Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

CPESC ACTUAL EXAM | COMPLETE QUESTIONS WITH EXPERT SOLUTIONS | 2026 LATEST UPDATED | GET A+

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

CPESC ACTUAL EXAM | COMPLETE QUESTIONS WITH EXPERT SOLUTIONS | 2026 LATEST UPDATED | GET A+

Vista previa del contenido

CPESC ACTUAL EXAM | COMPLETE QUESTIONS WITH EXPERT

SOLUTIONS | 2026 LATEST UPDATED | GET A+

What are the 5 factors that influence erosion? - (answer)Soil erodibility, topography, vegetative
cover, season, climate (rainfall)


What influences soil erodibility? - (answer)Soil texture, structure and % of OM


How does vegetative cover influence erodibility? - (answer)Top growth reduces raindrop impact,
filters sediment and slows down runoff velocity; roots hold mass particles together


How can you decrease erodibility in relation to topography? - (answer)Increase slope roughness


What climate characteristics affect erodibility? - (answer)Rainfall intensity, duration and
frequency


Why does frequent rainfall increase erodibility? - (answer)The soil becomes saturated and no
more water can infiltrate which increases runoff volume


Why is erosion potential high in the spring if it rains? - (answer)Water can't infiltrate the frozen
subsoil which increases runoff volume


What are some ways urban development impacts erosion hazards? - (answer)Changes hydrology
(GW flow, drainage), disturbs large amounts of soil, removes plant cover


BMP considerations for clearing and grubbing? - (answer)Preserve existing vegetation; clear
only what is required for immediate construction activity


BMP considerations for mass grading? - (answer)Create principle basins, traps, barriers,
diversions and channels; temporary stabilization; manage concentrated runon and runoff (water
bars)

, BMP considerations for site access & off-hauling? - (answer)Stabilize with gravel and temporary
vegetation; limit ingress and egress points


What are the 3 stages of inlet construction? - (answer)Pipe installation, inlet construction, inlet
backfill


BMP considerations of channel construction? - (answer)Monitor weather, install grade controls,
stabilize streambanks early; consider time of year (weather) to start construction (phasing)


BMP considerations of final stabilization? - (answer)Immediately apply temp or permanent
stabilization of disturbed areas; don't allow surface area to dry out for a few days before seeding
(affects germination)


BMP considerations of vertical construction? - (answer)Protect inlets; modify plan to show new
conditions and updated measures


What would have to be updated as construction progressed on the SWPPP? - (answer)Installation
and removal dates, changes in plan designs, and changes in BMPs


When are outlet protectors used? Examples? - (answer)To control runoff; wattles, check dams
(energy dissipaters) or thick/matted veg, riprap (ground cover)


What is the RUSLE equation? - (answer)A = R K L S C P


What are the units for A in RUSLE? - (answer)Ton/ha/year


What kind of erosion does RUSLE cover? - (answer)Sheet and rill erosion only


Define soil erodibility - (answer)The ease with which soil is detached by splash during rainfall

Información del documento

Subido en
5 de junio de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EXAMEXPERTS
5.0
(429)
Vendido
2074
Seguidores
1
Artículos
431
Última venta
1 semana hace

Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes