DBIA TEST QUESTIONS WITH CORRECT
ANSWERS



Project Delivery System - ans- xc xc xc xc




How team members are organized, establishes when parties engage, determines roles of
xc xc xc xc xc xc xc xc xc xc xc xc




parties, and determines sequence of design, procurement, and construction (db, cmar, dbb
xc xc xc xc xc xc xc xc xc xc xc




)

Procurement Method - ans- xc xc xc




how team members are selected (QBS, best value, low price, sole source)
xc xc xc xc xc xc xc xc xc xc xc




contracting approach - ans- xc xc xc




how team members are paid (fp, gmp, cost reimbursement, target price, unit price)
xc xc xc xc xc xc xc xc xc xc xc xc




Design-Bid-Build (DBB) - ans- xc xc xc




linear, sequential process, A/
xc xc xc




E selected on qualifications, GC selected on low price, design is fully completed without inp
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




ut from GC, A/E acting in owner's interests, with a historically strong bond, process is well-
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




established and understood xc xc




construction manager at risk - ans- xc xc xc xc xc




similar org structure to DBB, construction manager selected by QBS or best value, contract
xc xc xc xc xc xc xc xc xc xc xc xc xc




or provides precon services, negotiated gmp contracting approach, open book estimating p
xc xc xc xc xc xc xc xc xc xc xc




rocess, potential to fast track project, construction cost determined before design complete
xc xc xc xc xc xc xc xc xc xc xc




d, potential issues over what is reasonably inferable from gmp design documents
xc xc xc xc xc xc xc xc xc xc xc




Design-Build - ans- xc xc




The owner contracts with one entity (a person or firm) to provide both design and constructi
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




on services, designer and contractor have a direct contractual relationship, selected by QB
xc xc xc xc xc xc xc xc xc xc xc xc




S or best value, wide spectrum of contracting approaches and organizational structures, si
xc xc xc xc xc xc xc xc xc xc xc xc




ngle point responsibility, owner does not manage designer, owner exposure to claims is sig
xc xc xc xc xc xc xc xc xc xc xc xc xc




nificantly reduced xc




engineer procure construct (epc) - ans- xc xc xc xc xc




similar to design build, in industrial and power generation sectors, systems and performanc
xc xc xc xc xc xc xc xc xc xc xc xc




e testing are central to scope, contractor will typically perform engineering with its in-
xc xc xc xc xc xc xc xc xc xc xc xc xc




house staff, owner has need for single point responsibility, contracts include plant and proc
xc xc xc xc xc xc xc xc xc xc xc xc xc




ess performance guarantees, contract items include performance and schedule liquidated
xc xc xc xc xc xc xc xc xc xc




damages and limitations of liability xc xc xc xc

, Multiple Prime Contracting - ans- xc xc xc xc




owner contracts with multiple trade contractors, attributes are typically similar to dbb, owne
xc xc xc xc xc xc xc xc xc xc xc xc




r's ability to schedule and coordinate the work
xc xc xc xc xc xc xc




Integrated Project Delivery (IPD) - ans-multi-party agreement - xc xc xc xc xc xc xc




all parties equal, QBS procurement and target pricing contract approach, private sector us
xc xc xc xc xc xc xc xc xc xc xc xc xc




e (limited at this time), key: owner's ability to accept risk
xc xc xc xc xc xc xc xc xc xc




public-private partnership (p3) - ans- xc xc xc xc




Instead of government building and maintaining major infrastructure (such as highway, wat
xc xc xc xc xc xc xc xc xc xc xc




er treatment plant), build and maintenance is outsourced to a private company. Opposed b
xc xc xc xc xc xc xc xc xc xc xc xc xc




y public sector unions. this is not considered a delivery system but its underlying approache
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




s are delivery systems and typically use DB. multiple procurement and contracting approac
xc xc xc xc xc xc xc xc xc xc xc xc




hes

shift left - ans- xc xc xc




intense efforts to establish scope early in the process; drives early team formation to includ
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




e key trade subcontractors; can enable big decisions to be made early, affect project outco
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




mes at lowest cost, establish a need for co-
xc xc xc xc xc xc xc xc




location and collaboration, and compress time during concurrent design and construction
xc xc xc xc xc xc xc xc xc xc




traditional design build - ans-typically two- xc xc xc xc xc




phase best value procurement with lump sum contract; owner defines project requirements
xc xc xc xc xc xc xc xc xc xc xc




and scope of prescriptive work; use of performance-
xc xc xc xc xc xc xc xc




based technical requirements with limited prescriptive specifications
xc xc xc xc xc xc




progressive design build - ans- xc xc xc xc




design and price are progressively developed after the design-
xc xc xc xc xc xc xc xc




builder is under contract; final project cost and schedule commitment is not established as
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




part of the selection process; two phases: preliminary services and final design and constru
xc xc xc xc xc xc xc xc xc xc xc xc xc




ction services xc




criteria documents - ans-describe the end result xc xc xc xc xc xc




bridging documents - ans-prescribes how to achieve the end result
xc xc xc xc xc xc xc xc xc




design bid build paradigm - ans- xc xc xc xc xc




prior to bidding, owner undertakes a process to design the project and all of its details to 100
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




% complete plans and specs. the owner is therefore responsible for success or failure of det
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




ails of the design, and warrants the sufficiency of design to the contractor. the owner is ther
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc




efore liable to the contractor for any gaps between plans and specifications and owner's req
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




uirements for project performance xc xc xc




design details responsibility - ans- xc xc xc xc




the owner should define its performance requirements and award the contract on the basis
xc xc xc xc xc xc xc xc xc xc xc xc xc xc




of preliminary design; this makes the design-
xc xc xc xc xc xc

Escuela, estudio y materia

Institución
DBIA Practice
Grado
DBIA Practice

Información del documento

Subido en
13 de junio de 2026
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DeligentSuccess Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18
Miembro desde
10 meses
Número de seguidores
1
Documentos
1022
Última venta
2 semanas hace
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes