A contractor installs silt fence along the toe of a fill slope but places it
directly within a concentrated drainage swale carrying runoff from 6
acres. After the first rainfall, the fence collapses. What was the primary
design error?
A. Wrong fabric color.
B. Posts spaced too closely.
C. Using silt fence in concentrated flow.
D. Installing before grading. - Correct Answer - C.
During inspection of a utility corridor, you observe rills forming despite
recently applied mulch. Rainfall intensity exceeded predictions, and
runoff velocity increased because diversion ditches were never installed.
What corrective measure should receive the highest priority?
A. Additional fertilizer.
B. Install runoff diversions immediately.
C. Increase mowing frequency.
D. Remove mulch. - Correct Answer - B. Diversions
,2|Page
A residential subdivision contains multiple storm drain inlets already
connected to the municipal storm sewer. Fine sediment from adjacent
grading operations is entering the system despite perimeter controls
functioning properly. Which BMP should be implemented first?
A. Check dams upstream of inlets.
B. Inlet protection devices.
C. Additional construction entrances.
D. Dust suppression. - Correct Answer - B.
A steep cut slope consists primarily of weathered shale with sparse
vegetation. Permanent stabilization must occur before the rainy season
begins. Which stabilization approach provides the highest probability of
long-term erosion resistance?
A. Hydroseeding alone.
B. Temporary mulch only.
C. Rolled erosion control blanket with permanent vegetation.
D. Leave slope untreated. - Correct Answer - C.
A project inspector discovers that sediment is bypassing a rock
construction entrance because vehicles are exiting around its edge.
Which corrective action is most appropriate?
A. Increase aggregate thickness only.
B. Extend entrance width and restrict bypass access.
C. Remove aggregate.
,3|Page
D. Add fertilizer. - Correct Answer - B.
A large industrial site is located adjacent to a cold-water trout stream
classified as highly sensitive habitat. Which erosion and sediment
control objective should receive the greatest emphasis?
A. Minimize dust generation.
B. Reduce equipment traffic.
C. Reduce fuel consumption.
D. Prevent turbidity and sediment discharge. - Correct Answer - D.
A sediment basin serving a disturbed watershed consistently produces
highly turbid discharge despite adequate storage volume. Inspection
reveals the basin is receiving runoff from highly dispersive clay soils
with very fine suspended particles. Which modification would most
improve sediment removal efficiency?
A. Reduce basin depth.
B. Remove the forebay.
C. Increase outlet diameter.
D. Increase detention time and incorporate approved flocculation
treatment. - Correct Answer - D.
A pipeline project crosses rolling terrain containing numerous
intermittent drainageways. The contractor proposes installing continuous
silt fence along the entire corridor regardless of drainage patterns. As the
CPESC, what is the greatest technical concern?
, 4|Page
A. Excessive vegetation growth.
B. Fence installation costs are too low.
C. Aggregate entrances will become ineffective.
D. Concentrated runoff will overwhelm continuous silt fence. - Correct
Answer - D.
During construction of a steep roadway cut, runoff velocities within
temporary diversion channels exceed design assumptions after a 10-year
storm. Minor channel erosion rapidly progresses into headcutting toward
the disturbed slope. Which corrective action should receive the highest
priority?
A. Remove the diversion channel.
B. Seed the channel after construction ends.
C. Increase slope length.
D. Install velocity control measures such as check dams or channel
lining. - Correct Answer - D.
Following a 4.8-inch rainfall event, a temporary sediment basin overtops
without structural failure. Downstream inspections reveal sediment
deposition extending several hundred feet into a receiving channel. The
basin's storage volume met minimum design standards. What is the most
likely technical deficiency?
A. Insufficient detention and emergency overflow evaluation.
B. Excessive vegetative cover.
C. Excessive infiltration.