MGT 227 EXAM 2 STUDY GUIDE

Vista previa del contenido

MGT 227 EXAM 2 STUDY GUIDE


lead time - Answers - the time needed to respond to a customer order

make to stock - Answers - a production environment where the customer is served "on-
demand" from finished goods inventory.

make-to-order - Answers - a production environment where the product is built directly
from raw materials and components in response to a specific customer order.

assemble to order - Answers - a production environment where preassembled
components, subassemblies, and modules are put together in response to a specific
customer order.

engineer to order - Answers - the firm works with the customer to design the product,
which is then made from purchased material, parts, and components.

project center - Answers - a location where project-related resources and information
are centralized. This can include project plans, timelines, budgets, and other project-
related documents and materials.

customer order decoupling point - Answers - where inventory is positioned in the supply
chain

work center - Answers - often referred to as a job shop, a process structure suited for
low-volume production of a great variety of nonstandard products. Sometimes referred
to as departments and are focused on a particular type of operation.

manufacturing cell - Answers - groups dissimilar machines to work on products that
have similar shapes and processing requirements.

assembly line - Answers - a setup in which an item is produced through a fixed
sequence of workstations, designed to achieve a specific production rate.

continuous process - Answers - a process that converts raw materials into finished
product in one continuous process.

service triangle - Answers - the customer is the center of the service strategy, the
support systems, and the employees who serve him/her.

service package - Answers - a bundle of goods and services that is provided in some
environment

, service guarantee - Answers - a promise of service satisfaction backed up by a set of
actions that must be taken to fulfill the promise.

3 service designs - Answers - Production Line - pioneered by McDonald's, treats the
delivery of fast food as a manufacturing process rather than a service process, the
orientation is toward the efficient and quick production of the food.

Self Service - can be enhanced by having the customer take a greater role in the
production of the service, it puts customers in control.

Personal Attention - relies on developing a relationship between the individual
salesperson and the customer or virtually scripted and keeps track of the guest's
personal preferences.

buffering - Answers - a storage area between stages where the output of a stage is
placed prior to being used in a downstream stage.

blocking - Answers - the activities in the stage must stop because there is no place to
deposit the item just completed.

starving - Answers - the activities in a stage must stop because there is no work.

bottleneck - Answers - a resource that limits the capacity or maximum output of the
process.

Little's Law - Answers - states a mathematical relationship between throughput rate,
flow time, and the amount of work-in process inventory, can be used to analyze simple
systems.

cycle time - Answers - the elapsed time between starting and completing a job.

throughput - Answers - the output that the process is expected to produce over a period
of time.

six sigma - Answers - a statistical term to describe the quality goal of no more than 3.4
defects out of every million units. Also refers to a quality improvement philosophy and
program.

Defects per million opportunities (DPMO) - Answers - a metric used to describe the
variability of a process (includes number of defects, number of opportunities, and
number of units)

fishbone diagram - Answers - used to structure or map the key problems to be
investigated and provide a working initial hypothesis as to the likely solution to these
problems.

Información del documento

Subido en
16 de junio de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Otro
Personaje
Desconocido
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUEENSEXAMS
4.1
(61)
Vendido
230
Seguidores
180
Artículos
4957
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes