Written agreement - ANSWER1-1a: The CONTRACT covering the construction project is a(n) _____ between LADOTD and the contractor. Invitation to Bid - ANSWER1-1b: Which document asks the contractor to submit a cost bid for a project? Plans - ANSWER1-1c: Contractors base their bid on the materials and labor necessary to construct the highway project. Which document tells the contractor WHAT to construct and WHERE to construct it?

Vista previa del contenido

LADOTD HIGHWAY PLAN READING I
QUESTIONS & ANSWERS
Written agreement - ANSWER1-1a: The CONTRACT covering the construction project
is a(n) _____ between LADOTD and the contractor.

Invitation to Bid - ANSWER1-1b: Which document asks the contractor to submit a cost
bid for a project?

Plans - ANSWER1-1c: Contractors base their bid on the materials and labor necessary
to construct the highway project. Which document tells the contractor WHAT to
construct and WHERE to construct it?

Standard, Supplemental, Special - ANSWER1-1d: List the three categories regarding
specs for a project

Proposal - ANSWER1-1e: After the contractor completes an estimate, they fill out and
submit a _____

Notice to Proceed - ANSWER1-1f: The Dept issues a(n) _____ allowing the contractor
to start a project.

Plan Changes/Special Agreements - ANSWER1-1g: What can change the contract after
the start of the project?

Plans - ANSWER1-1h: Which documents are the most referenced when used to
inspect; what, where, and how the contractor builds?

Change Orders - ANSWER1-1i: Record the name of the document the project engineer
prepares when a change in plans is required.

Change order - ANSWEROccasionally, a contractor must preform extra work, to
complete the project. Prior to the contractor performing the work, the Chief Engineer
signs a _______.

Special Provisions - ANSWER1-2a: Which specs apply to only a specific project under
contract?

Standard Specs - ANSWER1-2b: What specs apply to all projects?

Special Specs - ANSWER1-2c: Special directions applicable to specific projects are
_____.

, Supplemental Specs - ANSWER1-2d: A revision or amendment to the Standard Specs
is a ______.

1. Special, 2. Plans, 3. Supplemental, 4.Standard - ANSWER1-3a (1-4): List the
PROCEDURAL ORDER TO FOLLOW with regard to the clarification of possible
contract discrepancies.

Interpret - ANSWER1-4a: To read a set of plans it is important to accurately _____ and
understand what is meant by each drawing an notation.

What and Where - ANSWER1-4b: The plans indicate ____ to build and _____ to build a
project.

Relate - ANSWER1-4c: Sheets within a set of plans _____ to each other. Info pertaining
to a particular feature of the project often appears on more than one sheet.

Clean and in order - ANSWER1-4d:It is very important to keep a plan set _____ and in
_____.

Federal, State - ANSWER2-2a. There are two types of project numbers used to identify
a project. (DRAIN CANAL BRIDGES ON US HWY 90)

State Project #, Federal Project #, Project Name - ANSWER2-4a. List the three things
on the Title Sheet that identify a project. (DRAIN CANAL BRIDGES ON US HWY 90)

Project Caption, Title Block, Layout Map - ANSWER2-6a. List three places on the Title
Sheet that indicate the State Project Number. (DRAIN CANAL BRIDGES ON US HWY
90)

Federal-funding categories - ANSWER2-8. Prefix Acronyms such as STP, I, BR, etc are
______.

Surface Transportation Program - ANSWERSTP

Interstate - ANSWERI

Bridge Replacement - ANSWERBR

Interstate Maintenance - ANSWERIM

National Highway Systems projects - ANSWERNH

Emergency Relief projects - ANSWERER

Intermodal Surface Transportation Efficiency Act of 1991 (FHWA Partial Payment) -
ANSWERISTEA

Información del documento

Subido en
22 de mayo de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
shantelleG
4.0
(118)
Vendido
650
Seguidores
369
Artículos
18317
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes