Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

ACI Test Questions with Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

ACI Test Questions with Complete Solutions

Vista previa del contenido

ACI Test Questions with Complete
Solutions9

The total time allowed between obtaining the first and final portions of a composite sample is -
ANSWERS-15 minutes



When it is necessary to wet sieve the concrete sample, wet sieving should be performed after
the individual samples are remixed into a composite sample (T or F) - ANSWERS-F



Tests for slump, temperature, and air content must begin within ______ minutes after obtaining
the composite sample - ANSWERS-5 minutes



Begin molding test specimens within ______ minutes after obtaining the composite sample -
ANSWERS-15 minutes



The concrete samples should be protected from - ANSWERS-the sun, wind, and other sources of
rapid evaporation, from contamination



When test specimens are to be molded, the minimum size of sample obtained is - ANSWERS-28
L (1 ft^3)



The primary objective of the sampling process is to obtain a representative sample (T or F) -
ANSWERS-T



When sampling from a revolving drum truck mixer collect concrete from ______ portions of the
batch - ANSWERS-2 or more

, Wet sieving is performed - ANSWERS-when the concrete contains aggregates larger than
appropriate for a test



When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub
grade in order to obtain the required samples of concrete (T or F) - ANSWERS-F



TEMPERATURE - ANSWERS-



it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is
greater than ___ - ANSWERS-20min., 3in.



The container for the concrete shall be large enough to provide at least ___ inches, or _____ of
coarse agg, of concrete in all directions around the TMD - ANSWERS-3in., 3 x NMS



The temperature measuring device shall have the capability of measuring the temperature of
the freshly mixed concrete to ± ______ oF accuracy and have a

range of ______ to ______ oF. - ANSWERS-1,30to120



A composite sample of concrete is not required even if the only purpose for obtaining the
sample is to determine temperature. T or F - ANSWERS-T



The Temperature Measuring Device used for determining concrete temperature must be
calibrated ______ or whenever there is a question of accuracy. - ANSWERS-annually



The temperature of freshly mixed concrete can be measured in - ANSWERS-all of the above



Submerge the sensing portion of the thermometer at least ______ inches into the concrete -
ANSWERS-3

Información del documento

Subido en
14 de mayo de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
wanjejer1900
2.0
(1)
Vendido
7
Seguidores
0
Artículos
1411
Última venta
3 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes