to provide an MSDS, you have the right to call: - Correct
Answer -Cal/OSHA or DOSH
When installing a door jamb, you need shims at: - Correct Answer -Both
hinge and strike sides, three on each side.

Which of the following is used to adhere vinyl floors?

A. Epoxy cement
B. Asphalt mastic

C. Latex primer

,D. White glue - Correct Answer -Epoxy cement

When do you need bracing for a drywall wall? - Correct Answer -Diagonal
bracing is needed every 25' for any drywall wall.

How should you clear the roots from a construction site? - Correct Answer -
Clear roots to 12" below grade.

Dividing watts by amps gives you: - Correct Answer -Volts

The most frequent on-the-job roofing accidents are: - Correct Answer -Falls

Which of the following is NOT a type of wood block flooring?

A. Parquet
B. Wood Mosaic
C. Wood Tile
D. All of the above. - Correct Answer -Wood tile

Lightweight concrete is best used for:

A. Curb and Gutter
B. Second floor decking
C. First floor slab on grade
D. Footings - Correct Answer -Second floor decking

The tool used to carry grout needed to patch a small hole is a:

A. Hawk
B. Poling board
C. Spot board
D. Mason's scutch - Correct Answer -Spot Board

Which pipe is NOT appropriate for industrial wastes?

A. Cast iron
B. Schedule 40 ABS DWV
C. Extra strength vitrified clay
D. Copper - Correct Answer -Copper

Where do you need a fire wall?

A. Between a living room and a bedroom
B. Between a bedroom and a bathroom
C. Between a kitchen and a bath

,D. A separation wall between a dwelling and an attachment - Correct Answer
-A separation wall between a dwelling and an attachment.

What is the minimum clearance between rough ground and untreated
subfloor joists? - Correct Answer -18 inches

Who may remove asbestos? - Correct Answer -Contractor with Asbestos
Certification on license.

Which of the following is NOT likely to be found in significant proportions in
granular soil?

A. Gravel
B. Sand
C. Silt
D. Clay - Correct Answer -Clay

Stiles and rails are used on which of the following?

A. Furred walls
B. Roofs
C. Windows
D. Slabs - Correct Answer -Windows.

A stile is the vertical edges of the window and the rails are the bottom and
top.

What does a high slump test indicate? - Correct Answer -Too much water.

Metal concrete forms should be?

A. Oiled
B. Watered
C. Placed against gravel
D. Discarded after each use - Correct Answer -Oiled

What does the R mean in a description of insulation? - Correct Answer -
Resistance

What kind of door would you install for someone with a disability?

A. Automatic with minimum of 3 seconds to close
B. Automatic with maximum of 5 seconds to open
C. Manual with maximum of 8.5 pounds to operate
D. Either A or C - Correct Answer -Either A or C

, Triple-walled metal chimney installations are regulated by: - Correct Answer -
ICC

ICC-IBC-IRC is the international code council. IBC is international building
code commercial. IRC is the international residential code.

If you are a general contractor, you should call a specialty contractor when: -
Correct Answer -You encounter an unfamiliar trade.

When a stairway serves a public building, what is the minimum number of
steps for which a handrail is required? - Correct Answer -Two

What is the minimum underlayment for asphalt shingles? - Correct Answer -
15 pounds

How long should you wait before sealing new tile work? - Correct Answer -2
weeks

When do you install insulation? - Correct Answer -After the electrical and
plumbing are approved.

When do you NOT need an exhaust fan in a bathroom? - Correct Answer -
When there is a window in the bathroom.

What is a bush-hammer used for? - Correct Answer -Roughen surface of
hardened concrete.

When you say a wall is perfect it is: - Correct Answer -Both plumb and
straight.

The purpose of a batter board in concrete work is: - Correct Answer -Support
layout strings when location foundations.

What is the difference between a hip jack rafter and a common rafter? -
Correct Answer -A hip jack runs from the top plate to a hip rafter, but a
common rafter runs to the ridge board.

When should you float a concrete surface? - Correct Answer -As soon as the
water sheen evaporates

When installing drywall screws you should:

A. Countersink
B. Drive just below the face of the board
C. Leave slightly above the surface

Información del documento

Subido en
6 de julio de 2026
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
ExamGeniusVault
5.0
(1)
Vendido
6
Seguidores
0
Artículos
772
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes