100’s ESWS – Common Core Study Guide & Qualification Prep
Discuss the concept of ORM - ANS ✔✔Operation risk management. (ORM)
-decision making tool used by personnel at all levels to increase effectiveness by identifying,
assessing, and managing risks. By reducing the potential for loss, the probability of a successful
mission is increased
-Increases Navy's ability to make informed decisions by providing a standardized ORM process
-Minimizes risks to acceptable levels, commensurate with mission accomplishment. the amount
of risk the navy may accept in war is much greater then what the navy may accept in peace, but
the process is the same. Correct application of the ORM process will reduce losses and
associated costs resulting in more efficient use of resources.
-Applies to off-duty activities due to their own diverse set of hazards and risks. ORM must be
practiced 24 hours a day, 7 days a week, and 365 days a year.
what are the three levels of ORM? - ANS ✔✔In-Depth, Deliberate, and Time Critical
what is In-Depth in ORM? - ANS ✔✔refers to situations when time is not a limiting factor and
the "right" answer is required for a successful mission or task. thorough research and analysis of
available data, use of diagrams and analysis tools, and formal testing or long-term tracking of
associated hazards are some of the tools used at this level. other examples of application of
ORM at the in-depth level include, but are not limited to: long term planning of complex or
contingency operations; technical standards and system hazard management applied in
engineering design during acquisition and introduction of new equipment and system;
development of tactics and training curricula; and major system overhaul or repair.
what is Deliberate in ORM? - ANS ✔✔refers to situations when there is ample time to apply the
ORM process to the detailed planning to obtain the "best" answer required of a mission or task.
At this level, the planning primarily uses experienced personnel and brainstorming and is most
,effective when done in a group. The navy planning process is a good example of ORM
application integrated at this level. Other examples include: planning of unit missions, task, or
events; review SOPs maintenance or training procedures; recreational activities; and the
development of damage control and emergency response plans.
what is Time Critical in ORM? - ANS ✔✔this is the level at which personnel operate on a daily
both on and off duty. the time critical level is best described as being at the point of
commencing or during execution of a mission or task. At this level there is little or no time to
make a plan. AN on-the-run mental or verbal assessment of the new, changed, or changing
situation is the best one can do. Time is limited in this situation, so the application of the five-
step process has proven impractical and ineffective. The navy has adopted the ABCD model to
facilitate use of ORM at the time critical level.
what are the four principles of ORM? - ANS ✔✔1. Accept risk when benefits outweigh the cost
2. Accept no unnecessary risk
3. Anticipate and manage risk by planning
4. Make risk decisions at the right level
Accept risk when benefits outweigh the cost - ANS ✔✔The process of weighing risks against the
benefits and value of the mission or task helps to maximize success. Balancing costs and
benefits is a subjective process. therefore, personnel with knowledge and experience of the
mission or task must be engaged when making risk decisions.
Accept no unnecessary risk - ANS ✔✔if all detectable hazards have not been identified, then
unnecessary risks are being accepted. Additionally an unnecessary risk is one of that, if taken,
will not contribute to the task or Mission accomplishment or will needlessly jeopardize
Personnel or material. The ORM process identifies hazards that might otherwise go unidentified
and provides tools to reduce or offset risk. The acceptance of risk does not equate to the
imprudent willingness to gamble. Take only risks that are necessary to accomplish the mission
or task.
,Anticipate and manage risk by planning - ANS ✔✔Integrating risk management into planning at
all levels, and as early as possible provides the greatest opportunity to make well-informed
decisions and Implement effective risk controls. This enhances the overall effectiveness of ORM
and often reduces costs. Thorough planning identifies associated hazards and the steps
necessary to complete the task or mission.
Make risk decisions at the right level - ANS ✔✔Anyone can make a risk decision. However, the
appropriate level for risk decisions is the person who can make decisions to eliminate or
minimize the Lazard, implement controls to reduce the risk, or accept and when to elevate the
decision to a higher level. Ensuring that risk decisions are made at the appropriate level will
establish clear accountability. Therefore, those accountable for the mission must be included in
the ORM process. If the commander, leader, or individual responsible for executing the mission
or task determines that the controls available to them will not reduce risk to an acceptable
level, they must elevate the risk decisions to the level in the chain of command.
Steps of the ORM Process - ANS ✔✔-Identify hazards- a hazard is any condition with the
potential to negatively impact mission accomplishment or cause injury, death, or property
damage. Hazard identification is the foundation of the entire RM process. If a hazard is not
identified, it cannot be controlled. the effort expended in identifying hazards will have a
multiplier effect. Therefore, this step should be allotted a larger portion of the available time.
-Assess hazards- for each hazard identified, determine the associated degree of risk in terms of
probability and severity. the result of the risk assessment is a prioritized list of hazards, which
ensures that controls are first identified for the most serious threat to mission or task
accomplishment. The hazard list is intended for use a guide to the relative priority of risks
involved and not as an absolute order to follow.
-Make risk decisions- There are three basic actions which ultimately lead to making informed
risk decisions: identifying control options; determining the effect of there controls on the hazard
or risk; and, ultimately deciding how to proceed.
-Implement controls- once the risk control decisions are made, the next step is implementation.
This requires that the plan is clearly communicated to all the involved personnel, accountability
, is established, and necessary support os provided. careful documentation of each step in the
RM process facilitates risk communication and the rational processes behind the RM decisions.
-Supervise- involves determining the effectiveness of risk controls throughout the mission or
task. This involves three actions: monitoring the effectiveness of risk controls; determining the
need for further assessment of all or a portion of the mission or task due to an unanticipated
change; and capturing lessons learned, both positive and negative.
Discuss Plan, Brief, Execute, Debrief (PBED) to support the ORM process - ANS ✔✔1. enhance
mission or task accomplishment by increasing the probability of success.
2. minimize risk to acceptable levels commensurate with the benefit or value of mission or tsk
accomplishment, while providing a method to effectively manage resources.
3. enhance decision-making skills based on a systematic, reasoned, and repeatable process.
4. provide a systematic structure to perform risk assessments
5. provide improved confidence for individuals to make informed risk decisions (adequate risk
analysis provides a clearer picture of the hazards and of unit capabilities)
6. preserve personnel and materiel by avoiding unnecessary risk, thus reducing mishaps and the
associated costs
7.provide an adaptive process for continuous feedback through the planning, preparation, and
execution phases of any evolution.
8. identify feasible and effective control measures, particularly where specific standards do not
exist.
Discuss the concept of ORM - ANS ✔✔Operation risk management. (ORM)
-decision making tool used by personnel at all levels to increase effectiveness by identifying,
assessing, and managing risks. By reducing the potential for loss, the probability of a successful
mission is increased
-Increases Navy's ability to make informed decisions by providing a standardized ORM process
-Minimizes risks to acceptable levels, commensurate with mission accomplishment. the amount
of risk the navy may accept in war is much greater then what the navy may accept in peace, but
the process is the same. Correct application of the ORM process will reduce losses and
associated costs resulting in more efficient use of resources.
-Applies to off-duty activities due to their own diverse set of hazards and risks. ORM must be
practiced 24 hours a day, 7 days a week, and 365 days a year.
what are the three levels of ORM? - ANS ✔✔In-Depth, Deliberate, and Time Critical
what is In-Depth in ORM? - ANS ✔✔refers to situations when time is not a limiting factor and
the "right" answer is required for a successful mission or task. thorough research and analysis of
available data, use of diagrams and analysis tools, and formal testing or long-term tracking of
associated hazards are some of the tools used at this level. other examples of application of
ORM at the in-depth level include, but are not limited to: long term planning of complex or
contingency operations; technical standards and system hazard management applied in
engineering design during acquisition and introduction of new equipment and system;
development of tactics and training curricula; and major system overhaul or repair.
what is Deliberate in ORM? - ANS ✔✔refers to situations when there is ample time to apply the
ORM process to the detailed planning to obtain the "best" answer required of a mission or task.
At this level, the planning primarily uses experienced personnel and brainstorming and is most
,effective when done in a group. The navy planning process is a good example of ORM
application integrated at this level. Other examples include: planning of unit missions, task, or
events; review SOPs maintenance or training procedures; recreational activities; and the
development of damage control and emergency response plans.
what is Time Critical in ORM? - ANS ✔✔this is the level at which personnel operate on a daily
both on and off duty. the time critical level is best described as being at the point of
commencing or during execution of a mission or task. At this level there is little or no time to
make a plan. AN on-the-run mental or verbal assessment of the new, changed, or changing
situation is the best one can do. Time is limited in this situation, so the application of the five-
step process has proven impractical and ineffective. The navy has adopted the ABCD model to
facilitate use of ORM at the time critical level.
what are the four principles of ORM? - ANS ✔✔1. Accept risk when benefits outweigh the cost
2. Accept no unnecessary risk
3. Anticipate and manage risk by planning
4. Make risk decisions at the right level
Accept risk when benefits outweigh the cost - ANS ✔✔The process of weighing risks against the
benefits and value of the mission or task helps to maximize success. Balancing costs and
benefits is a subjective process. therefore, personnel with knowledge and experience of the
mission or task must be engaged when making risk decisions.
Accept no unnecessary risk - ANS ✔✔if all detectable hazards have not been identified, then
unnecessary risks are being accepted. Additionally an unnecessary risk is one of that, if taken,
will not contribute to the task or Mission accomplishment or will needlessly jeopardize
Personnel or material. The ORM process identifies hazards that might otherwise go unidentified
and provides tools to reduce or offset risk. The acceptance of risk does not equate to the
imprudent willingness to gamble. Take only risks that are necessary to accomplish the mission
or task.
,Anticipate and manage risk by planning - ANS ✔✔Integrating risk management into planning at
all levels, and as early as possible provides the greatest opportunity to make well-informed
decisions and Implement effective risk controls. This enhances the overall effectiveness of ORM
and often reduces costs. Thorough planning identifies associated hazards and the steps
necessary to complete the task or mission.
Make risk decisions at the right level - ANS ✔✔Anyone can make a risk decision. However, the
appropriate level for risk decisions is the person who can make decisions to eliminate or
minimize the Lazard, implement controls to reduce the risk, or accept and when to elevate the
decision to a higher level. Ensuring that risk decisions are made at the appropriate level will
establish clear accountability. Therefore, those accountable for the mission must be included in
the ORM process. If the commander, leader, or individual responsible for executing the mission
or task determines that the controls available to them will not reduce risk to an acceptable
level, they must elevate the risk decisions to the level in the chain of command.
Steps of the ORM Process - ANS ✔✔-Identify hazards- a hazard is any condition with the
potential to negatively impact mission accomplishment or cause injury, death, or property
damage. Hazard identification is the foundation of the entire RM process. If a hazard is not
identified, it cannot be controlled. the effort expended in identifying hazards will have a
multiplier effect. Therefore, this step should be allotted a larger portion of the available time.
-Assess hazards- for each hazard identified, determine the associated degree of risk in terms of
probability and severity. the result of the risk assessment is a prioritized list of hazards, which
ensures that controls are first identified for the most serious threat to mission or task
accomplishment. The hazard list is intended for use a guide to the relative priority of risks
involved and not as an absolute order to follow.
-Make risk decisions- There are three basic actions which ultimately lead to making informed
risk decisions: identifying control options; determining the effect of there controls on the hazard
or risk; and, ultimately deciding how to proceed.
-Implement controls- once the risk control decisions are made, the next step is implementation.
This requires that the plan is clearly communicated to all the involved personnel, accountability
, is established, and necessary support os provided. careful documentation of each step in the
RM process facilitates risk communication and the rational processes behind the RM decisions.
-Supervise- involves determining the effectiveness of risk controls throughout the mission or
task. This involves three actions: monitoring the effectiveness of risk controls; determining the
need for further assessment of all or a portion of the mission or task due to an unanticipated
change; and capturing lessons learned, both positive and negative.
Discuss Plan, Brief, Execute, Debrief (PBED) to support the ORM process - ANS ✔✔1. enhance
mission or task accomplishment by increasing the probability of success.
2. minimize risk to acceptable levels commensurate with the benefit or value of mission or tsk
accomplishment, while providing a method to effectively manage resources.
3. enhance decision-making skills based on a systematic, reasoned, and repeatable process.
4. provide a systematic structure to perform risk assessments
5. provide improved confidence for individuals to make informed risk decisions (adequate risk
analysis provides a clearer picture of the hazards and of unit capabilities)
6. preserve personnel and materiel by avoiding unnecessary risk, thus reducing mishaps and the
associated costs
7.provide an adaptive process for continuous feedback through the planning, preparation, and
execution phases of any evolution.
8. identify feasible and effective control measures, particularly where specific standards do not
exist.