⩥ Plan used to indicate how a building is situated to other
buildings and streets
Answer: Plot Plan
⩥ Minimum width for a stairwell regular and less than 50 people
Answer: Regular minimum width 44" <50 people is 36"
⩥ Responsibilities of the inspector
Answer: To conduct inspections of construction, alterations,
repair, remodeling or demolition of structures and the
installation of building systems
⩥ Responsibilities of the Contractor
Answer: The Contractor shall be responsible for the level of
quality, timely completion and coordination of all services
rendered by the Contractor, and shall, without additional
compensation, promptly remedy and correct any errors,
omissions or other deficiencies.
,⩥ Lumber piles shall not exceed what height and base
Answer: 15 feet high, 100x200 feet base
⩥ Type of sprinkler that is concealed and installed pendant with
the base flush with the ceiling
Answer: flush mounted sprinkler
⩥ What type of sprinkler is best for a large warehouse?
Answer: Quell sprinkler, extended coverage, or early
suppression fast response
⩥ Code
Answer: Body of regulations arranged systematically usually
pertaining to one subject such as mechanical, building, electrical
and fire code given statutory force
⩥ Standard
Answer: Set of published criteria that is developed to serve as a
model or example of desired performance or behaviors and that
contain requirements and specifications outlining minimum
levels of performance, protection, or construction
, ⩥ Model codes are revised how often
Answer: Every 3-5 years
⩥ The process for developing or amending local codes (5)
Answer: Identify the: Problem, Identify the stakeholders, form a
code development taskforce, draft the proposed code, submit the
code for legal review
⩥ Permit Process steps 4
Answer: Obtain application, Inspector reviews the application,
Inspector issues the permit, permit enforced until expiration
⩥ Records should be maintained for the lifetime of a building,
retention of records for a demolished building should be
Answer: 5 years after demolition
⩥ Emergency evacuation drills
Answer: most occupancies shall conduct at least two drills per
year
PREP ACTUAL TEST WITH VERIFIED
SOLUTIONS 100 PERCENT CORRECT
⩥ Plan used to indicate how a building is situated to other
buildings and streets
Answer: Plot Plan
⩥ Minimum width for a stairwell regular and less than 50 people
Answer: Regular minimum width 44" <50 people is 36"
⩥ Responsibilities of the inspector
Answer: To conduct inspections of construction, alterations,
repair, remodeling or demolition of structures and the
installation of building systems
⩥ Responsibilities of the Contractor
Answer: The Contractor shall be responsible for the level of
quality, timely completion and coordination of all services
rendered by the Contractor, and shall, without additional
compensation, promptly remedy and correct any errors,
omissions or other deficiencies.
,⩥ Lumber piles shall not exceed what height and base
Answer: 15 feet high, 100x200 feet base
⩥ Type of sprinkler that is concealed and installed pendant with
the base flush with the ceiling
Answer: flush mounted sprinkler
⩥ What type of sprinkler is best for a large warehouse?
Answer: Quell sprinkler, extended coverage, or early
suppression fast response
⩥ Code
Answer: Body of regulations arranged systematically usually
pertaining to one subject such as mechanical, building, electrical
and fire code given statutory force
⩥ Standard
Answer: Set of published criteria that is developed to serve as a
model or example of desired performance or behaviors and that
contain requirements and specifications outlining minimum
levels of performance, protection, or construction
, ⩥ Model codes are revised how often
Answer: Every 3-5 years
⩥ The process for developing or amending local codes (5)
Answer: Identify the: Problem, Identify the stakeholders, form a
code development taskforce, draft the proposed code, submit the
code for legal review
⩥ Permit Process steps 4
Answer: Obtain application, Inspector reviews the application,
Inspector issues the permit, permit enforced until expiration
⩥ Records should be maintained for the lifetime of a building,
retention of records for a demolished building should be
Answer: 5 years after demolition
⩥ Emergency evacuation drills
Answer: most occupancies shall conduct at least two drills per
year