HESI MATH CERTIFICATION SCRIPT
2026 QUESTIONS WITH SOLUTIONS
GRADED A+
◍ Preparing a bid request includes which of the following:
A. Verifying References.
B. Identifying potential contractors.
C. Recommending a contractor to the board.
D. Verifying contractor insurance..
Answer: B
◍ Legal review prior to executing a contract will assist the association in the
event that:
A. A subcontractor is used.
B. A performance bond is required.
C. There is a budgetary shortfall.
D. The board has questions or concerns..
Answer: D
◍ Rather than describing the scope of work in detail in the contract, a manager
may:
A. Attach the bid specifications.
B. Call each contractor to describe the job.
C. Be on-site to oversee project content.
D. Suggest the board meet the contractor to talk about the scope of work..
Answer: A
◍ In older condominiums, an association should have what type of contract
covering mechanical equipment?
A. Time and materials
B. Specific repair
, C. Service
D. Preventative maintenance.
Answer: D
◍ For which project would a board most likely want to use a consultant to help
develop bid specifications?
A. Landscape renovation project
B. Repairing and/or replacing roofs
C. Painting the interior of lobbies and hallways
D. Repairing HVAC and boilers.
Answer: B
◍ In what type of contract would a waiver of lien be recommended?
A. Repair of the HVAC system
B. Re-roofing the buildings
C. Repair of the pool pump
D. Annual tree pruning.
Answer: B
◍ In terms of compensation , a contract should state:
A. Who provides insurance coverage
B. Each employees rate to perform work
C. When and on what terms payment(s) will be made
D. Requirement for a payment bond.
Answer: C
◍ Alternative dispute resolution includes which of the following methods?
A. Mediation
B. Subrogation
C. Litigation
D. Indemnification.
Answer: A
◍ Employment contracts need not included:
A. Legal Sources
B. Interests
2026 QUESTIONS WITH SOLUTIONS
GRADED A+
◍ Preparing a bid request includes which of the following:
A. Verifying References.
B. Identifying potential contractors.
C. Recommending a contractor to the board.
D. Verifying contractor insurance..
Answer: B
◍ Legal review prior to executing a contract will assist the association in the
event that:
A. A subcontractor is used.
B. A performance bond is required.
C. There is a budgetary shortfall.
D. The board has questions or concerns..
Answer: D
◍ Rather than describing the scope of work in detail in the contract, a manager
may:
A. Attach the bid specifications.
B. Call each contractor to describe the job.
C. Be on-site to oversee project content.
D. Suggest the board meet the contractor to talk about the scope of work..
Answer: A
◍ In older condominiums, an association should have what type of contract
covering mechanical equipment?
A. Time and materials
B. Specific repair
, C. Service
D. Preventative maintenance.
Answer: D
◍ For which project would a board most likely want to use a consultant to help
develop bid specifications?
A. Landscape renovation project
B. Repairing and/or replacing roofs
C. Painting the interior of lobbies and hallways
D. Repairing HVAC and boilers.
Answer: B
◍ In what type of contract would a waiver of lien be recommended?
A. Repair of the HVAC system
B. Re-roofing the buildings
C. Repair of the pool pump
D. Annual tree pruning.
Answer: B
◍ In terms of compensation , a contract should state:
A. Who provides insurance coverage
B. Each employees rate to perform work
C. When and on what terms payment(s) will be made
D. Requirement for a payment bond.
Answer: C
◍ Alternative dispute resolution includes which of the following methods?
A. Mediation
B. Subrogation
C. Litigation
D. Indemnification.
Answer: A
◍ Employment contracts need not included:
A. Legal Sources
B. Interests