What is the definition of soil and foundation work? - ANSWERGrading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock When contractors use light duty two-point adjustable suspended scaffolds in NYC, what - ANSWER¾'' grade #1 unspliced manila rope

Vista previa del contenido

SSM TEST REVIEW QUESTIONS &
ANSWERS
What is the definition of soil and foundation work? - ANSWERGrading in soil or
installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in
soil or rock

When contractors use light duty two-point adjustable suspended scaffolds in NYC, what
- ANSWER¾'' grade #1 unspliced manila rope

At what grade must power buggy brakes be capable of being fixed in engagement to
hold a full load stationary? - ANSWER25% grade

The definition of _____________ is: a horizontal transverse scaffold member (which
may be supported by legs or runners) upon which the scaffold platform rests and joins
scaffold uprights, posts, poles, and similar members - ANSWERBearer (putlog)

The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to
the curb at least 20 feet beyond the building line when construction is_______ -
ANSWERgreater than 100 feet

In structures undergoing demolition, how must the existing sprinkler system be
maintained - ANSWERNon-automatic and Siamese hose connections shall be marked
by a metal sign reading "Sprinkler Siamese Connection" and by a red-light bulb at night

A ramp for a power buggy must be designed to support how many times the maximum
intended live load - ANSWER4

The permanent floors of skeleton steel construction shall be installed as soon as
possible as steel installation progresses. In no case shall there be more than
_________ or equivalent levels or __________, whichever is less, between the erection
floor and the uppermost permanent floor. - ANSWER8 stories, 120 feet

If an open excavation has been discontinued or interrupted for at least ___ months, the
lot shall be filled and graded to eliminate all steep slopes, holes, obstructions, or similar
sources of hazard. - ANSWER3

Excavated material and superimposed loads such as equipment, trucks, etc., shall not
be placed closer to the edge of the excavation than a distance equal __________ the
depth of such excavation, unless the excavation is in rock or unless the sides of the
excavation have been sloped or sheet piled (or sheeted) and shored to withstand the
lateral force imposed by such superimposed loads. - ANSWERto one and one-half
times

, The Commissioner shall inquire into the cause of any accident involving equipment.
When an accident involves any piece of equipment on the site, no person shall do the
following without the permission of the Commissioner: - ANSWERUse such equipment
or remove the equipment or any part thereof from the area of the job site

According to 3314.8.2, the scaffold shall be enclosed with debris netting consisting of a
wire screen comprised of not less than _____ wire mesh, or equivalent synthetic with a
maximum _________ mesh. - ANSWERNo. 18 steel, one-half inch

According to NYC DOB, how many years is the 32-Hour Rigging Supervisor Training
valid for and how many hours is the required refresher course? - ANSWER4 years and
16 hours

Specific to foundation operations that affect adjacent properties: The owner of the
property that may be affected shall be given ____ days written notice of the intention to
perform such operations. - ANSWER10

According to Chapter 3301, any construction equipment that would affect public safety
must be inspected before use with the exception of - ANSWERHand tools

Who shall inspect construction equipment that might affect public safety before it is
used for a specific job at the construction site? - ANSWERCompetent person
designated by the contractor

What are the four main suspended scaffolds inspections mandated by the NYC Building
Code (Chapter 33 Section 3314-scaffolds)? - ANSWERPrior to installation, installation
inspection, pre-shift, and after repair or adjustment.

Whenever the working deck reaches a height greater than ____ stories, at least one
elevator must be kept in readiness for the fire department? - ANSWER7

If the top deck of the sidewalk shed is not built solidly against the face of the structure in
such a manner that no material can fall onto the sidewalk, what must be done? -
ANSWERThe side of the shed toward the structure shall be solidly sealed with wood or
other suitable material for the full height of the shed

Specific to regulations in NYC about erecting/removing wood pole scaffolds: When a
new working level is desired, the existing________ shall be left undisturbed until the
new working level is framed. - ANSWERPlanks

Sidewalk shed decks on buildings less than 100 feet in height may be designed and
constructed to carry live loads of how many pounds per square foot? - ANSWER. 150
lbs.

Construction fences must be at least ___ feet high and the new color requirement is? -
ANSWER8/Hunter Green

Información del documento

Subido en
20 de mayo de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
shantelleG
4.0
(118)
Vendido
650
Seguidores
369
Artículos
18317
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes