Questions Fully Solved 2026 Updated
Types of Loads - Answer Dead, Live, Construction, Environmental, and Lateral Earth Pressure
Available Design Methods for Construction Loads - Answer Allowable Stress Design (ASD)
Load and Resistance Factor Design (LRFD)
Building Type & Construction Method - Answer Residential: Light wood stick framing
Commercial: Wood, steel, or masonry
High-rise and other commercial: heavy steel framing or reinforced concrete
Long-Span Bridges: steel cables
Wood Framing - Answer Most common way to build houses in NA
Simplified Building Procedure for Wood House - Answer 1. Place concrete foundation
2. Place first floor walls
3. Construct wood platform to build second floor
4. Place second floor walls
5. Place roof on top of 2nd floor walls
Steel Framing - Answer Most common for high-rise and commercial buildings
Similar to wood but with less flexibility
High strength & relatively light weight
Expensive compared to other materials
Concrete Structures - Answer Concrete systems are commonly used in high-ride buildings
More resistant to fire than steel or wood
Less prone to corrosion than steel (common for UG structures)
Simplified Building Procedure for Concrete Structures - Answer 1. Prepare concrete mix
design
2. Prepare formwork
3. Pour steel reinforcement
4. Pour Concrete
,5. Allow for concrete curing process
6. Disassemble formwork
Advantage of Precast Concrete - Answer Higher quality fabrication from casting off-site
Can accelerate construction schedules
A two-story multi-family residential structure is being construction in a high seismic area. Which
construction type is most likely to be used? - Answer Wood Framing
(2-story, low rise residential)
"High-seismic" is a distractor
Temporary Structures - Answer May be removed at end of construction (usually)
May be incorporated into the finished structure
Concrete formwork is a common example of temporary structure
Design Considerations of Concrete formwork - Answer Dead Load: weight of fresh concrete
plus form self weight
Live Load: 50-75 psf depending on equipment used (to pour concrete)
Lateral pressure exerted by fresh concrete
Typical formwork material - Answer 3/4" plywood that is coated on one side
Types of concrete formwork - Answer Slab Formwork
Beam Formwork
Column/Wall Formwork (look at photos)
Equation for Lateral Pressures of Concrete - Answer ACI 347R-14 Table 4.2.2.1a(a)
Project Management Process Groups - Answer Initiation -> Planning -> executing ->
Controlling and monitoring (loop back to planning) -> closing
Ex. of loop (Value Engineering)
Gantt Chart - Answer Small to mid-size projects
Forecast & manage resources (labor, equipment, budgets, etc)
Disadvantage: doesn't show all the links/sequencing
, Critical Path Method (CPM) - Answer Project modeling technique that identifies the most
critical activities on a schedule
Helps monitor the assets, expenses, and advancement of the project
Activity on Node (AON) is most common
PERT - Answer Program Evaluation Review Technique (also known as CPM)
Float Time (slack time) - Answer Amount of time that an activities can be delayed without
affecting the overall schedule (applies to activities not on CP)
Applying the CPM (steps) - Answer 1. Specify each activity
2. Sequence the activities
3. Draw the network diagram
4. Identify the CP
5. Update to show progress
AOA (Activity on Arc)
Define Dummy Nodes & Dummy Activities - Answer Dummy Node: Used when 2 activities
have the same starting and ending event
Dummy Activity: Have no duration, used to prevent an activity from occurring in more than 2
spot
Contract Documents (what is included?) - Answer Contract Terms
Quantity and cost estimates
project and task descriptions (SOW)
Specification of the deliverables
Time, resources, and payment
Design Sequencing Phases - Answer Schematic Design
Design Development
Construction Documents
Bidding Process
Project Costs - Answer Direct Costs (Raw materials, labor, fuel, etc)
Indirect Costs (Overhead, taxes, administrative)