Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CEPSCI PRACTICE TEST Q’s and A’s

Puntuación
-
Vendido
-
Páginas
17
Grado
A+
Subido en
22-05-2026
Escrito en
2025/2026

CEPSCI PRACTICE TEST Q’s and A’s

Institución
CEPSCI
Grado
CEPSCI

Vista previa del contenido

CEPSCI PRACTICE TEST Q’s and A’s
1972 clean water act - ✔◻✔◻Administered by the US environmental protection agency (EPA) Created
the NPDES



1987 - ✔◻✔◻Amendment to CWA CALLED WATER QUALITY ACT



NPDES in south carolina - ✔◻✔◻South Carolina is NPDES delegated state.



NPDES regulations are administered by - ✔◻✔◻SCDHEC



CGP authorizes - ✔◻✔◻stormwater discharges from construction sites



Who must obtain NPDES coverage - ✔◻✔◻land disturbing activities greater than or equal to 1 acre

-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone



NPDES permits are issued to - ✔◻✔◻operator-person or company for a particular discharge



primary permittee - ✔◻✔◻-has day to day operational control to ensure compliance with SWPP

-typically the owner or developer



primary permittee responsibilites - ✔◻✔◻submit NOI, Preparation of the C_SWPPP



Secondary permittee - ✔◻✔◻individual lot owner or residential builder that conducts land disturbing
activity limited to an individual lot or group of lots as part of approved LCP of development

,contractors - ✔◻✔◻must on Contractor Certification- D-0437



On-Site SWPPP - ✔◻✔◻SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications,
Local Approvals, USACE approvals, Critical area permit(coast)



OS_SWPPP - ✔◻✔◻a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC
must be retained at site or electronically accessible



minor modification to ON-SWPPP - ✔◻✔◻minor modifications made directly in the field,do not need
approval by DHEC- additional BMP's, removal of disturbed areas



major modifications to OS-SWPPP - ✔◻✔◻must be made by qualified individual and submitted to
DHEC or appropriate delegated entity for approval



Phased plan requirement > 5 - ✔◻✔◻include a phased stormwater management plan which identifies
all BMP's and grading work conducted during a specific portion of the sites construction sequence. Each
phase identified on at least one separate plan sheet.



Phased plan requirement < 10 but > 5 acres - ✔◻✔◻at least two separate plan phases are required -
initial land disturbance phase - stabilization phase



Phased plan requirement ≥ 10 acres - ✔◻✔◻at least 3 separate plan phases are required - initial land
disturbance phase - construction phase - stabilization phase



All compliance inspection must include invesg. of, at a minimum of 5 of the following - ✔◻✔◻1. areas
of site disturbed by construction activity and areas used for storage of materials exposed to
precipitation

2. stormwater conveyance systems for evidence of sediment

3. BMP's identified in OS-SWPPP

, 4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible, nearby d
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




ownstream location if possible. X2 X2 X2




5. Where vehicles enter or exit site for evidence of off-site sediment tracking.
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




inspection frequency after construction begins -
X2 X2 X2 X2 X2




✔◻✔◻at least once a week or within 24 hours of end of storm event >0.5 inches
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Inspection frequency for sites that have reached temporary stablization - ✔◻✔◻Once every month
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Linear site inspection -
X2 X2 X2




✔◻✔◻linear activites may limit access to disturbed areas, in such cases representative inspections may
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




be performed
X2




representative inspections (linear site inspection) - X2 X2 X2 X2 X2




✔◻✔◻personnel must investigate BMP's along the site for 0.25 miles above and below each access poi
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




nt where the site intersects with -roadway - undisturbed right of way - other similar feature-
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Condition along each inspected segment are considered "respresentative" along that reach of constructio
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




n



permittees must record rainfall events of - ✔◻✔◻0.5 inches or greater
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




where should rainfall records be kept - ✔◻✔◻maintained in rain log located as part of the OS-SWPPP
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Inspection reports of rainfall must be -
X2 X2 X2 X2 X2 X2




✔◻✔◻reported on each weekly inspection report and maintained in rain log
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




For each compliance inspecton a report must be completed and include at a mininum -
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




✔◻✔◻1. Inspection date
X2 X2 X2




2. Name, title, qualification of inspector
X2 X2 X2 X2




3. Weather information for period since last inspection
X2 X2 X2 X2 X2 X2

Escuela, estudio y materia

Institución
CEPSCI
Grado
CEPSCI

Información del documento

Subido en
22 de mayo de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EliteStudyHub Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
74
Miembro desde
1 año
Número de seguidores
5
Documentos
8739
Última venta
1 día hace
Elite Study Hub

I provide high-quality, well-organized academic study materials designed to help students excel in their exams and coursework. My resources include test banks, study guides, solution manuals, and practice exams across nursing, business, psychology, and health sciences. Each document is carefully structured, up-to-date, and focused on key concepts, exam preparation, and real understanding—not just memorization. I aim to make studying more efficient and help you achieve top grades with confidence. What You’ll Find in My Store: Test Banks (All Chapters Covered) Study Guides &amp; Review Notes Practice Exams with Answers NCLEX, HESI, ATI Preparation Materials Case Studies &amp; Clinical Scenarios Solution Manuals (Step-by-step explanations) Why Choose My Materials? ✔ Latest updates (2024–2027 content) ✔ Clear explanations &amp; structured format ✔ Exam-focused and easy to follow ✔ Trusted by students for high performance Subjects Covered: Nursing | Pharmacology | Psychology | Business | Accounting | Biology | Public Health | And more Support: If you have any questions or need help finding specific materials, feel free to reach out—I’m here to help you succeed.

Lee mas Leer menos
2.2

9 reseñas

5
2
4
0
3
1
2
1
1
5

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes