If the Maintenance could not be completed as written then the work-center
supervisor will be notified and a reason for not being completed will be put on the....
Give this one a try later!
Reverse side of the 13-week accountability
Corrective Maintenance
Give this one a try later!
, •tasks where the scope of work is determined by obvious failure,
observable degradation, or detected by either an on-line Condition-Based
Maintenance (CBM) diagnostic system or the accomplishment of a material
condition assessment task.
Record of Change Page
Give this one a try later!
Needs to list Force Revisions and FBR's and/or ACN's
Inactive Equipment Maintenance (IEM) Codes: "LU"
Give this one a try later!
Lay-Up
The SYSCOM MIP Control Number is located
Give this one a try later!
at the bottom of each page
Calendar Periodicity Codes: "S"
Give this one a try later!
, Semi-annually
Tag out Audits are done...
Give this one a try later!
Every 2 Weeks
The following information is NOT contained in the 13-week accountability log....
Give this one a try later!
Printed name,
Tag out serial number,
Date for when the Maintenance was complete
Tag-outs will be properly authorized starting and clearing with
Give this one a try later!
Authorizing Officer
13 Week Accountability Log
Give this one a try later!
supervisor will be notified and a reason for not being completed will be put on the....
Give this one a try later!
Reverse side of the 13-week accountability
Corrective Maintenance
Give this one a try later!
, •tasks where the scope of work is determined by obvious failure,
observable degradation, or detected by either an on-line Condition-Based
Maintenance (CBM) diagnostic system or the accomplishment of a material
condition assessment task.
Record of Change Page
Give this one a try later!
Needs to list Force Revisions and FBR's and/or ACN's
Inactive Equipment Maintenance (IEM) Codes: "LU"
Give this one a try later!
Lay-Up
The SYSCOM MIP Control Number is located
Give this one a try later!
at the bottom of each page
Calendar Periodicity Codes: "S"
Give this one a try later!
, Semi-annually
Tag out Audits are done...
Give this one a try later!
Every 2 Weeks
The following information is NOT contained in the 13-week accountability log....
Give this one a try later!
Printed name,
Tag out serial number,
Date for when the Maintenance was complete
Tag-outs will be properly authorized starting and clearing with
Give this one a try later!
Authorizing Officer
13 Week Accountability Log
Give this one a try later!