Teledyne Isco Manufacturing ABC Analysis




a. How much overhead will be assigned to each product if these three cost drivers are used to alloca


Divide cost by
Activity: Cost Total Qty of cost driver qty = ABC rate
DM Add costs 56,000 280,000 0.2
No. of Prod runs 60,480 60 1,008
No. of inspections 85,120 19 4,480
Total 201,600
DL
DM
Total Cost
Units Produced
Total per unit


The ABC analysis shows the small pump is significantly more expensive per unit, mostly due to high



b. How much of the overhead will be assigned to each product if direct labor cost is used to allocate

Overhead rate 201600/224000 0.9

Large Pump Small Pump
120,960 80,640 FOH
134,400 89,600 DL
179,200 100,800 DM
434,560 271,040 Total
$48.50 $121 Total per unit

The traditional costing under-costs the small pump compared to ABC and over-costs the large pump



c. Write a memo to the marketing manager explaining why the large pump might be experiencing re
recommendation for which costing system to use.

Dear Marketing Manager,

, c. Write a memo to the marketing manager explaining why the large pump might be experiencing re
recommendation for which costing system to use.

Dear Marketing Manager,
Following your request I have reviewed the production costs of both of our pumps, small and large u
on the direct labour) and Activity-Based Costing (ABC) based on the activities performed and identifi
insights into the pricing and perceived market value of each product.

Key Findings:
Under the traditional approach. overhead is allocated based solely on direct labour and thus, assigns
($48.50 per unit) and $89,640 in overhead to the Small Pump ($121 per unit).
However, using ABC, which consideres actual cost drivers (material used, production runs and inspe
overhead to the Large Pump ($45.25 per unit) and $109,760 in the overhead to the Small Pump ($13
Large Pump Small Pump
Traditional (current Costing) $120,960 $89,640
per unit $48.50 $121
ABC Method $91,840 $109,760
per unit $45.25 $134

In my findings the traditional method we are currently using overstates the costs of the Large Pump,
Pump, which requires more oversight and quality control.

The pricing resistance you are seeing for the Large Pump is likely due to its being overpriced compa
I am guessing. Customers might be perceiving it as expensive and most likely more expensive to ou
I recommend transitioning to ABC method moving forward for internal product costing and pricing st

Información del documento

Subido en
30 de junio de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Otro
Personaje
Desconocido
$14.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
81
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes