Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 12 páginas
Examen

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12)

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12)

Vista previa del contenido

ACI Certification- Concrete Field
Testing Technician Grade 1 CP-1 (12)

ASTM C1064 - ANS-Standard Test Method For Temperature of Freshly Mixed
Hydraulic-Cement Concrete

The sensor of the temperature measuring device shall be submerged a minimum of
______ inches into the freshly mixed concrete. - ANS-3"

The temperature measuring device shall have a capacity of measuring temperature of
freshly mixed concrete to ± ______ °F throughout a range of ____________. - ANS-1
degree, 30 degrees to 120 degrees

The temperature measuring device shall be calibrated ______ , or whenever there is a
question of ______ . - ANS-Annually, accuracy

The temperature of concrete may be measured in a wheelbarrow. True or False? -
ANS-True

The temperature of concrete may be measured in a wall form. True or False? - ANS-
True

What must be done to the sample container prior to sampling the concrete? - ANS-
Dampen with water

What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in the fresh concrete? - ANS-Close off air voids by gently
pressing the concrete around the device

How long must the temperature measuring device remain in the freshly mixed concrete?
- ANS-minimum of two minutes, maximum of five minutes

The temperature of the concrete is reported to the nearest ______ °F - ANS-1 degree

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or
False? - ANS-False

ASTM C172 - ANS-Standard Practice for Sampling Freshly Mixed Concrete

Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - ANS-Compliance

, This method covers sampling from four types of mixers, which are _____ , _____ ,
_____ , and _____ . - ANS-Stationary mixers, paving mixers, revolving drum mixers and
open top mixers

The maximum allowable time between obtaining the first and final portions of a
composite sample is _____ minutes. - ANS-15

Portions of a composite sample shall be thoroughly remixed before beginning tests on
the sample. True or False? - ANS-True

The maximum elapsed time allowed between obtaining the final portion of the
composite sample and beginning the tests for slump, temperature, and air content is
_____ minutes. - ANS-5

The molding of strength test specimens shall begin within _____ minutes after
fabricating the composite
sample. - ANS-15


If rodding is the method of consolidation being used, the measure must be filled in how
many layers? - ANS-3

For a measure of 0.5 ft3 [14 L], what is the required number of strokes of the tamping
rod for consolidation
of each layer? - ANS-25

When rodding the middle and the top layers, the tamping rod should penetrate into the
layer below approximately _____. - ANS-1 in. [25 mm]

If vibration is the method of consolidation, the measure must be filled in _____
approximately equal layers. - ANS-2

If, after consolidation of the final layer, the concrete level is 1/2 in. (13 mm) above the
top of the measure, what should be done? - ANS-Remove a representative portion of
the excess concrete with a trowel or scoop

After consolidation of the final layer, an excess of concrete _____ above the top of the
measure is considered optimum. - ANS-⅛ in. [3 mm]

After completing the strike-off procedure, what must be done before weighing the
measure and sample? - ANS-Clean off any excess concrete

Density (Unit Weight) Calculation
Known: Volume of measure = 0.504 ft3 [14.27 L or 0.01427 m3]
Mass of empty measure = 19.6 lb [8.89 kg]

Información del documento

Subido en
21 de junio de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
2
Seguidores
1
Artículos
855
Última venta
3 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes