For edges not along longitudinal joints, the surface within the 6 inches adjacent to the edge shall not vary more than - ANSWER1/4" Conventional forms will not be required at slab edges along longitudinal joints, provided the surface within the 6 inch width adjacent to the edge does not vary more than - ANSWER1/8"

Vista previa del contenido

PCC PAVING INSPECTION LADOTD
QUESTIONS & SOLUTIONS
For edges not along longitudinal joints, the surface within the 6 inches adjacent to the
edge shall not vary more than - ANSWER1/4"

Conventional forms will not be required at slab edges along longitudinal joints, provided
the surface within the 6 inch width adjacent to the edge does not vary more than -
ANSWER1/8"

Texturing of the concrete is to be done using a _______ and a ________ texturing
device - ANSWERcarpet drag; metal tine

The carpet drag must be reasonably free from indentions over - ANSWER1/16" deep

In slip form paving, the drag is usually attached to the - ANSWERlongitudinal float
machine

Two approved methods of floating are - ANSWERmechanical and hand held

The longitudinal tube float is set at a __ angle to the centerline of the slab. -
ANSWER45 degree

Following the mechanical, longitudinal tube float, the _____________ float may be used
to smooth and fill open textured pavement areas. - ANSWERhand held

The vibratory, longitudinal bull float is only used - ANSWERover joints

T/F Excess water and loose material should be removed from the surface with a 10 foot,
metal, static straightedge. - ANSWERTrue

T/F The handle of a straightedge must be approximately 5 foot longer than 1/2 the width
of the pavement slab. - ANSWERFalse

T/F When working the straightedge, the blade is first worked at a 45 degree angle to the
centerline and then with the blade parallel to the centerline. - ANSWERTrue

T/F The straightedge operations should advance along the concrete slab in successive
stages of 5 feet. - ANSWERTrue

T/F When performing straightedge operations, water may be thrown on the surface to
make the work easier. - ANSWERFalse

, If the application of water to the concrete surface is permitted during finishing
operations, it shall be applied as - ANSWERfog spray

Screeds yield the _____ grade of the concrete slab - ANSWERinitial

_________ finishing will be required on all highway pavements or _____, regardless of
width. - ANSWERMachine; ramps

Under what conditions will hand finishing be permitted? - ANSWER1. If mechanical
equipment breaks down. 2. Pavement not a principal highway and width does not
exceed 16 ft. 3. Area has regular dimensions.

T/F A strike off bar is used to level the concrete. - ANSWERTrue

T/F Prior to concrete placement and the paver in place, th DOTD Inspector should use a
string line to make sure the strike off is true to line. - ANSWERTrue

T/F A toothed rake is used for leveling concrete. - ANSWERFalse

T/F Vibrators must be operated at least 20 seconds in each place. - ANSWERFalse

T/F Over vibration of the concrete mixture will cause the mortar to rise to the top surface
of the pavement slab. - ANSWERTrue

T/F Proper consolidation of a concrete mixture is achieved when submerged coarse
aggregate has come to the top of the pavements surface. - ANSWERFalse

T/F Machine vibrators must automatically start and stop vibrations when the machine
starts and stops. - ANSWERTrue

T/F Hand held vibrators are used to consolidate t and compact concrete around joint
assemblies. - ANSWERTrue

T/F If a dowel assembly is knocked out of alignment and damaged, it must dug out and
reinstalled at its proper location. - ANSWERtrue

T/F With the exception of finishing equipment, mechanical equipment must not be
allowed to operate on an existing pavement until the pavement has attained a
compressive strength of at least 4000 psi - ANSWERfalse

T/F Finishing equipment will be allowed to ride on existing pavement after three days of
curing above 40 degrees F, as long as no damage occurs. - ANSWERTrue

T/F No damage will be done if fresh concrete, placed to an existing slab, fills in the tine
finish on the existing pavement. - ANSWERFalse

Información del documento

Subido en
22 de mayo de 2026
Número de páginas
10
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
shantelleG
4.0
(118)
Vendido
650
Seguidores
369
Artículos
18317
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes