Examen

Isa Utility Specialist Updated Final Exam Questions And Answers Sure

Document preview thumbnail
Vista previa 4 fuera de 34 páginas

ISA UTILITY SPECIALIST UPDATED FINAL EXAM QUESTIONS AND ANSWERS SURE

Vista previa del contenido

ISA UTILITY SPECIALIST UPDATED FINAL EXAM
QUESTIONS AND ANSWERS SURE A+
✔✔The __________-__________ rule suggests that workers should take time before
starting a job to check for potentially unsafe conditions & discuss them. - ✔✔two-minute

✔✔According to ANSI Z133, the minimum approach distance for persons other than
qualified line-clearance arborists for 50 kV & less is __________. - ✔✔10 feet

✔✔Trees growing into contact with a single-phase distribution conductor pose
__________ threat of a tree-ground fault. - ✔✔little

✔✔Where should the final cut be made for proper utility pruning? - ✔✔just outside of
the branch bark ridge and the branch collar

✔✔A vegetation management scheduling unit may be an entire __________ or a
__________ __________. - ✔✔circuit;
geographical area

✔✔2 examples of protective equipment: - ✔✔circuit breakers
lightning receptors

,✔✔On a storm site, cutting should not begin until all risks have been assessed & the
__________ approach has been decided & adopted. - ✔✔safest

✔✔Actively __________ can facilitate understanding a customer's perceptions and
demonstrate the utility representative's sincere interest in a customer. - ✔✔listening

✔✔As clearance work progresses, __________ between crews & dispatcher is critically
important to determine locations of downed or damaged lines. - ✔✔communication

✔✔__________ negotiation uses the best aspects from both hard & soft bargaining. -
✔✔interest-based

✔✔An energized wire or conductor in a circuit is also known as a __________. -
✔✔phase

✔✔Fast-growing, problem species are sometimes known as __________ __________.
- ✔✔cycle busters

✔✔Flush cuts damage which tissues? - ✔✔the trunk

✔✔Clearing for a new distribution line is likely to be paid for by a __________ budget. -
✔✔capital

✔✔Surface temperatures at the point of contact with high voltage can reach
__________ degrees F. - ✔✔1,000

✔✔__________ __________ occurs when someone touches an energized fixture.
__________ __________ can occur when a person touches a conductive object that is
in contact with an energized fixture. - ✔✔direct contact;
indirect contact

✔✔A grid-based scheduling system is most likely to be used by highly __________
utilities. - ✔✔urbanized

✔✔Why is utility pruning done? - ✔✔to maintain safety and rights-of-way

✔✔Reactive maintenance is often called __________. - ✔✔hotspotting

✔✔True or False?
Guy wires are intended to help support poles but may become unintentionally
energized. - ✔✔true

,✔✔One of the highest personal risks in a storm is __________. - ✔✔fatigue

✔✔When trying to negotiate mutually agreeable solutions & gain commitment based on
customer interests, the focus should be on __________, no on specific individuals. -
✔✔issues

✔✔A __________ is similar to a fuse or cutout, but it resets after a predetermined time
period. - ✔✔re-closer

✔✔Always consider that all lines are __________. - ✔✔energized

✔✔Tree replacement programs are an important aspect of many utility customer
relations programs & focus on selecting: - ✔✔the right tree for the right place

✔✔If a structurally weak tree were on or close to the utility right-of-way, __________
__________ & __________ would be considered targets. - ✔✔utility lines & equipment

✔✔A challenge with grid-based scheduling is that circuits may traverse many grids,
allowing for a variety of __________ __________. - ✔✔tree conditions

✔✔The difference in voltage between two objects someone simultaneously touches: -
✔✔touch potential

✔✔Which type of pruning encourages the growth of branches away from the wires? -
✔✔directional pruning

✔✔Minimum working distances for qualified line-clearance arborists are specified in the
__________ safety standard. - ✔✔ANSI Z133

✔✔The sound of a running home generator should alert crews to the possibility of
__________. - ✔✔backfeed

✔✔Measuring customer satisfaction by the number of __________ received is a very
reactive approach to customer relations. - ✔✔complaints

✔✔Ideally, TGRs should be applied when a tree is actively growing & __________-
__________ months before pruning takes place. - ✔✔2-3

✔✔What is the maximum amount of foliage that should be removed in one growing
season? - ✔✔25%
(this is according to ANSI A300)

, ✔✔The most expensive way to schedule work is: - ✔✔hotspotting

✔✔__________ __________ is the difference in voltage on the ground between two of
a person's body parts near where electricity goes into the ground. - ✔✔step potential

✔✔A energized human body, tree, or climbing rope are all examples or __________
contact - ✔✔indirect

✔✔A contractor is paid for each tree pruned or removed when contracted using a
__________ __________ contract. - ✔✔unit price

✔✔When is it acceptable to deviate from the pruning standards? - ✔✔during storm
restoration

✔✔Besides pruning, __________ & __________ treatments are often part of an
integrated vegetation management program. - ✔✔mechanical & herbicide

✔✔When installing underground conductors, __________ should be used in tree root
protection zones. - ✔✔tunneling

✔✔Crew members should always refer customer relations questions about the status of
power restoration to: - ✔✔the utility

✔✔The __________ has been adopted by most states & regulatory bodies throughout
the U.S. as the recognized document providing safety provisions for those working with
or near electric supply equipment. - ✔✔NESC
(National Electrical Safety Code)

✔✔Customer relations are important during a storm response, but are necessarily a
lower priority than: - ✔✔safety & power restoration

✔✔Because most electrical lines are located on private property, utilities typically
secure __________ to facilitate maintenance of their lines. - ✔✔easements

✔✔The safety acronym S.T.A.R. is valuable for preventing errors, & stands for: -
✔✔Stop, Think, Act, Review

✔✔Distribution transformers typically __________ primary circuit voltage for the end
user. - ✔✔reduce

✔✔Vegetation can be chemically controlled in a selective manner with either a selective
__________, or a selective __________. - ✔✔herbicide;

Información del documento

Subido en
9 de junio de 2026
Número de páginas
34
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$20.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALKer
3.4
(20)
Vendido
164
Seguidores
6
Artículos
26749
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes