APM PMQ Exam Questions and Answers
with Verified Solutions | Latest Updated
2026
The BC documents options, BC + Options Prioritisation
including a do nothing. Need
clarity about the problem and
options. Consider the lifecycle,
SH pressure, ACs, end users,
objectives and requirements
Technical, social, Defining Options
procurement, management,
transition
Options can be explored for Iterative solution development
longer, must haves are
delivered incrementally to
make the MVP, gain
progressive feedback from
user, develop into MMP and
beyond
Options analysis done very Linear solution development
early, preferred solution is
agreed with scope,
requirements then agreed
amd undergo change control
Becomes part of PMP, aligned Quality Planning
to BC and standards, specs,
, regulations etc. Plan must be
quantifiable and
measurable-Sponsor must
agree to plan. What ACs will
validate output is met
5Ws and 2Hs methods, PQMP contents
pass/fail criteria, frequency of
checks, who will complete
audits and checks, what will
be checked, R&R
Overlap between control, Quality Management
plans and deliverables. In
iterative, ACs done per sprint.
In linear, ACs follow CDDT.
Testing the PRODUCT Quality Control
conforms. Measurments,
inspections, finding problems
and fixing. Plan should include
sample size, tolerances,
witnesses. Pass or Fail only.
Can be completed internally.
Done once product available.
Testing the PROCESS Quality Assurance
conforms. Looks at processes
and procedures. Any
nom-conformance must be
addresses and actioned. Must
be done independently, can be
partial or full. Done
throughout.
with Verified Solutions | Latest Updated
2026
The BC documents options, BC + Options Prioritisation
including a do nothing. Need
clarity about the problem and
options. Consider the lifecycle,
SH pressure, ACs, end users,
objectives and requirements
Technical, social, Defining Options
procurement, management,
transition
Options can be explored for Iterative solution development
longer, must haves are
delivered incrementally to
make the MVP, gain
progressive feedback from
user, develop into MMP and
beyond
Options analysis done very Linear solution development
early, preferred solution is
agreed with scope,
requirements then agreed
amd undergo change control
Becomes part of PMP, aligned Quality Planning
to BC and standards, specs,
, regulations etc. Plan must be
quantifiable and
measurable-Sponsor must
agree to plan. What ACs will
validate output is met
5Ws and 2Hs methods, PQMP contents
pass/fail criteria, frequency of
checks, who will complete
audits and checks, what will
be checked, R&R
Overlap between control, Quality Management
plans and deliverables. In
iterative, ACs done per sprint.
In linear, ACs follow CDDT.
Testing the PRODUCT Quality Control
conforms. Measurments,
inspections, finding problems
and fixing. Plan should include
sample size, tolerances,
witnesses. Pass or Fail only.
Can be completed internally.
Done once product available.
Testing the PROCESS Quality Assurance
conforms. Looks at processes
and procedures. Any
nom-conformance must be
addresses and actioned. Must
be done independently, can be
partial or full. Done
throughout.