ASHRAE BCxP Exam Prep questions with answers

Document preview thumbnail
Vista previa 4 fuera de 117 páginas

ASHRAE BCxP Exam Prep questions with answers

Vista previa del contenido

ASHRAE BCxP Exam Prep questions
with answers


The owner's project requirements (OPR) document should
include
equipment and system expectations, energy efficiency
requirements, and operational schedules.




When starting a commissioning project, the FIRST person
added to a project team after an owner's project manager
should be a
commissioning professional.




The owner of several office buildings intends to build a
multi-family residential building. The owner intends to use
current employees, including property managers and
maintenance staff, to operate and maintain the new
building. Which of the following should the commissioning
professional do FIRST?
Determine new facility staff training requirements.

,During the pre-design stage of the construction of a new
surgical hospital, the owner determines that the
commissioning process should include verification of the
medical equipment in the owner's project requirements. A
commissioning professional FIRST should modify the
owner-commissioning professional agreement.




A new elementary school will replace a 60-year-old facility
and will be operated by the same O&M staff. The new
building will be air conditioned with a high-efficiency,
water-cooled chiller and heated with a condensing boiler.
The O&M staff was interviewed and is very proficient with
direct expansion (DX) systems. Which of the following
should the commissioning professional do regarding
systems maintenance?
Suggest that additional training be specified for the new
systems.




An owner of a museum collection has special temperature
and humidity requirements for a new facility in a cold
climate. Temperature setpoint should be maintained
within 2 ⁰F (1.1 ⁰C), and relative humidity should remain
within 2.5% of 42.5%. During the pre-design phase, the
owner's project requirements are developed to include

,these requirements. Which of the following should be
done NEXT?
Confirm that the basis of design includes these
requirements.




For newly constructed buildings, the majority of O&M
personnel training should be scheduled to occur after
performance testing.




During project design, a commissioning professional
realizes that the level of maintenance required by the
proposed building systems exceeds the current training of
operating staff. The commissioning professional should
include training criteria in the contract documents.




A 25,000 ft² (2,300 m²) office building will be constructed
by a contractor who is using the commissioning process
for the first time. What should the project team do prior
to construction?
Conduct construction phase kick-off meeting.

, A test, adjust, and balance (TAB) contractor is scheduled
to balance the air flow to VAV boxes in a wing of a large
airport terminal project. Which of the following is MOST
important for a commissioning professional to do?
Confirm that a TAB plan has been reviewed and
approved.




Which of the following commissioning tasks MUST be
included in a construction schedule?
systems performance testing




During which of the following meetings should the
commissioning requirements FIRST be reviewed with the
contractors to facilitate the commissioning process?
pre-construction




An owner has been under contract with a project team,
and construction is underway. A commissioning
professional is awarded the contract after foundation and
framing of the new construction has begun. Which of the

Información del documento

Subido en
1 de junio de 2026
Número de páginas
117
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$30.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EXAMSTUDYPLUG
4.5
(242)
Vendido
384
Seguidores
108
Artículos
20853
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes