Examen

Nwsa Ttt-2 Study Guide Questions And Correct Answers (Verified) | Latest Update 2026/2027 | Graded A+ | Brand New | 100% Guaranteed Pass

Document preview thumbnail
Vista previa 4 fuera de 38 páginas

NWSA TTT-2 STudy Guide QueSTiONS ANd CORReCT ANSWeRS (VeRiFied) | LATeST uPdATe 2026/2027 | GRAded A+ | BRANd NeW | 100% GuARANTeed PASS

Vista previa del contenido

NWSA TTT-2 STudy Guide QueSTiONS ANd CORReCT ANSWeRS
(VeRiFied) | LATeST uPdATe 2026/2027 | GRAded A+ | BRANd NeW |
100% GuARANTeed PASS




Which role is responsible for identifying existing and predictable hazards and has the authority
to correct them?

A. Authorized Person

B. Competent Person

C. Qualified Person

D. Installer - ANSWER-A



A "qualified person" is best described as:

A. Anyone trained by employer

B. One who can supervise work

C. One with recognized degree/cert/experience to solve problems

D. Any foreman



Ref: OSHA 1926.32(m) - ANSWER-C



Which document is most directly used to control work steps and hazards for a specific task?

A. RF plot

B. JHA/JSA

C. Invoice

D. As-built Ref: OSHA safety planning concepts - ANSWER-B



When must a rescue plan be in place?

A. After First Climb

B. Before Work Begins

C. Only if >200ft

,D. Only if a hoist is used



Ref: ANSI Z359 (rescue) + OSHA Expectations - ANSWER-B



Which is the best order for hazard controls?

A. PPE->Engineering->Admin

B. Engineering->PPE->Elimination

C. Elimination->Substitution->Engineering->Administrative->PPE

D. Administrative->PPE->Elimination



Ref: OSHA Hazard Control Hierarchy (General Safety Doctrine) - ANSWER-C



Who must verify component compatibility in a fall arrest system?

A. Any climber

B. Qualified Person/Competent Person per Plan

C. Customer

D. Safety Observer only



Ref: ANSI Z359 Guidance + NWSA Planning Items - ANSWER-B



What's the best definition of "Fall Restraint?"

A. Stops fall after it happens

B. Prevents reaching fall hazard

C. Uses Deceleration Device

D. Requires Rescue System



Ref: ANSI Z359 Fall Protection Code - ANSWER-B



What is the primary purpose of a pre-task plan ("PTP")?

A. Billing

B. Identify Hazards + Define Controls + Roles

C. Determine RF License

,D. Choose Paint Color



Ref: ANSI/ASSP A10-Series Planning - ANSWER-B



An "Authorized Person" is typically:

A. Engineer

B. Person Approved to perform duties requiring protection

C. OSHA Inspector

D. Tower Owner



Ref: ANSI Z359 Definitions - ANSWER-B



Which is a leading indicator?

A. Recordable Rate

B. Near-Miss Reporting

C. Workers' Comp Costs

D. Fatality Count



Ref: ASSP A10 Program Concepts - ANSWER-B



A "Stop Work" Authority Should Be:

A. Limited to Management

B. Limited to Safety Director

C. Available to ALL Workers

D. Only for RF Hazards



Ref: A10 Safety Practice Expectations; NSWA Ref. Set. - ANSWER-C



When weather changes (Gusts, Lightning, etc.), the correction action is to:

A. Finish Quickly

B. Continue if behind schedule

C. Reassess Hazards and Suspend as Needed

, D. Only Notify Customer



Ref: A10.48 Safe Work Practices Concept - ANSWER-C



If a procedure conflicts with a manufacturer instruction, you should follow:

A. The cheapest option

B. The Manufacturer Instruction (unless engineered alternative approved)

C. The Newest Employee

D. None of the Above



Ref: A10.48 + ANSI Z359 Manufacturer Instructions Emphasis - ANSWER-B



What is the purpose of a tailored(tailgate)/"toolbox" talk?

A. Payroll

B. Verify Hazards, Controls & Task Sequencing

C. RF Exposure Mapping

D. FAA Notice Filing



REF: A10 Safety Practice Expectations - ANSWER-B



Which is most likely a "Critical Lift?"

A. Hand-Carry Tools

B. Hoisting a large antenna over active antenna lines

C. Climbing 20 ft

D. Sweeping Coax



Ref: A10.48 Rigging/Hoisting Planning Concepts + B30 Series Awareness - ANSWER-B



A crew member reports damaged gear. The correct action to take is:

A. Tape it

B. Remove it from service pending evaluation

C. Use only at low height

Información del documento

Subido en
20 de mayo de 2026
Número de páginas
38
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DoctorDee
3.5
(6)
Vendido
43
Seguidores
7
Artículos
6155
Última venta
3 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes